Details of Planning Application - CB/19/03294/FULL

Click on the Consultation link below for neighbour and statutory consultee information and to comment on this application. Ensure your opinions are received before the consultation closing date.


Application Details View Documents (opens in new window) Consultation
Application registeredConsultation periodAwaiting decisionDecidedAppealAppeal decided
Application Type:Full Application
Date Received:26 / 09 / 2019
Registration (Validation) Date:15 / 11 / 2019
Consultation Start Date:15 / 11 / 2019
Earliest Decision Date (Consultation Period Expires):03 / 02 / 2020
Target Date for Decision:10 / 01 / 2020
Location:Unit 1, Albone Way, Biggleswade, SG18 8BN
Parish Name:Biggleswade
Conservation Area:Not available
Listed Building Grade:Not available
Environmental Assessment:Not available
Expected Decision Level:Not available
Description:Change of use to grass area to concrete/tarmac for use as external storage area.
Case Officer:William Comber
Case Officer Tel:0300 300 6246
Case Officer Email:william.comber@centralbedfordshire.gov.uk
Status:Decided
Agent:Mr Postlethwaite
8 Woodland Way
Baldock
Herts
SG7 6LR
Press Date:No date
Site Notice Date:26 / 11 / 2019
NeighboursResponses Received: 55
and Representatives:In Favour: 0
Representation DetailsAgainst: 55
Comments: 0
Petitions Against: 0
Petitions For: 0
Officer Site Visit Date:26/11/2019
Committee Site Visit Date:No date
Committee Meeting Date:04 / 03 / 2020
Decision Level:Development Management Committee
Date Decision Made:06 / 03 / 2020
Date Decision Despatched:06 / 03 / 2020
Decision:Full Application - Granted
Conditions or Reasons:View Conditions or Reasons
Informative Notes:
1 )In accordance with Article 35 (1) of the Town and Country Planning (Development Management Procedure) (England) Order 2015, the reason for any condition above relates to the Policies as referred to in the National Planning Policy Framework (NPPF) and the Core Strategy for North Central Bedfordshire.In accordance with Article 35 (1) of the Town and Country Planning (Development Management Procedure) (England) Order 2015, the reason for any condition above relates to the Policies as referred to in the National Planning Policy Framework (NPPF) and the Core Strategy for North Central Bedfordshire.
2 )This permission relates only to that required under the Town & Country Planning Acts and does not include any consent or approval under any other enactment or under the Building Regulations. Any other consent or approval which is necessary must be obtained from the appropriate authority.This permission relates only to that required under the Town & Country Planning Acts and does not include any consent or approval under any other enactment or under the Building Regulations. Any other consent or approval which is necessary must be obtained from the appropriate authority.
3 )Highways Informatives: The applicant is advised that no private surface water drainage system designed as part of a new development, will be allowed to enter any existing highway surface water drainage system. The applicant is advised that the requirements of the New Roads and Street Works Act 1991 will apply to any works undertaken within the limits of the existing public highway. Further details can be obtained by this link on the Council websit http://www.centralbedfordshire.gov.uk/transport/request/dropped-kerb.aspx or contact Central Bedfordshire Council Tel: 0300 300 8301 The applicant is advised that parking for contractor's vehicles and the storage of materials and deliveries associated with this development should take place within the site and not extend into within the public highway without authorisation from the highway authority. If necessary the applicant is advised to contact The Street Works Co-ordinator, Central Bedfordshire Highways, by contacting the Highways Helpdesk 0300 300 8301. Under the provisions of the Highways Act 1980 the developer may be liable for any damage caused to the public highway as a result of demolition/construction of the development hereby approved The contractor and / or client are to ensure that any mud or building material debris such as sand, cement or concrete that is left on the public highway, or any mud arising from construction/demolition vehicular movement, shall be removed immediately and in the case of concrete, cement, mud or mortar not allowed to dry on the highwayHighways Informatives: The applicant is advised that no private surface water drainage system designed as part of a new development, will be allowed to enter any existing highway surface water drainage system. The applicant is advised that the requirements of the New Roads and Street Works Act 1991 will apply to any works undertaken within the limits of the existing public highway. Further details can be obtained by this link on the Council websit http://www.centralbedfordshire.gov.uk/transport/request/dropped-kerb.aspx or contact Central Bedfordshire Council Tel: 0300 300 8301 The applicant is advised that parking for contractor's vehicles and the storage of materials and deliveries associated with this development should take place within the site and not extend into within the public highway without authorisation from the highway authority. If necessary the applicant is advised to contact The Street Works Co-ordinator, Central Bedfordshire Highways, by contacting the Highways Helpdesk 0300 300 8301. Under the provisions of the Highways Act 1980 the developer may be liable for any damage caused to the public highway as a result of demolition/construction of the development hereby approved The contractor and / or client are to ensure that any mud or building material debris such as sand, cement or concrete that is left on the public highway, or any mud arising from construction/demolition vehicular movement, shall be removed immediately and in the case of concrete, cement, mud or mortar not allowed to dry on the highway
4 )The provision of car parking spaces within the approved scheme with the infrastructure in place to enable electric car charging is recommended.The provision of car parking spaces within the approved scheme with the infrastructure in place to enable electric car charging is recommended.
Appeal Received Date:This case has no appeals against it
Planning Obligation Status:Not available