| Details of Planning Application -
CB/18/04237/FULL |
| Application registered | Consultation period | Awaiting decision | Decided | Appeal | Appeal decided |
|
|---|
| Application Type: | Full Application |
|---|
| Date Received: | 15
/
11
/
2018 |
|---|
| Registration (Validation) Date: | 15
/
11
/
2018 |
|---|
| Consultation Start Date: | 15
/
11
/
2018 |
|---|
| Earliest Decision Date (Consultation Period Expires): | 20
/
12
/
2018 |
|---|
| Target Date for Decision: | 10
/
01
/
2019 |
|---|
| Location: | 16 Heath Road, Leighton Buzzard, LU7 3AB |
|---|
| Parish Name: | Leighton-Linslade |
|---|
| Conservation Area: | Not available |
|---|
| Listed Building Grade: | Not available |
|---|
| Environmental Assessment: | Not available |
|---|
| Expected Decision Level: | Not available |
|---|
| Description: | Single storey rear extension and replacement of the external door of the existing utility room with a window. |
|---|
| Case Officer: | William Comber |
|---|
| Case Officer Tel: | 0300 300 6246 |
|---|
| Case Officer Email: | william.comber@centralbedfordshire.gov.uk |
|---|
| Status: | Decided |
|---|
| Agent: | Ms A Swarbrick |
|---|
| 5 Monmouth Road |
|---|
| Harlington |
|---|
| Dunstable |
|---|
| LU5 6NE |
|---|
| Press Date: | No date |
|---|
| Site Notice Date: | No date |
|---|
| Neighbours | Responses Received:
0 |
|---|
| and Representatives: | In Favour:
0 |
|---|
| Representation Details | Against:
0 |
|---|
| Comments:
0 |
|---|
| Petitions Against:
0 |
|---|
| Petitions For:
0 |
|---|
| Officer Site Visit Date: | 30/11/2018 |
|---|
| Committee Site Visit Date: | No date |
|---|
| Committee Meeting Date: | No date |
|---|
| Decision Level: | Officer Delegated |
|---|
| Date Decision Made: | 21
/
12
/
2018 |
|---|
| Date Decision Despatched: | 21
/
12
/
2018 |
|---|
| Decision: | Full Application - Granted |
|---|
| Conditions or Reasons: | View Conditions or Reasons |
|---|
| Informative Notes: | | 1
)In accordance with Article 35 (1) of the Town and Country Planning (Development Management Procedure) (England) Order 2015, the reason for any condition above relates to the Policies as referred to in the South Bedfordshire Local Plan Review (SBLPR) and the National Planning Policy Framework (NPPF).In accordance with Article 35 (1) of the Town and Country Planning (Development Management Procedure) (England) Order 2015, the reason for any condition above relates to the Policies as referred to in the South Bedfordshire Local Plan Review (SBLPR) and the National Planning Policy Framework (NPPF). |
| 2
)This permission relates only to that required under the Town & Country Planning Acts and does not include any consent or approval under any other enactment or under the Building Regulations. Any other consent or approval which is necessary must be obtained from the appropriate authority.This permission relates only to that required under the Town & Country Planning Acts and does not include any consent or approval under any other enactment or under the Building Regulations. Any other consent or approval which is necessary must be obtained from the appropriate authority. |
| 3
)The proposed works will not increase flood risk on or off site and must not alter or impede existing drainage patterns in such a way that flood risk would be increased.The proposed works will not increase flood risk on or off site and must not alter or impede existing drainage patterns in such a way that flood risk would be increased. |
| 4
)Resilient and resilience measures will be included in the design and construction of the works to ensure the development will be safe from the risk of flooding, as per the EAs standing advice listed here: https://www.gov.uk/guidance/flood-risk-assessment-in-flood-zones-2-and-3#extra-flood-resistance-and-resilience-measures.Resilient and resilience measures will be included in the design and construction of the works to ensure the development will be safe from the risk of flooding, as per the EAs standing advice listed here: https://www.gov.uk/guidance/flood-risk-assessment-in-flood-zones-2-and-3#extra-flood-resistance-and-resilience-measures. |
| 5
)Surface water drainage arrangements will be provided for the increase in surface water run off as a result of the proposed works, the adequacy of the design and construction of this should be confirmed by the Building Control Regulation procedures and shall be designed to the standards set out by DEFRA in the Non-statutory technical standards for sustainable drainage systems (DEFRA, 2015).Surface water drainage arrangements will be provided for the increase in surface water run off as a result of the proposed works, the adequacy of the design and construction of this should be confirmed by the Building Control Regulation procedures and shall be designed to the standards set out by DEFRA in the Non-statutory technical standards for sustainable drainage systems (DEFRA, 2015). |
| 6
)The land owner will be responsible for the long term management and maintenance of all surface water drainage within their curtilage.The land owner will be responsible for the long term management and maintenance of all surface water drainage within their curtilage. |
|
|---|
| Appeal Received Date: | This case has no appeals against it |
|---|
| Planning Obligation Status: | Not available |
|---|