1. Return to Search Page >>2. Search Results >>3. Planning Application Detail
Details of Planning Application - CB/18/03154/OUT

Click on the Consultation link below for neighbour and statutory consultee information and to comment on this application. Ensure your opinions are received before the consultation closing date.


Application Details View Documents (opens in new window) Consultation
Application registeredConsultation periodAwaiting decisionDecidedAppealAppeal decided
Application Type:Outline Application
Date Received:15 / 08 / 2018
Registration (Validation) Date:13 / 09 / 2018
Consultation Start Date:13 / 09 / 2018
Earliest Decision Date (Consultation Period Expires):25 / 12 / 2018
Target Date for Decision:08 / 11 / 2018
Location:The Old Orchard, Water End Road, Maulden
Parish Name:Maulden
Conservation Area:Not available
Listed Building Grade:Not available
Environmental Assessment:Not available
Expected Decision Level:Not available
Description:Erection of two dwelling-houses
Case Officer:Benjamin Tracy
Case Officer Tel:0300 300 4775
Case Officer Email:benjamin.tracy@centralbedfordshire.gov.uk
Status:Decided
Agent:Mr S Connell
Bedford I-Lab
Stannard Way
Priory Business Park
Bedford
MK44 3RZ
Press Date:No date
Site Notice Date:12 / 10 / 2018
NeighboursResponses Received: 1
and Representatives:In Favour: 0
Representation DetailsAgainst: 1
Comments: 0
Petitions Against: 0
Petitions For: 0
Officer Site Visit Date:12/10/2018
Committee Site Visit Date:No date
Committee Meeting Date:No date
Decision Level:Not available
Date Decision Made:08 / 03 / 2019
Date Decision Despatched:08 / 03 / 2019
Decision:Outline Application - Granted
Conditions or Reasons:View Conditions or Reasons
Informative Notes:
1 )This permission relates only to that required under the Town & Country Planning Acts and does not include any consent or approval under any other enactment or under the Building Regulations. Any other consent or approval which is necessary must be obtained from the appropriate authority.This permission relates only to that required under the Town & Country Planning Acts and does not include any consent or approval under any other enactment or under the Building Regulations. Any other consent or approval which is necessary must be obtained from the appropriate authority.
2 )The developer is advised of the proximity to the site to a wood processing facility, which is a commercial activity which generates noise. The developer is advised to minimise the audibility of such activities in proximity to the site, through design.The developer is advised of the proximity to the site to a wood processing facility, which is a commercial activity which generates noise. The developer is advised to minimise the audibility of such activities in proximity to the site, through design.
3 )The applicant is advised that the Bedfordshire & River Ouzel Internal Drainage Board advise that a watercourse on the boundary of, or passing through this site is under the statutory control of the Board. In accordance with the Board's byelaws, no development should take place within 9 metres of bank top, without the Board's prior consent, this includes any planting, fencing or other landscaping. The 9 metres byelaw strip is required by the Board for access for maintenance plant and equipment and for the spread and leveling of arisings, from the watercourse.The applicant is advised that the Bedfordshire & River Ouzel Internal Drainage Board advise that a watercourse on the boundary of, or passing through this site is under the statutory control of the Board. In accordance with the Board's byelaws, no development should take place within 9 metres of bank top, without the Board's prior consent, this includes any planting, fencing or other landscaping. The 9 metres byelaw strip is required by the Board for access for maintenance plant and equipment and for the spread and leveling of arisings, from the watercourse.
Appeal Received Date:This case has no appeals against it
Planning Obligation Status:Not available

Return to Search PageTop of Page