1. Return to Search Page >>2. Search Results >>3. Planning Application Detail
Details of Planning Application - CB/21/04761/FULL

Click on the Consultation link below for neighbour and statutory consultee information and to comment on this application. Ensure your opinions are received before the consultation closing date.


Application Details View Documents (opens in new window) Consultation
Application registeredConsultation periodAwaiting decisionDecidedAppealAppeal decided
Application Type:Full Application
Date Received:22 / 10 / 2021
Registration (Validation) Date:22 / 11 / 2021
Consultation Start Date:22 / 11 / 2021
Earliest Decision Date (Consultation Period Expires):18 / 08 / 2022
Target Date for Decision:17 / 01 / 2022
Location:Hillside, Myers Road, Potton, Sandy, SG19 2RG
Parish Name:Potton
Conservation Area:Not available
Listed Building Grade:Not available
Environmental Assessment:Not available
Expected Decision Level:Not available
Description:Demolition of existing buildings and erection of 3 detached houses
Case Officer:David Gauntlett
Case Officer Tel:0300 300 4266
Case Officer Email:david.gauntlett@centralbedfordshire.gov.uk
Status:Decided
Agent:Not available
Press Date:No date
Site Notice Date:10 / 12 / 2021
NeighboursResponses Received: 0
and Representatives:In Favour: 0
Representation DetailsAgainst: 0
Comments: 0
Petitions Against: 0
Petitions For: 0
Officer Site Visit Date:10/12/2021
Committee Site Visit Date:No date
Committee Meeting Date:No date
Decision Level:Officer Delegated
Date Decision Made:18 / 08 / 2022
Date Decision Despatched:18 / 08 / 2022
Decision:Full Application - Granted
Conditions or Reasons:View Conditions or Reasons
Informative Notes:
1 )Highways Notes: The applicant is advised that in order to comply with Condition 6 of this permission it will be necessary for the developer of the site to enter into an agreement with Central Bedfordshire Council as Highway Authority under Section 278 of the Highways Act 1980 to ensure the satisfactory completion of the access and associated road improvements. You are advised to contact the Highways Agreements Officer, Community Services, Central Bedfordshire Council, Priory House, Monks Walk, Chicksands, Shefford SG17 5TQ. E-mail highwaysagreements@centralbedfordshire.gov.uk The applicant is also advised that if any of the works associated with the construction of the vehicular access affects or requires the removal and/or the relocation of any equipment, apparatus or structures (e.g. street name plates, bus stop signs or shelters, statutory authority equipment etc.) then the applicant will berequired to bear the cost of such removal or alteration The applicant is advised that the requirements of the New Roads and Street Works Act 1991 will apply to any works undertaken within the limits of the existing public highway. Further details can be obtained from the Highways Help Desk tel: 0300 300 8049 The applicant is advised that all cycle parking to be provided within the site shall be designed in accordance with the Central Bedfordshire Council's 'Cycle Parking Annexes July 2010'Highways Notes: The applicant is advised that in order to comply with Condition 6 of this permission it will be necessary for the developer of the site to enter into an agreement with Central Bedfordshire Council as Highway Authority under Section 278 of the Highways Act 1980 to ensure the satisfactory completion of the access and associated road improvements. You are advised to contact the Highways Agreements Officer, Community Services, Central Bedfordshire Council, Priory House, Monks Walk, Chicksands, Shefford SG17 5TQ. E-mail highwaysagreements@centralbedfordshire.gov.uk The applicant is also advised that if any of the works associated with the construction of the vehicular access affects or requires the removal and/or the relocation of any equipment, apparatus or structures (e.g. street name plates, bus stop signs or shelters, statutory authority equipment etc.) then the applicant will berequired to bear the cost of such removal or alteration The applicant is advised that the requirements of the New Roads and Street Works Act 1991 will apply to any works undertaken within the limits of the existing public highway. Further details can be obtained from the Highways Help Desk tel: 0300 300 8049 The applicant is advised that all cycle parking to be provided within the site shall be designed in accordance with the Central Bedfordshire Council's 'Cycle Parking Annexes July 2010'
2 )Drainage Notes: 1. Culverting of existing watercourses will not be permitted. 2. We will require calculations, informed by BRE365 soakage testing, providing evidence of all surface water retained on site for the 1 in 100 (+40%CC). This is then used to size soakaways. 3. Any watercourses within or adjacent to the site should be included in the maintenance and management plan, even if there is no discharge to them. This would be a riparian ownership issue but leaving it as such is no longer acceptable. 4. We will require full drainage drawings showing all connections, control features, storage, inverts etc. and how it communicates with the development wide scheme. 5. Under Central Bedfordshire Council and IDB bylaws, any watercourse within or adjoining the site boundary will maintain a 9m development free easement (on the development side), unless otherwise agreed with the relevant drainage authority. This applies to all watercourses, where water is present for all or some of the year, including those not clearly stated on mapping, topography or planning documents. 6. We expect the use of the SuDS management train, single point SuDS will be challenged. Where the use of permeable surfacing is proposed, this should be designed in accordance with the 'CIRIA RP992 The SuDS Manual Update: Paper RP992/28: Design Assessment Checklists for Permeable/Porous Pavement. 7. Connection to the highway gully system is not acceptable. 8. The Council does not, and is not required to, adopt any SuDS feature. It is the responsibility of the applicant to ensure that the surface water drainage system, in its entirety, will be effectively maintained in the long-term. We therefore expect confirmation of the proposed arrangements for maintenance to be provided with the final detailed design, including the future maintenance and operational needs and the responsible bodies for undertaking maintenance (for all public and private drainage components). 9. The final detailed design including proposed standards of operation, construction, structural integrity and ongoing maintenance must be compliant with the 'Non-statutory technical standards for sustainable drainage systems' (March 2015, Ref: PB14308), 'Central Bedfordshire Sustainable Drainage Guidance' (Adopted April 2014, Updated May 2015), and recognised best practise including the Ciria SuDS Manual (2016, C753). 10. Land drainage Consent under the Land Drainage Act 1991 must be secured to discharge surface water to an existing watercourse/ditch, and details of this provided with the full detailed design. An easement should be provided on the developable side of the watercourse to allow for access for maintenance, this should be 9m but may depend on the maintenance requirements considered appropriate.Drainage Notes: 1. Culverting of existing watercourses will not be permitted. 2. We will require calculations, informed by BRE365 soakage testing, providing evidence of all surface water retained on site for the 1 in 100 (+40%CC). This is then used to size soakaways. 3. Any watercourses within or adjacent to the site should be included in the maintenance and management plan, even if there is no discharge to them. This would be a riparian ownership issue but leaving it as such is no longer acceptable. 4. We will require full drainage drawings showing all connections, control features, storage, inverts etc. and how it communicates with the development wide scheme. 5. Under Central Bedfordshire Council and IDB bylaws, any watercourse within or adjoining the site boundary will maintain a 9m development free easement (on the development side), unless otherwise agreed with the relevant drainage authority. This applies to all watercourses, where water is present for all or some of the year, including those not clearly stated on mapping, topography or planning documents. 6. We expect the use of the SuDS management train, single point SuDS will be challenged. Where the use of permeable surfacing is proposed, this should be designed in accordance with the 'CIRIA RP992 The SuDS Manual Update: Paper RP992/28: Design Assessment Checklists for Permeable/Porous Pavement. 7. Connection to the highway gully system is not acceptable. 8. The Council does not, and is not required to, adopt any SuDS feature. It is the responsibility of the applicant to ensure that the surface water drainage system, in its entirety, will be effectively maintained in the long-term. We therefore expect confirmation of the proposed arrangements for maintenance to be provided with the final detailed design, including the future maintenance and operational needs and the responsible bodies for undertaking maintenance (for all public and private drainage components). 9. The final detailed design including proposed standards of operation, construction, structural integrity and ongoing maintenance must be compliant with the 'Non-statutory technical standards for sustainable drainage systems' (March 2015, Ref: PB14308), 'Central Bedfordshire Sustainable Drainage Guidance' (Adopted April 2014, Updated May 2015), and recognised best practise including the Ciria SuDS Manual (2016, C753). 10. Land drainage Consent under the Land Drainage Act 1991 must be secured to discharge surface water to an existing watercourse/ditch, and details of this provided with the full detailed design. An easement should be provided on the developable side of the watercourse to allow for access for maintenance, this should be 9m but may depend on the maintenance requirements considered appropriate.
Appeal Received Date:This case has no appeals against it
Planning Obligation Status:Not available

Return to Search PageTop of Page