| Informative Notes: | | 1
)GDP Policy Informative Central Beds Local Plan
In accordance with Article 35 (1) of the Town and Country Planning (Development Management Procedure) (England) Order 2015, the reason for any condition above relates to the Policies as referred to in the Central Bedfordshire Local Plan and the National Planning Policy Framework (NPPF).GDP Policy Informative Central Beds Local Plan
In accordance with Article 35 (1) of the Town and Country Planning (Development Management Procedure) (England) Order 2015, the reason for any condition above relates to the Policies as referred to in the Central Bedfordshire Local Plan and the National Planning Policy Framework (NPPF). |
| 2
)This permission relates only to that required under the Town & Country Planning Acts and does not include any consent or approval under any other enactment or under the Building Regulations. Any other consent or approval which is necessary must be obtained from the appropriate authority.This permission relates only to that required under the Town & Country Planning Acts and does not include any consent or approval under any other enactment or under the Building Regulations. Any other consent or approval which is necessary must be obtained from the appropriate authority. |
| 3
)You are advised to note the comments of the Bedfordshire Fire and Rescue Service as set out below:
The nearest existing fire hydrant is approximately 285 metres from the furthest proposed unit (measured along the private road - when measured along the proposed access road this increases to 455 metres). The developer must provide fire hydrants in line with the relevant guidance. The 180mm water main that runs past the site would be sufficient to supply the fire main for the provision of fire hydrants.You are advised to note the comments of the Bedfordshire Fire and Rescue Service as set out below:
The nearest existing fire hydrant is approximately 285 metres from the furthest proposed unit (measured along the private road - when measured along the proposed access road this increases to 455 metres). The developer must provide fire hydrants in line with the relevant guidance. The 180mm water main that runs past the site would be sufficient to supply the fire main for the provision of fire hydrants. |
| 4
)The applicant is advised that in order to comply with Condition 4 and 7 of this permission it will be necessary for the developer of the site to enter into an agreement with Central Bedfordshire Council as Highway Authority under Section 278 of the Highways Act 1980 to ensure the satisfactory completion of the access and associated road improvements. You are advised to contact the Highways Agreements Officer,Community Services, Central Bedfordshire Council, Priory House, Monks Walk,Chicksands, Shefford SG17 5TQ. E-mail: highwaysagreements@centralbedfordshire.gov.ukThe applicant is also advised that if any of the works associated with the construction of the vehicular access affects or requires the removal and/or the relocation of any equipment,apparatus or structures (e.g. street name plates, bus stop signs or shelters, statutory authority equipment etc.) then the applicant will be required to bear the cost of such removal or alteration.
The applicant is advised that the requirements of the New Roads and Street Works Act 1991 will apply to any works undertaken within the limits of the existing public highway. Further details can be obtained from the Highways Help Desk tel: 0300 30080493
The applicant is advised that the closure of existing access shall include the reinstatement of the highway to include any footway, verge and kerbing and no works associated with the closure of the vehicular access should be carried out within the confines of the public highway without prior consent, in writing, of the Central Bedfordshire Council Highways Department. Upon formal approval of details, the applicant is advised to contact Central Bedfordshire Council's Highway Help Desk, Tel 0300 300 8049 quoting the Planning Application number. This will enable the necessary consent and procedures under Section 184 of the Highways Act to be implemented. The applicant will also be expected to bear all costs involved in closing the access(es)The applicant is advised that in order to comply with Condition 4 and 7 of this permission it will be necessary for the developer of the site to enter into an agreement with Central Bedfordshire Council as Highway Authority under Section 278 of the Highways Act 1980 to ensure the satisfactory completion of the access and associated road improvements. You are advised to contact the Highways Agreements Officer,Community Services, Central Bedfordshire Council, Priory House, Monks Walk,Chicksands, Shefford SG17 5TQ. E-mail: highwaysagreements@centralbedfordshire.gov.ukThe applicant is also advised that if any of the works associated with the construction of the vehicular access affects or requires the removal and/or the relocation of any equipment,apparatus or structures (e.g. street name plates, bus stop signs or shelters, statutory authority equipment etc.) then the applicant will be required to bear the cost of such removal or alteration.
The applicant is advised that the requirements of the New Roads and Street Works Act 1991 will apply to any works undertaken within the limits of the existing public highway. Further details can be obtained from the Highways Help Desk tel: 0300 30080493
The applicant is advised that the closure of existing access shall include the reinstatement of the highway to include any footway, verge and kerbing and no works associated with the closure of the vehicular access should be carried out within the confines of the public highway without prior consent, in writing, of the Central Bedfordshire Council Highways Department. Upon formal approval of details, the applicant is advised to contact Central Bedfordshire Council's Highway Help Desk, Tel 0300 300 8049 quoting the Planning Application number. This will enable the necessary consent and procedures under Section 184 of the Highways Act to be implemented. The applicant will also be expected to bear all costs involved in closing the access(es) |
|
|---|