| Informative Notes: | | 1
)GDP Policy Informative Central Beds Local Plan
In accordance with Article 35 (1) of the Town and Country Planning (Development Management Procedure) (England) Order 2015, the reason for any condition above relates to the Policies as referred to in the Central Bedfordshire Local Plan and the National Planning Policy Framework (NPPF).GDP Policy Informative Central Beds Local Plan
In accordance with Article 35 (1) of the Town and Country Planning (Development Management Procedure) (England) Order 2015, the reason for any condition above relates to the Policies as referred to in the Central Bedfordshire Local Plan and the National Planning Policy Framework (NPPF). |
| 2
)This permission relates only to that required under the Town & Country Planning Acts and does not include any consent or approval under any other enactment or under the Building Regulations. Any other consent or approval which is necessary must be obtained from the appropriate authority.This permission relates only to that required under the Town & Country Planning Acts and does not include any consent or approval under any other enactment or under the Building Regulations. Any other consent or approval which is necessary must be obtained from the appropriate authority. |
| 3
)The applicant is advised that the requirements of the New Roads and Street Works Act 1991 will apply to any works undertaken within the limits of the existing public highway. Further details can be obtained by contacting the Streetworks Manager, Central Bedfordshire Council, by contacting the Highways Helpdesk 0300 300 8301.The applicant is advised that the requirements of the New Roads and Street Works Act 1991 will apply to any works undertaken within the limits of the existing public highway. Further details can be obtained by contacting the Streetworks Manager, Central Bedfordshire Council, by contacting the Highways Helpdesk 0300 300 8301. |
| 4
)The applicant is advised that the storage of materials associated with the construction of this development should take place within the site and not extend into or within the public highway without authorisation from the highway authority. If necessary the applicant should contact the Streetworks Manager, Central Bedfordshire Council, by contacting the Highways Helpdesk 0300 300 8301.The applicant is advised that the storage of materials associated with the construction of this development should take place within the site and not extend into or within the public highway without authorisation from the highway authority. If necessary the applicant should contact the Streetworks Manager, Central Bedfordshire Council, by contacting the Highways Helpdesk 0300 300 8301. |
| 5
)The applicant is advised that all cycle parking to be provided within the site shall be designed in accordance with the Central Bedfordshire Council's 'Cycle Parking Annexes July 2010'.The applicant is advised that all cycle parking to be provided within the site shall be designed in accordance with the Central Bedfordshire Council's 'Cycle Parking Annexes July 2010'. |
| 6
)Where roofing work/timber treatment/demolition is to be undertaken it is the legal responsibility of the contractor to check for bats. If bats are found during the course of any work to buildings or trees where not previously anticipated, then works should immediately stop and Natural England notified for appropriate advice.Where roofing work/timber treatment/demolition is to be undertaken it is the legal responsibility of the contractor to check for bats. If bats are found during the course of any work to buildings or trees where not previously anticipated, then works should immediately stop and Natural England notified for appropriate advice. |
| 7
)Any discharge of surface water to the watercourses adjacent to this site will require separate prior consent from the Buckingham and River Ouzel Internal Drainage Board.Any discharge of surface water to the watercourses adjacent to this site will require separate prior consent from the Buckingham and River Ouzel Internal Drainage Board. |
| 8
)The watercourse on the boundary of, or passing through this site, is under the statutory control of the Buckingham and River Ouzel Internal Drainage Board. In accordance with the Board's byelaws, no development should take place within 9 metres of bank top, without the Board's prior consent, this includes any planting, fencing or other landscaping.The watercourse on the boundary of, or passing through this site, is under the statutory control of the Buckingham and River Ouzel Internal Drainage Board. In accordance with the Board's byelaws, no development should take place within 9 metres of bank top, without the Board's prior consent, this includes any planting, fencing or other landscaping. |
|
|---|