| Informative Notes: | | 1
)This permission relates only to that required under the Town & Country Planning Acts and does not include any consent or approval under any other enactment or under the Building Regulations. Any other consent or approval which is necessary must be obtained from the appropriate authority.This permission relates only to that required under the Town & Country Planning Acts and does not include any consent or approval under any other enactment or under the Building Regulations. Any other consent or approval which is necessary must be obtained from the appropriate authority. |
| 2
)In accordance with Article 35 (1) of the Town and Country Planning (Development Management Procedure) (England) Order 2015, the reason for any condition above relates to the Policies as referred to in the National Planning Policy Framework (NPPF) and the Core Strategy for North Central Bedfordshire.In accordance with Article 35 (1) of the Town and Country Planning (Development Management Procedure) (England) Order 2015, the reason for any condition above relates to the Policies as referred to in the National Planning Policy Framework (NPPF) and the Core Strategy for North Central Bedfordshire. |
| 3
)In order to comply with Condition 4 of this planning permission, the SuDS team have provided the following guidance:
We will require full drainage drawings showing all connections, control features, storage, inverts etc.
We will require a full set of calculations, providing evidence of all surface water retained on site for the 1 in 100 (+40%CC). Any exceedance should be shown with pathways with maximum depths and velocity.
Any watercourses within or adjacent to the site should be included in the maintenance and management plan, even if there is no discharge to them. This would be a riparian ownership issue but leaving it as such is no longer acceptable.
We expect the use of the SuDS management train, single point SuDS will be challenged. Where the use of permeable surfacing is proposed, this should be designed in accordance with the 'CIRIA RP992 The SuDS Manual Update: Paper RP992/28: Design Assessment Checklists for Permeable/Porous Pavement'.
The Council does not, and is not required to, adopt any SuDS feature. It is the responsibility of the applicant to ensure that the surface water drainage system, in its entirety, will be effectively maintained in the long-term. We therefore expect confirmation of the proposed arrangements for maintenance to be provided with the final detailed design, including the future maintenance and operational needs and the responsible bodies for undertaking maintenance (for all public and private drainage components).
The final detailed design including proposed standards of operation, construction, structural integrity and ongoing maintenance must be compliant with the 'Non-statutory technical standards for sustainable drainage systems' (March 2015, Ref: PB14308), 'Central Bedfordshire Sustainable Drainage Guidance' (Adopted April 2014, Updated May 2015), and recognised best practise including the Ciria SuDS Manual (2016, C753).
Land drainage Consent under the Land Drainage Act 1991 must be secured to discharge surface water to an existing watercourse/ditch, and details of this provided with the full detailed design. An easement should be provided on the developable side of the watercourse to allow for access for maintenance, this should be 9m but may depend on the maintenance requirements considered appropriate.
Agreement for the sewerage undertaker is required to discharge into a public system. The agreement and rate (l/s) must be included in relevant correspondence.In order to comply with Condition 4 of this planning permission, the SuDS team have provided the following guidance:
We will require full drainage drawings showing all connections, control features, storage, inverts etc.
We will require a full set of calculations, providing evidence of all surface water retained on site for the 1 in 100 (+40%CC). Any exceedance should be shown with pathways with maximum depths and velocity.
Any watercourses within or adjacent to the site should be included in the maintenance and management plan, even if there is no discharge to them. This would be a riparian ownership issue but leaving it as such is no longer acceptable.
We expect the use of the SuDS management train, single point SuDS will be challenged. Where the use of permeable surfacing is proposed, this should be designed in accordance with the 'CIRIA RP992 The SuDS Manual Update: Paper RP992/28: Design Assessment Checklists for Permeable/Porous Pavement'.
The Council does not, and is not required to, adopt any SuDS feature. It is the responsibility of the applicant to ensure that the surface water drainage system, in its entirety, will be effectively maintained in the long-term. We therefore expect confirmation of the proposed arrangements for maintenance to be provided with the final detailed design, including the future maintenance and operational needs and the responsible bodies for undertaking maintenance (for all public and private drainage components).
The final detailed design including proposed standards of operation, construction, structural integrity and ongoing maintenance must be compliant with the 'Non-statutory technical standards for sustainable drainage systems' (March 2015, Ref: PB14308), 'Central Bedfordshire Sustainable Drainage Guidance' (Adopted April 2014, Updated May 2015), and recognised best practise including the Ciria SuDS Manual (2016, C753).
Land drainage Consent under the Land Drainage Act 1991 must be secured to discharge surface water to an existing watercourse/ditch, and details of this provided with the full detailed design. An easement should be provided on the developable side of the watercourse to allow for access for maintenance, this should be 9m but may depend on the maintenance requirements considered appropriate.
Agreement for the sewerage undertaker is required to discharge into a public system. The agreement and rate (l/s) must be included in relevant correspondence. |
| 4
)The applicant is advised that in the event that contamination is found at any time when carrying out the approved development, it shall be reported in writing immediately to the Local Planning Authority. An investigation and risk assessment shall then be undertaken by a competent person, in accordance with 'Model Procedures for the Management of Land Contamination, CLR 11'. A written report of the findings should be forwarded for approval to the Local Planning Authority. Following completion of remedial measures a verification report shall be prepared that demonstrates the effectiveness of the remediation carried out. No part of the development should be occupied until all remedial and validation works are approved in writing.The applicant is advised that in the event that contamination is found at any time when carrying out the approved development, it shall be reported in writing immediately to the Local Planning Authority. An investigation and risk assessment shall then be undertaken by a competent person, in accordance with 'Model Procedures for the Management of Land Contamination, CLR 11'. A written report of the findings should be forwarded for approval to the Local Planning Authority. Following completion of remedial measures a verification report shall be prepared that demonstrates the effectiveness of the remediation carried out. No part of the development should be occupied until all remedial and validation works are approved in writing. |
|
|---|