Details of Planning Application - CB/18/04553/FULL

Click on the Consultation link below for neighbour and statutory consultee information and to comment on this application. Ensure your opinions are received before the consultation closing date.


Application Details View Documents (opens in new window) Consultation
Application registeredConsultation periodAwaiting decisionDecidedAppealAppeal decided
Application Type:Full Application
Date Received:05 / 12 / 2018
Registration (Validation) Date:20 / 12 / 2018
Consultation Start Date:20 / 12 / 2018
Earliest Decision Date (Consultation Period Expires):01 / 04 / 2019
Target Date for Decision:21 / 03 / 2019
Location:North Star Cottage, Watling Street, Hockliffe, Leighton Buzzard, LU7 9PY
Parish Name:Chalgrave
Conservation Area:Not available
Listed Building Grade:Not available
Environmental Assessment:Not available
Expected Decision Level:Not available
Description:Demolition of existing buildings/structures and retention of the pallet operation and ancillary buildings on site (retrospective) and expansion of the operation's facilities.
Case Officer:Caroline Macrdechian
Case Officer Tel:0300 300 5693
Case Officer Email:caroline.macrdechian@centralbedfordshire.gov.uk
Status:Decided
Agent:Ms Dietz
16 St. Cuthberts Street
Bedford
MK40 3JG
Press Date:08 / 01 / 2019
Site Notice Date:22 / 01 / 2019
NeighboursResponses Received: 0
and Representatives:In Favour: 0
Representation DetailsAgainst: 0
Comments: 0
Petitions Against: 0
Petitions For: 0
Officer Site Visit Date:22/01/2019
Committee Site Visit Date:No date
Committee Meeting Date:24 / 04 / 2019
Decision Level:Development Management Committee
Date Decision Made:03 / 04 / 2019
Date Decision Despatched:20 / 08 / 2019
Decision:Full Application - Granted
Conditions or Reasons:View Conditions or Reasons
Informative Notes:
1 )If the applicant does not wish to balance the flows as set out in condition 12 to that equivalent to the present peak discharge from the undeveloped land then the Board will require a once and for all payment. This charge will be based on a rate of £5 per metre square of impermeable area discharging to the watercourse.If the applicant does not wish to balance the flows as set out in condition 12 to that equivalent to the present peak discharge from the undeveloped land then the Board will require a once and for all payment. This charge will be based on a rate of £5 per metre square of impermeable area discharging to the watercourse.
2 )In respect of condition 13, the applicant's attention is drawn to the comments provided by the Council's SuDS Officer: We consider that planning permission could be granted to the proposed development and the final design and maintenance arrangements for the surface water system agreed at the detailed design stage, if the following recommendations and planning conditions are secured. 1. The watercourse to be discharged in to should be part of the management plan. 2. Permeable surfaces are a better option for parking or machinery areas. Where the use of permeable surfacing is proposed, this should be designed in accordance with the 'CIRIA RP992 The SuDS Manual Update: Paper RP992/28: Design Assessment Checklists for Permeable/Porous Pavement'. 3. The final detailed design including proposed standards of operation, construction, structural integrity and ongoing maintenance must be compliant with the 'Non-statutory technical standards for sustainable drainage systems' (March 2015, Ref: PB14308), 'Central Bedfordshire Sustainable Drainage Guidance' (Adopted April 2014, Updated May 2015),and recognised best practise including the Ciria SuDS Manual (2016, C753). 4. To ensure future owners will be aware of any maintenance requirements /responsibilities for surface water drainage, including ditches; further measures should be proposed by the applicant and may include, for example, information provided to a purchaser of the property and also designation/registration of the SuDS so that it appears as a Land Charge for the property and as such is identified to subsequent purchasers of the property. 5. Land drainage Consent under the Land Drainage Act 1991 must be secured to discharge surface water to an existing watercourse/ditch, and details of this provided with the full detailed design. The agreement and rate (l/s) must be included in relevant correspondence. 6. An easement should be provided on the developable side of the watercourse to allow for access for maintenance, this should be 9m but may depend on the maintenance requirements considered appropriate.In respect of condition 13, the applicant's attention is drawn to the comments provided by the Council's SuDS Officer: We consider that planning permission could be granted to the proposed development and the final design and maintenance arrangements for the surface water system agreed at the detailed design stage, if the following recommendations and planning conditions are secured. 1. The watercourse to be discharged in to should be part of the management plan. 2. Permeable surfaces are a better option for parking or machinery areas. Where the use of permeable surfacing is proposed, this should be designed in accordance with the 'CIRIA RP992 The SuDS Manual Update: Paper RP992/28: Design Assessment Checklists for Permeable/Porous Pavement'. 3. The final detailed design including proposed standards of operation, construction, structural integrity and ongoing maintenance must be compliant with the 'Non-statutory technical standards for sustainable drainage systems' (March 2015, Ref: PB14308), 'Central Bedfordshire Sustainable Drainage Guidance' (Adopted April 2014, Updated May 2015),and recognised best practise including the Ciria SuDS Manual (2016, C753). 4. To ensure future owners will be aware of any maintenance requirements /responsibilities for surface water drainage, including ditches; further measures should be proposed by the applicant and may include, for example, information provided to a purchaser of the property and also designation/registration of the SuDS so that it appears as a Land Charge for the property and as such is identified to subsequent purchasers of the property. 5. Land drainage Consent under the Land Drainage Act 1991 must be secured to discharge surface water to an existing watercourse/ditch, and details of this provided with the full detailed design. The agreement and rate (l/s) must be included in relevant correspondence. 6. An easement should be provided on the developable side of the watercourse to allow for access for maintenance, this should be 9m but may depend on the maintenance requirements considered appropriate.
3 )Please note that the unnumbered drawings submitted in connection with this application have been given unique numbers by the Local Planning Authority. The numbers can be sourced by examining the plans on the View a Planning Application pages of the Council's website www.centralbedfordshire.gov.uk.Please note that the unnumbered drawings submitted in connection with this application have been given unique numbers by the Local Planning Authority. The numbers can be sourced by examining the plans on the View a Planning Application pages of the Council's website www.centralbedfordshire.gov.uk.
Appeal Received Date:This case has no appeals against it
Planning Obligation Status:Not available