1. Return to Search Page >>2. Search Results >>3. Planning Application Detail
Details of Planning Application - CB/20/03759/FULL

Click on the Consultation link below for neighbour and statutory consultee information and to comment on this application. Ensure your opinions are received before the consultation closing date.


Application Details View Documents (opens in new window) Consultation
Application registeredConsultation periodAwaiting decisionDecidedAppealAppeal decided
Application Type:Full Application
Date Received:20 / 10 / 2020
Registration (Validation) Date:21 / 10 / 2020
Consultation Start Date:21 / 10 / 2020
Earliest Decision Date (Consultation Period Expires):03 / 12 / 2020
Target Date for Decision:16 / 12 / 2020
Location:East View, Gaddesden Turn, Great Billington, Leighton Buzzard, LU7 9BW
Parish Name:Billington
Conservation Area:Billington
Listed Building Grade:Not available
Environmental Assessment:Not available
Expected Decision Level:Not available
Description:Re-submission of planning application CB/20/00608/FULL Demolition of existing mobile home and replacement single storey dwelling
Case Officer:Judy Martin
Case Officer Tel:0300 300 4375
Case Officer Email:judy.martin@centralbedfordshire.gov.uk
Status:Decided
Agent:Mrs P Jarvis
5 Rosebery Avenue
Linslade
LU7 2RQ
Press Date:10 / 11 / 2020
Site Notice Date:29 / 10 / 2020
NeighboursResponses Received: 3
and Representatives:In Favour: 0
Representation DetailsAgainst: 1
Comments: 2
Petitions Against: 0
Petitions For: 0
Officer Site Visit Date:29/10/2020
Committee Site Visit Date:No date
Committee Meeting Date:No date
Decision Level:Officer Delegated
Date Decision Made:09 / 12 / 2020
Date Decision Despatched:09 / 12 / 2020
Decision:Full Application - Granted
Conditions or Reasons:View Conditions or Reasons
Informative Notes:
1 )Surface water drainage controls It has been bought to our attention that there is a considerable flow of surface water through this land, control of this flow is required to prevent sheet flow onto land downstream. It is likely to be useful to come to an agreement with the surrounding land owner as to the best point of discharge. Culverting of existing watercourses will not be permitted. Any watercourses within or adjacent to the site should be included in the maintenance and management plan, even if there is no discharge to them. This would be a riparian ownership issue but leaving it as such is no longer acceptable. Road drainage scheme should be submitted. We will require full drainage drawings showing all connections, control features, storage, inverts etc. and how it communicates with the road drainage scheme. The final detailed design including proposed standards of operation, construction, structural integrity and ongoing maintenance must be compliant with the 'Non-statutory technical standards for sustainable drainage systems' (March 2015, Ref: PB14308), 'Central Bedfordshire Sustainable Drainage Guidance' (Adopted April 2014, Updated May 2015), and recognised best practise including the Ciria SuDS Manual (2016, C753). Land drainage Consent under the Land Drainage Act 1991 must be secured to discharge surface water to an existing watercourse/ditch, and details of this provided with the full detailed design. An easement should be provided on the developable side of the watercourse to allow for access for maintenance, this should be 9m but may depend on the maintenance requirements considered appropriate.Surface water drainage controls It has been bought to our attention that there is a considerable flow of surface water through this land, control of this flow is required to prevent sheet flow onto land downstream. It is likely to be useful to come to an agreement with the surrounding land owner as to the best point of discharge. Culverting of existing watercourses will not be permitted. Any watercourses within or adjacent to the site should be included in the maintenance and management plan, even if there is no discharge to them. This would be a riparian ownership issue but leaving it as such is no longer acceptable. Road drainage scheme should be submitted. We will require full drainage drawings showing all connections, control features, storage, inverts etc. and how it communicates with the road drainage scheme. The final detailed design including proposed standards of operation, construction, structural integrity and ongoing maintenance must be compliant with the 'Non-statutory technical standards for sustainable drainage systems' (March 2015, Ref: PB14308), 'Central Bedfordshire Sustainable Drainage Guidance' (Adopted April 2014, Updated May 2015), and recognised best practise including the Ciria SuDS Manual (2016, C753). Land drainage Consent under the Land Drainage Act 1991 must be secured to discharge surface water to an existing watercourse/ditch, and details of this provided with the full detailed design. An easement should be provided on the developable side of the watercourse to allow for access for maintenance, this should be 9m but may depend on the maintenance requirements considered appropriate.
2 )In accordance with Article 35 (1) of the Town and Country Planning (Development Management Procedure) (England) Order 2015, the reason for any condition above relates to the Policies as referred to in the South Bedfordshire Local Plan Review (SBLPR) and the National Planning Policy Framework (NPPF).In accordance with Article 35 (1) of the Town and Country Planning (Development Management Procedure) (England) Order 2015, the reason for any condition above relates to the Policies as referred to in the South Bedfordshire Local Plan Review (SBLPR) and the National Planning Policy Framework (NPPF).
3 )This permission relates only to that required under the Town & Country Planning Acts and does not include any consent or approval under any other enactment or under the Building Regulations. Any other consent or approval which is necessary must be obtained from the appropriate authority.This permission relates only to that required under the Town & Country Planning Acts and does not include any consent or approval under any other enactment or under the Building Regulations. Any other consent or approval which is necessary must be obtained from the appropriate authority.
4 )This development has the potential to impact Great Crested Newts as there are ponds/waterbodies and suitable habitat within 500m of the development. If Great Crested Newts are discovered during development, all works must cease until advice has been sought from Natural England, as failure to do so could result in prosecutable offences being committed.This development has the potential to impact Great Crested Newts as there are ponds/waterbodies and suitable habitat within 500m of the development. If Great Crested Newts are discovered during development, all works must cease until advice has been sought from Natural England, as failure to do so could result in prosecutable offences being committed.
Appeal Received Date:This case has no appeals against it
Planning Obligation Status:Not available

Return to Search PageTop of Page