1. Return to Search Page >>2. Search Results >>3. Planning Application Detail
Details of Planning Application - CB/19/00032/FULL

Click on the Consultation link below for neighbour and statutory consultee information and to comment on this application. Ensure your opinions are received before the consultation closing date.


Application Details View Documents (opens in new window) Consultation
Application registeredConsultation periodAwaiting decisionDecidedAppealAppeal decided
Application Type:Full Application
Date Received:02 / 01 / 2019
Registration (Validation) Date:21 / 01 / 2019
Consultation Start Date:21 / 01 / 2019
Earliest Decision Date (Consultation Period Expires):27 / 02 / 2019
Target Date for Decision:21 / 08 / 2020
Location:102 Markyate Road, Slip End, Luton, LU1 4BX
Parish Name:Slip End
Conservation Area:Not available
Listed Building Grade:Not available
Environmental Assessment:Not available
Expected Decision Level:Development Management Committee
Description:Proposed New Residential Retirement Care Village with Retirement Living, Assisted Living, High Dependency Care Units, Community Club House, Ancillary Retail Units and Conservatory on a former disused garden nursery and the back garden of 88 Markyate Road. Change of use from unused derelict Land and C3 back garden to C2 Residential Institution. (Resubmission)
Case Officer:Nikolas Smith
Case Officer Tel:07737 671137
Case Officer Email:nikolas.smith2@centralbedfordshire.gov.uk
Status:Decided
Agent:Mr Tay
9 Perseverance Works
London
E2 8DD
Press Date:06 / 02 / 2019
Site Notice Date:No date
NeighboursResponses Received: 1
and Representatives:In Favour: 0
Representation DetailsAgainst: 1
Comments: 0
Petitions Against: 0
Petitions For: 0
Officer Site Visit Date:13/02/2019
Committee Site Visit Date:No date
Committee Meeting Date:14 / 08 / 2019
Decision Level:Development Management Committee
Date Decision Made:21 / 08 / 2020
Date Decision Despatched:21 / 08 / 2020
Decision:Full Application - Granted
Conditions or Reasons:View Conditions or Reasons
Informative Notes:
1 )Where SUDs are proposed; infiltration SUDs should not be located in unsuitable and unstable ground conditions such as land affected by contamination or solution features. Where infiltration SuDS are to be used for surface run-off from roads, car parking and public or amenity areas, they should have a suitable series of treatment steps to prevent the pollution of groundwater. For the immediate drainage catchment areas used for handling and storage of chemicals and fuel, handling and storage of waste and lorry, bus and coach parking or turning areas, infiltration SuDS are not permitted without an Environmental Permit. Further advice is available in the updated CIRIA SUDs manual http://www.ciria.org/Resources/Free_publications/SuDS_manual_C753.aspxWhere SUDs are proposed; infiltration SUDs should not be located in unsuitable and unstable ground conditions such as land affected by contamination or solution features. Where infiltration SuDS are to be used for surface run-off from roads, car parking and public or amenity areas, they should have a suitable series of treatment steps to prevent the pollution of groundwater. For the immediate drainage catchment areas used for handling and storage of chemicals and fuel, handling and storage of waste and lorry, bus and coach parking or turning areas, infiltration SuDS are not permitted without an Environmental Permit. Further advice is available in the updated CIRIA SUDs manual http://www.ciria.org/Resources/Free_publications/SuDS_manual_C753.aspx
2 )If discharge other than from clean roof water is intended, this development is likely to require an Environmental Permit under the Environmental Permitting (England & Wales) Regulations 2010, from the Environment Agency, unless an exemption applies. The applicant is advised to contact the Environment Agency on 03708 506 506 for further advice and to discuss the issues likely to be raised. You should be aware that there is no guarantee that a permit will be granted.  Additional 'Environmental Permitting Guidance' can be found at: https://www.gov.uk/environmental-permit-check-if-you-need-one.If discharge other than from clean roof water is intended, this development is likely to require an Environmental Permit under the Environmental Permitting (England & Wales) Regulations 2010, from the Environment Agency, unless an exemption applies. The applicant is advised to contact the Environment Agency on 03708 506 506 for further advice and to discuss the issues likely to be raised. You should be aware that there is no guarantee that a permit will be granted.  Additional 'Environmental Permitting Guidance' can be found at: https://www.gov.uk/environmental-permit-check-if-you-need-one.
3 )The Environmental Permitting (England & Wales) Regulations 2010 make it an offence to cause or knowingly permit a groundwater activity unless authorised by an Environmental Permit which we will issue. A groundwater activity includes any discharge that will result in the input of pollutants to groundwater.The Environmental Permitting (England & Wales) Regulations 2010 make it an offence to cause or knowingly permit a groundwater activity unless authorised by an Environmental Permit which we will issue. A groundwater activity includes any discharge that will result in the input of pollutants to groundwater.
4 )The site is located above a Principal Aquifer and within Source Protection Zone (SPZ) 3. However, we do not consider this proposal to be High Risk. Therefore, we will not be providing detailed site-specific advice or comments with regards to land contamination issues for this site. The developer should address risks to controlled waters from contamination at the site, following the requirements of the National Planning Policy Framework and the Environment Agency Guiding Principles for Land Contamination, which can be found here: https://www.gov.uk/government/publications/managing-and-reducing-land-contaminationThe site is located above a Principal Aquifer and within Source Protection Zone (SPZ) 3. However, we do not consider this proposal to be High Risk. Therefore, we will not be providing detailed site-specific advice or comments with regards to land contamination issues for this site. The developer should address risks to controlled waters from contamination at the site, following the requirements of the National Planning Policy Framework and the Environment Agency Guiding Principles for Land Contamination, which can be found here: https://www.gov.uk/government/publications/managing-and-reducing-land-contamination
5 )The water environment is potentially vulnerable and there is an increased potential for pollution from inappropriately located and/or designed infiltration (SuDS). We consider any infiltration (SuDS) greater than 2.0 m below ground level to be a deep system and are generally not acceptable. If the use of deep bore soakaways is proposed, we would wish to be re-consulted. All infiltration SuDS require a minimum of 1.2 m clearance between the base of infiltration SuDS and peak seasonal groundwater levels. All need to meet the criteria in our Groundwater Protection: Principles and Practice (GP3) position statements G1 to G13 which can be found here: https://www.gov.uk/government/collections/groundwater-protection. In addition, they must not be constructed in ground affected by contamination.The water environment is potentially vulnerable and there is an increased potential for pollution from inappropriately located and/or designed infiltration (SuDS). We consider any infiltration (SuDS) greater than 2.0 m below ground level to be a deep system and are generally not acceptable. If the use of deep bore soakaways is proposed, we would wish to be re-consulted. All infiltration SuDS require a minimum of 1.2 m clearance between the base of infiltration SuDS and peak seasonal groundwater levels. All need to meet the criteria in our Groundwater Protection: Principles and Practice (GP3) position statements G1 to G13 which can be found here: https://www.gov.uk/government/collections/groundwater-protection. In addition, they must not be constructed in ground affected by contamination.
6 )Any facilities, above ground, for the storage of oils, fuels or chemicals shall be sited on impervious bases and surrounded by impervious bund walls. The volume of the bunded compound should be at least equivalent to the capacity of the tank plus 10%. All filling points, vents, gauges and sight glasses must be located within the bund. The drainage system of the bund shall be sealed with no discharge to any watercourse, land or underground strata. Associated pipework should be located above ground and protected from accidental damage. All filling points and tank overflow pipe outlets should be detailed to discharge into the bund. Any facilities, above ground, for the storage of oils, fuels or chemicals shall be sited on impervious bases and surrounded by impervious bund walls. The volume of the bunded compound should be at least equivalent to the capacity of the tank plus 10%. All filling points, vents, gauges and sight glasses must be located within the bund. The drainage system of the bund shall be sealed with no discharge to any watercourse, land or underground strata. Associated pipework should be located above ground and protected from accidental damage. All filling points and tank overflow pipe outlets should be detailed to discharge into the bund. 
7 )Prior to being discharged into any watercourse, surface water sewer or soakaway system, all surface water drainage from lorry parks and/or parking areas for fifty car park spaces or more and hardstandings should be passed through an oil interceptor designed compatible with the site being drained. Roof water shall not pass through the interceptor. Prior to being discharged into any watercourse, surface water sewer or soakaway system, all surface water drainage from lorry parks and/or parking areas for fifty car park spaces or more and hardstandings should be passed through an oil interceptor designed compatible with the site being drained. Roof water shall not pass through the interceptor. 
8 )Prior to being discharged into any watercourse, surface water sewer or soakaway system, all surface water drainage from parking areas and hard standings susceptible to oil contamination shall be passed through an oil separator designed and constructed to have a capacity and details compatible with the site being drained. Roof water shall not pass through the interceptor. Prior to being discharged into any watercourse, surface water sewer or soakaway system, all surface water drainage from parking areas and hard standings susceptible to oil contamination shall be passed through an oil separator designed and constructed to have a capacity and details compatible with the site being drained. Roof water shall not pass through the interceptor. 
9 )Foul and surface water manhole covers should be marked to enable easy recognition, convention is red for foul and blue for surface water. This is to enable water pollution incidents to be more readily traced. Foul and surface water manhole covers should be marked to enable easy recognition, convention is red for foul and blue for surface water. This is to enable water pollution incidents to be more readily traced. 
10 )The Environmental Permitting Regulations make it an offence to cause or knowingly permit any discharge that will result in the input of pollutants to surface waters or groundwater.The Environmental Permitting Regulations make it an offence to cause or knowingly permit any discharge that will result in the input of pollutants to surface waters or groundwater.
11 )The applicant is advised that the requirements of the New Roads and Street Works Act 1991 will apply to any works undertaken within the limits of the existing public highway. Further details can be obtained from the Central Bedfordshire Council's Highway Help Desk, P.O.Box 1395, Bedford, MK42 5AN.The applicant is advised that the requirements of the New Roads and Street Works Act 1991 will apply to any works undertaken within the limits of the existing public highway. Further details can be obtained from the Central Bedfordshire Council's Highway Help Desk, P.O.Box 1395, Bedford, MK42 5AN.
12 )The applicant is advised that if it is the intention to request the Central Bedfordshire County Council as Local Highway Authority, to adopt the proposed highways as maintainable at the public expense then details of the specification, layout and alignment, width and levels of the said highways together with all the necessary highway and drainage arrangements, including run off calculations shall be submitted to the Development Planning and Control Group, Central Bedfordshire Council's Highway Help Desk, P.O.Box 1395, Bedford, MK42 5AN. No development shall commence until the details have been approved in writing and an Agreement made under Section 38 of the Highways Act 1980 is in place.The applicant is advised that if it is the intention to request the Central Bedfordshire County Council as Local Highway Authority, to adopt the proposed highways as maintainable at the public expense then details of the specification, layout and alignment, width and levels of the said highways together with all the necessary highway and drainage arrangements, including run off calculations shall be submitted to the Development Planning and Control Group, Central Bedfordshire Council's Highway Help Desk, P.O.Box 1395, Bedford, MK42 5AN. No development shall commence until the details have been approved in writing and an Agreement made under Section 38 of the Highways Act 1980 is in place.
13 )The applicant is advised that in order to comply with Condition ... of this permission it will be necessary for the developer of the site to enter into an agreement with Central Bedfordshire Council as Highway Authority under Section 278 of the Highways Act 1980 to ensure the satisfactory completion of the access and associated road improvements. You are advised to contact the Highways Agreements Officer, Community Services, Central Bedfordshire Council, Priory House, Monks Walk, Chicksands, Shefford SG17 5TQ. E-mail highwaysagreements@centralbedfordshire.gov.uKThe applicant is advised that in order to comply with Condition ... of this permission it will be necessary for the developer of the site to enter into an agreement with Central Bedfordshire Council as Highway Authority under Section 278 of the Highways Act 1980 to ensure the satisfactory completion of the access and associated road improvements. You are advised to contact the Highways Agreements Officer, Community Services, Central Bedfordshire Council, Priory House, Monks Walk, Chicksands, Shefford SG17 5TQ. E-mail highwaysagreements@centralbedfordshire.gov.uK
14 )All roads to be constructed within the site shall be designed in accordance with Central Bedfordshire Council's publication 'Design in central Bedfordshire (Design Supplement 10 Movement, Street and Places' and the Department of the Environment/Department of Transport's 'Manual for Street', or any amendment thereto.All roads to be constructed within the site shall be designed in accordance with Central Bedfordshire Council's publication 'Design in central Bedfordshire (Design Supplement 10 Movement, Street and Places' and the Department of the Environment/Department of Transport's 'Manual for Street', or any amendment thereto.
Appeal Received Date:This case has no appeals against it
Planning Obligation Status:Not available

Return to Search PageTop of Page