| Informative Notes: | | 1
)This permission relates only to that required under the Town & Country Planning Acts and does not include any consent or approval under any other enactment or under the Building Regulations. Any other consent or approval which is necessary must be obtained from the appropriate authority.This permission relates only to that required under the Town & Country Planning Acts and does not include any consent or approval under any other enactment or under the Building Regulations. Any other consent or approval which is necessary must be obtained from the appropriate authority. |
| 2
)In accordance with Article 35 (1) of the Town and Country Planning (Development Management Procedure) (England) Order 2015, the reason for any condition above relates to the Policies as referred to in the National Planning Policy Framework (NPPF) and the Core Strategy for North Central Bedfordshire.In accordance with Article 35 (1) of the Town and Country Planning (Development Management Procedure) (England) Order 2015, the reason for any condition above relates to the Policies as referred to in the National Planning Policy Framework (NPPF) and the Core Strategy for North Central Bedfordshire. |
| 3
)You are advised to note the comments of the Pollution Team below:
The applicant is advised that while the Council has no reason to believe this site is contaminated, and is not aware of any potentially contaminative past use, it is the developer's responsibility to ensure that final ground conditions are fit for the end use of the site. If during any site investigation, excavation, engineering or construction works evidence of land contamination is identified, the applicant shall notify the Local Planning Authority without delay. Any land contamination identified shall be remediated to the satisfaction of the Local Planning Authority to ensure that the site is made suitable for its end use.You are advised to note the comments of the Pollution Team below:
The applicant is advised that while the Council has no reason to believe this site is contaminated, and is not aware of any potentially contaminative past use, it is the developer's responsibility to ensure that final ground conditions are fit for the end use of the site. If during any site investigation, excavation, engineering or construction works evidence of land contamination is identified, the applicant shall notify the Local Planning Authority without delay. Any land contamination identified shall be remediated to the satisfaction of the Local Planning Authority to ensure that the site is made suitable for its end use. |
| 4
)
NOTES TO APPLICANT
The applicant is advised that in order to comply with Condition 4 of this permission it will be necessary for the developer of the site to enter into an agreement with Central Bedfordshire Council as Highway Authority under Section 278 of the Highways Act 1980 to ensure the satisfactory completion of the access and associated road improvements. You are advised to contact the Highways Agreements Officer, Community Services, Central Bedfordshire Council, Priory House, Monks Walk, Chicksands, Shefford SG17 5TQ. E-mail highwaysagreements@centralbedfordshire.gov.uk
The applicant is advised that no private surface water drainage system designed as part of a new development, will be allowed to enter any existing highway surface water drainage system.
The applicant is advised that the requirements of the New Roads and Street Works Act 1991 will apply to any works undertaken within the limits of the existing public highway. Further details can be obtained by this link on the Council website http://www.centralbedfordshire.gov.uk/transport/request/dropped-kerb.aspx or contact Central Bedfordshire Council Tel: 0300 300 8301
The applicant is advised that parking for contractor's vehicles and the storage of materials and deliveries associated with this development should take place within the site and not extend into within the public highway without authorisation from the highway authority. If necessary the applicant is advised to contact The Street Works Co-ordinator, Central Bedfordshire Highways, by contacting the Highways Helpdesk 0300 300 8301. Under the provisions of the Highways Act 1980 the developer may be liable for any damage caused to the public highway as a result of demolition/construction of the development hereby approved
The contractor and / or client are to ensure that any mud or building material debris such as sand, cement or concrete that is left on the public highway, or any mud arising from construction/demolition vehicular movement, shall be removed immediately and in the case of concrete, cement, mud or mortar not allowed to dry on the highway
The applicant is advised that in order to achieve the vision splays in condition 4 of the permission it may be necessary for vegetation overhanging the public highway to be removed. Prior to the commencement of work the applicant is advised to use this link on the Council website http://www.centralbedfordshire.gov.uk/transport/landing.aspxor contact Central Bedfordshire Council Tel: 0300 300 8301 to request the removal of the overhanging vegetation on the public highway.
The applicant is advised that, under the provisions of the Highways Act 1980, Section 148(c), 150 and 149 it is an offence for loose aggregate to be deposited into the public highway
NOTES TO APPLICANT
The applicant is advised that in order to comply with Condition 4 of this permission it will be necessary for the developer of the site to enter into an agreement with Central Bedfordshire Council as Highway Authority under Section 278 of the Highways Act 1980 to ensure the satisfactory completion of the access and associated road improvements. You are advised to contact the Highways Agreements Officer, Community Services, Central Bedfordshire Council, Priory House, Monks Walk, Chicksands, Shefford SG17 5TQ. E-mail highwaysagreements@centralbedfordshire.gov.uk
The applicant is advised that no private surface water drainage system designed as part of a new development, will be allowed to enter any existing highway surface water drainage system.
The applicant is advised that the requirements of the New Roads and Street Works Act 1991 will apply to any works undertaken within the limits of the existing public highway. Further details can be obtained by this link on the Council website http://www.centralbedfordshire.gov.uk/transport/request/dropped-kerb.aspx or contact Central Bedfordshire Council Tel: 0300 300 8301
The applicant is advised that parking for contractor's vehicles and the storage of materials and deliveries associated with this development should take place within the site and not extend into within the public highway without authorisation from the highway authority. If necessary the applicant is advised to contact The Street Works Co-ordinator, Central Bedfordshire Highways, by contacting the Highways Helpdesk 0300 300 8301. Under the provisions of the Highways Act 1980 the developer may be liable for any damage caused to the public highway as a result of demolition/construction of the development hereby approved
The contractor and / or client are to ensure that any mud or building material debris such as sand, cement or concrete that is left on the public highway, or any mud arising from construction/demolition vehicular movement, shall be removed immediately and in the case of concrete, cement, mud or mortar not allowed to dry on the highway
The applicant is advised that in order to achieve the vision splays in condition 4 of the permission it may be necessary for vegetation overhanging the public highway to be removed. Prior to the commencement of work the applicant is advised to use this link on the Council website http://www.centralbedfordshire.gov.uk/transport/landing.aspxor contact Central Bedfordshire Council Tel: 0300 300 8301 to request the removal of the overhanging vegetation on the public highway.
The applicant is advised that, under the provisions of the Highways Act 1980, Section 148(c), 150 and 149 it is an offence for loose aggregate to be deposited into the public highway |
| 5
)You are advised to note the comments of the Pollution Team as set out below.
The applicant is reminded that any unexpected contamination encountered during the course of the development needs to be reported to the Local Planning Authority and suitably dealt with before the development can proceed further.
The British Standard for Topsoil, BS 3882:2015, specifies requirements for topsoils that are moved or traded and should be adhered to. The British Standard for Subsoil, BS 8601 Specification for subsoil and requirements for use, should also be adhered to.
There is a duty to assess for Asbestos Containing Materials (ACM) during development and measures undertaken during removal and disposal should protect site workers and future users, while meeting the requirements of the HSE.You are advised to note the comments of the Pollution Team as set out below.
The applicant is reminded that any unexpected contamination encountered during the course of the development needs to be reported to the Local Planning Authority and suitably dealt with before the development can proceed further.
The British Standard for Topsoil, BS 3882:2015, specifies requirements for topsoils that are moved or traded and should be adhered to. The British Standard for Subsoil, BS 8601 Specification for subsoil and requirements for use, should also be adhered to.
There is a duty to assess for Asbestos Containing Materials (ACM) during development and measures undertaken during removal and disposal should protect site workers and future users, while meeting the requirements of the HSE. |
|
|---|