| Informative Notes: | | 1
)In accordance with Article 35 (1) of the Town and Country Planning (Development Management Procedure) (England) Order 2015, the reason for any condition above relates to the Policies as referred to in the National Planning Policy Framework (NPPF) and the Core Strategy for North Central Bedfordshire.In accordance with Article 35 (1) of the Town and Country Planning (Development Management Procedure) (England) Order 2015, the reason for any condition above relates to the Policies as referred to in the National Planning Policy Framework (NPPF) and the Core Strategy for North Central Bedfordshire. |
| 2
)This permission relates only to that required under the Town & Country Planning Acts and does not include any consent or approval under any other enactment or under the Building Regulations. Any other consent or approval which is necessary must be obtained from the appropriate authority.This permission relates only to that required under the Town & Country Planning Acts and does not include any consent or approval under any other enactment or under the Building Regulations. Any other consent or approval which is necessary must be obtained from the appropriate authority. |
| 3
)Notes to Applicant:
The applicant is advised that parking for contractor's vehicles and the storage of materials associated with this development should take place within the site and not extend into within the public highway without authorisation from the highway authority. If necessary the applicant is advised to contact The Street Works Co-ordinator, Central Bedfordshire Highways, by contacting the Highways Helpdesk 0300 300 8301. Under the provisions of the Highways Act 1980 the developer may be liable for any damage caused to the public highway as a result of demolition/construction of the development hereby approved
The contractor and / or client are to ensure that any mud or building material debris such as sand, cement or concrete that is left on the public highway, or any mud arising from construction/demolition vehicular movement, shall be removed immediately and in the case of concrete, cement, mud or mortar not allowed to dry on the highwayNotes to Applicant:
The applicant is advised that parking for contractor's vehicles and the storage of materials associated with this development should take place within the site and not extend into within the public highway without authorisation from the highway authority. If necessary the applicant is advised to contact The Street Works Co-ordinator, Central Bedfordshire Highways, by contacting the Highways Helpdesk 0300 300 8301. Under the provisions of the Highways Act 1980 the developer may be liable for any damage caused to the public highway as a result of demolition/construction of the development hereby approved
The contractor and / or client are to ensure that any mud or building material debris such as sand, cement or concrete that is left on the public highway, or any mud arising from construction/demolition vehicular movement, shall be removed immediately and in the case of concrete, cement, mud or mortar not allowed to dry on the highway |
| 4
)In the event that contamination is found at any time when carrying out the approved development, it shall be reported in writing immediately to the Local Planning Authority. An investigation and risk assessment shall then be undertaken by a competent person, in accordance with 'Model Procedures for the Management of Land Contamination, CLR 11'. A written report of the findings should be forwarded for approval to the Local Planning Authority. Following completion of remedial measures a verification report shall be prepared that demonstrates the effectiveness of the remediation carried out. No part of the development should be occupied until all remedial and validation works are approved in writing.
Reason: To ensure that no future investigation is required under Part 2A of the Environmental Protection Act 1990.In the event that contamination is found at any time when carrying out the approved development, it shall be reported in writing immediately to the Local Planning Authority. An investigation and risk assessment shall then be undertaken by a competent person, in accordance with 'Model Procedures for the Management of Land Contamination, CLR 11'. A written report of the findings should be forwarded for approval to the Local Planning Authority. Following completion of remedial measures a verification report shall be prepared that demonstrates the effectiveness of the remediation carried out. No part of the development should be occupied until all remedial and validation works are approved in writing.
Reason: To ensure that no future investigation is required under Part 2A of the Environmental Protection Act 1990. |
|
|---|