1. Return to Search Page >>2. Search Results >>3. Planning Application Detail
Details of Planning Application - CB/19/03003/LB

Click on the Consultation link below for neighbour and statutory consultee information and to comment on this application. Ensure your opinions are received before the consultation closing date.


Application Details View Documents (opens in new window) Consultation
Application registeredConsultation periodAwaiting decisionDecidedAppealAppeal decided
Application Type:Listed Building
Date Received:10 / 09 / 2019
Registration (Validation) Date:30 / 09 / 2019
Consultation Start Date:30 / 09 / 2019
Earliest Decision Date (Consultation Period Expires):12 / 11 / 2019
Target Date for Decision:25 / 11 / 2019
Location:6 North Street, Leighton Buzzard, LU7 1EN
Parish Name:Leighton-Linslade
Conservation Area:Leighton Buzzard
Listed Building Grade:Ecclesiastical Two
Environmental Assessment:Not available
Expected Decision Level:Not available
Description:Listed Building: Replacement fascia sign, decoration of shopfront and shutters
Case Officer:Amy Hambling
Case Officer Tel:0300 300 4548
Case Officer Email:amy.hambling@centralbedfordshire.gov.uk
Status:Decided
Agent:Mr Blyth
PO Box 464
Stevenage
SG1 9FZ
Press Date:15 / 10 / 2019
Site Notice Date:08 / 10 / 2019
NeighboursResponses Received: 0
and Representatives:In Favour: 0
Representation DetailsAgainst: 0
Comments: 0
Petitions Against: 0
Petitions For: 0
Officer Site Visit Date:08/10/2019
Committee Site Visit Date:No date
Committee Meeting Date:No date
Decision Level:Officer Delegated
Date Decision Made:20 / 11 / 2019
Date Decision Despatched:20 / 11 / 2019
Decision:Listed Building - Granted
Conditions or Reasons:View Conditions or Reasons
Informative Notes:
1 )The prosed development should be made safe from the risk off flooding in the surrounding area through the use of flood resistant/resilient measures and methods of construction, as they are set out in the document 'Improving the Flood Performance of New Buildings: flood resilient construction (GLG, 2007)'. This is to ensure flood water is kept out of the building as far as possible, and that flood recovery is aided should flooding occur.The prosed development should be made safe from the risk off flooding in the surrounding area through the use of flood resistant/resilient measures and methods of construction, as they are set out in the document 'Improving the Flood Performance of New Buildings: flood resilient construction (GLG, 2007)'. This is to ensure flood water is kept out of the building as far as possible, and that flood recovery is aided should flooding occur.
Appeal Received Date:This case has no appeals against it
Planning Obligation Status:Not available

Return to Search PageTop of Page