| Details of Planning Application -
CB/18/01480/FULL |
| Application registered | Consultation period | Awaiting decision | Decided | Appeal | Appeal decided |
|
|---|
| Application Type: | Full Application |
|---|
| Date Received: | 09
/
04
/
2018 |
|---|
| Registration (Validation) Date: | 09
/
04
/
2018 |
|---|
| Consultation Start Date: | 09
/
04
/
2018 |
|---|
| Earliest Decision Date (Consultation Period Expires): | 25
/
05
/
2018 |
|---|
| Target Date for Decision: | 04
/
06
/
2018 |
|---|
| Location: | Infinity House, 11 Commerce Way, Leighton Buzzard, LU7 4RW |
|---|
| Parish Name: | Leighton-Linslade |
|---|
| Conservation Area: | Not available |
|---|
| Listed Building Grade: | Not available |
|---|
| Environmental Assessment: | Not available |
|---|
| Expected Decision Level: | Not available |
|---|
| Description: | Remove the brick constructed warehouse flank wall on the south side (Road facing) of the building and replace with glass curtain walling and new Reception entrance doorway with canopy. Create disabled access to new Reception doors. Form new openings through North and East elevations and install new windows and doors. Replace corrugated asbestos roof to main building with powder coated insulated composite panels. Create raised decking area to Eastern elevation with balustrade surround. Install external airconditioning units at rear of building concealed from roadside view. Increase area of hardstanding in front carpark to create disabled parking and additional spaces while not affecting existing mature trees and preserving a substantial grass verge between pavement and carpark. Render East elevation of existing office block in sympathy with existing style. Install new external low level carpark lighting. |
|---|
| Case Officer: | Caroline Macrdechian |
|---|
| Case Officer Tel: | 0300 300 5693 |
|---|
| Case Officer Email: | caroline.macrdechian@centralbedfordshire.gov.uk |
|---|
| Status: | Decided |
|---|
| Agent: | Not available |
|---|
| Press Date: | No date |
|---|
| Site Notice Date: | 01
/
05
/
2018 |
|---|
| Neighbours | Responses Received:
0 |
|---|
| and Representatives: | In Favour:
0 |
|---|
| Representation Details | Against:
0 |
|---|
| Comments:
0 |
|---|
| Petitions Against:
0 |
|---|
| Petitions For:
0 |
|---|
| Officer Site Visit Date: | 01/05/2018 |
|---|
| Committee Site Visit Date: | No date |
|---|
| Committee Meeting Date: | No date |
|---|
| Decision Level: | Officer Delegated |
|---|
| Date Decision Made: | 06
/
06
/
2018 |
|---|
| Date Decision Despatched: | 06
/
06
/
2018 |
|---|
| Decision: | Full Application - Granted |
|---|
| Conditions or Reasons: | View Conditions or Reasons |
|---|
| Informative Notes: | | 1
)The decision notice does not give consent for the additional advertisements that are shown on the submitted plans to which separate consent under The Town and Country Planning (Control of Advertisements) (England) Regulation 2007 may be required.The decision notice does not give consent for the additional advertisements that are shown on the submitted plans to which separate consent under The Town and Country Planning (Control of Advertisements) (England) Regulation 2007 may be required. |
| 2
)This permission relates only to that required under the Town & Country Planning Acts and does not include any consent or approval under any other enactment or under the Building Regulations. Any other consent or approval which is necessary must be obtained from the appropriate authority.This permission relates only to that required under the Town & Country Planning Acts and does not include any consent or approval under any other enactment or under the Building Regulations. Any other consent or approval which is necessary must be obtained from the appropriate authority. |
| 3
)In accordance with Article 35 (1) of the Town and Country Planning (Development Management Procedure) (England) Order 2015, the reason for any condition above relates to the Policies as referred to in the South Bedfordshire Local Plan Review (SBLPR) and the National Planning Policy Framework (NPPF).In accordance with Article 35 (1) of the Town and Country Planning (Development Management Procedure) (England) Order 2015, the reason for any condition above relates to the Policies as referred to in the South Bedfordshire Local Plan Review (SBLPR) and the National Planning Policy Framework (NPPF). |
| 4
)The applicant is advised that the requirements of the New Roads and Street Works Act 1991 will apply to any works undertaken within the limits of the existing public highway. Further details can be obtained from the Traffic Management Group Highways and Transport Division, Central Bedfordshire Council, Priory House, Monks Walk, Chicksands, Shefford, Bedfordshire, SG17 5TQ.The applicant is advised that the requirements of the New Roads and Street Works Act 1991 will apply to any works undertaken within the limits of the existing public highway. Further details can be obtained from the Traffic Management Group Highways and Transport Division, Central Bedfordshire Council, Priory House, Monks Walk, Chicksands, Shefford, Bedfordshire, SG17 5TQ. |
|
|---|
| Appeal Received Date: | This case has no appeals against it |
|---|
| Planning Obligation Status: | Not available |
|---|