1. Return to Search Page >>2. Search Results >>3. Planning Application Detail
Details of Planning Application - CB/19/02163/FULL

Click on the Consultation link below for neighbour and statutory consultee information and to comment on this application. Ensure your opinions are received before the consultation closing date.


Application Details View Documents (opens in new window) Consultation
Application registeredConsultation periodAwaiting decisionDecidedAppealAppeal decided
Application Type:Full Application
Date Received:02 / 07 / 2019
Registration (Validation) Date:13 / 08 / 2019
Consultation Start Date:13 / 08 / 2019
Earliest Decision Date (Consultation Period Expires):11 / 10 / 2019
Target Date for Decision:08 / 10 / 2019
Location:10 High Street, Sutton, Sandy, SG19 2ND
Parish Name:Sutton
Conservation Area:Sutton
Listed Building Grade:Not available
Environmental Assessment:Not available
Expected Decision Level:Not available
Description:Single storey rear extension
Case Officer:Nicola Stevens
Case Officer Tel:0300 300 4454
Case Officer Email:nicola.stevens@centralbedfordshire.gov.uk
Status:Decided
Agent:Not available
Press Date:13 / 09 / 2019
Site Notice Date:10 / 09 / 2019
NeighboursResponses Received: 0
and Representatives:In Favour: 0
Representation DetailsAgainst: 0
Comments: 0
Petitions Against: 0
Petitions For: 0
Officer Site Visit Date:30/08/2019
Committee Site Visit Date:No date
Committee Meeting Date:No date
Decision Level:Officer Delegated
Date Decision Made:15 / 10 / 2019
Date Decision Despatched:15 / 10 / 2019
Decision:Full Application - Granted
Conditions or Reasons:View Conditions or Reasons
Informative Notes:
1 )In accordance with Article 35 (1) of the Town and Country Planning (Development Management Procedure) (England) Order 2015, the reason for any condition above relates to the Policies as referred to in the National Planning Policy Framework (NPPF) and the Core Strategy for North Central Bedfordshire.In accordance with Article 35 (1) of the Town and Country Planning (Development Management Procedure) (England) Order 2015, the reason for any condition above relates to the Policies as referred to in the National Planning Policy Framework (NPPF) and the Core Strategy for North Central Bedfordshire.
2 )This permission relates only to that required under the Town & Country Planning Acts and does not include any consent or approval under any other enactment or under the Building Regulations. Any other consent or approval which is necessary must be obtained from the appropriate authority.This permission relates only to that required under the Town & Country Planning Acts and does not include any consent or approval under any other enactment or under the Building Regulations. Any other consent or approval which is necessary must be obtained from the appropriate authority.
3 )You are advised to note the comments of the Flood Risk Officer as set out below. We do not consider the location of the proposed works to be at increased risk of flooding (source: Environment Agency mapping, 2019). We do not object, and do not consider it necessary to provide detailed comments on the proposal but recommend the following be noted for information: Surface water drainage arrangements shall be provided for any increase in surface water run off as a result of the proposed work/increase in impermeable area, the adequacy of the design and construction of this should be confirmed by Building Control Regulation procedures. Surface water discharge will not increase flood risk on or off site. Risk of surface water flood map (extent of flooding) (Source: Environment Agency, 2019):You are advised to note the comments of the Flood Risk Officer as set out below. We do not consider the location of the proposed works to be at increased risk of flooding (source: Environment Agency mapping, 2019). We do not object, and do not consider it necessary to provide detailed comments on the proposal but recommend the following be noted for information: Surface water drainage arrangements shall be provided for any increase in surface water run off as a result of the proposed work/increase in impermeable area, the adequacy of the design and construction of this should be confirmed by Building Control Regulation procedures. Surface water discharge will not increase flood risk on or off site. Risk of surface water flood map (extent of flooding) (Source: Environment Agency, 2019):
Appeal Received Date:This case has no appeals against it
Planning Obligation Status:Not available

Return to Search PageTop of Page