| Details of Planning Application -
CB/22/01420/FULL |
| Application registered | Consultation period | Awaiting decision | Decided | Appeal | Appeal decided |
|
|---|
| Application Type: | Full Application |
|---|
| Date Received: | 05
/
04
/
2022 |
|---|
| Registration (Validation) Date: | 06
/
04
/
2022 |
|---|
| Consultation Start Date: | 06
/
04
/
2022 |
|---|
| Earliest Decision Date (Consultation Period Expires): | 18
/
05
/
2022 |
|---|
| Target Date for Decision: | 01
/
06
/
2022 |
|---|
| Location: | 1A Havelock Road, Biggleswade, SG18 0DB |
|---|
| Parish Name: | Biggleswade |
|---|
| Conservation Area: | Not available |
|---|
| Listed Building Grade: | Not available |
|---|
| Environmental Assessment: | Not available |
|---|
| Expected Decision Level: | Not available |
|---|
| Description: | Conversion from A1 to C3 to create 1x one bedroom flat, with extension to the front and reduction to roof height. |
|---|
| Case Officer: | David Gauntlett |
|---|
| Case Officer Tel: | 0300 300 4266 |
|---|
| Case Officer Email: | david.gauntlett@centralbedfordshire.gov.uk |
|---|
| Status: | Decided |
|---|
| Agent: | DLA Town Planning Ltd |
|---|
| 5 The Gavel Centre |
|---|
| Porters Wood |
|---|
| St Albans |
|---|
| Herts |
|---|
| AL3 6PQ |
|---|
| Press Date: | No date |
|---|
| Site Notice Date: | No date |
|---|
| Neighbours | Responses Received:
3 |
|---|
| and Representatives: | In Favour:
2 |
|---|
| Representation Details | Against:
1 |
|---|
| Comments:
0 |
|---|
| Petitions Against:
0 |
|---|
| Petitions For:
0 |
|---|
| Officer Site Visit Date: | 26/04/2022 |
|---|
| Committee Site Visit Date: | No date |
|---|
| Committee Meeting Date: | No date |
|---|
| Decision Level: | Officer Delegated |
|---|
| Date Decision Made: | 24
/
05
/
2022 |
|---|
| Date Decision Despatched: | 24
/
05
/
2022 |
|---|
| Decision: | Full Application - Granted |
|---|
| Conditions or Reasons: | View Conditions or Reasons |
|---|
| Informative Notes: | | 1
)The applicant should be aware of the following advice from the Local Highway Authority:
The applicant is advised that no private surface water drainage system designed as part of a new development, will be allowed to enter any existing highway surface water drainage system.
The applicant is advised that parking for contractor's vehicles and the storage of materials associated with this development should take place within the site and not extend into within the public highway without authorisation from the highway authority. If necessary the applicant is advised to contact The Street Works Co-ordinator, Central Bedfordshire Highways, by contacting the Highways Helpdesk 0300 3008301. Under the provisions of the Highways Act 1980 the developer may be liable for any damage caused to the public highway as a result of demolition / construction of the development hereby approved
The contractor and / or client are to ensure that any mud or building material debris such as sand, cement or concrete that is left on the public highway, or any mud arising from construction / demolition vehicular movement, shall be removed immediately and in the case of concrete, cement, mud or mortar not allowed to dry on the highway.The applicant should be aware of the following advice from the Local Highway Authority:
The applicant is advised that no private surface water drainage system designed as part of a new development, will be allowed to enter any existing highway surface water drainage system.
The applicant is advised that parking for contractor's vehicles and the storage of materials associated with this development should take place within the site and not extend into within the public highway without authorisation from the highway authority. If necessary the applicant is advised to contact The Street Works Co-ordinator, Central Bedfordshire Highways, by contacting the Highways Helpdesk 0300 3008301. Under the provisions of the Highways Act 1980 the developer may be liable for any damage caused to the public highway as a result of demolition / construction of the development hereby approved
The contractor and / or client are to ensure that any mud or building material debris such as sand, cement or concrete that is left on the public highway, or any mud arising from construction / demolition vehicular movement, shall be removed immediately and in the case of concrete, cement, mud or mortar not allowed to dry on the highway. |
| 2
)The applicant is advised where roofing work or timber treatment is to be undertaken it is the legal responsibility of the contractor to check for bats. If bats are found during the course of any work to buildings or trees where not previously anticipated, then works should immediately stop and Natural England notified for appropriate advice.The applicant is advised where roofing work or timber treatment is to be undertaken it is the legal responsibility of the contractor to check for bats. If bats are found during the course of any work to buildings or trees where not previously anticipated, then works should immediately stop and Natural England notified for appropriate advice. |
| 3
)As this is an already established road, the proposed dwelling would be required to present their bins on the boundary of the property / public highway on the day of collection in accordance with the rest of the road. A hard-standing area needs to be provided for 3 wheelie bins and a food caddy. Bins must not encroach on or cause a hazard or obstruction to the public highway.As this is an already established road, the proposed dwelling would be required to present their bins on the boundary of the property / public highway on the day of collection in accordance with the rest of the road. A hard-standing area needs to be provided for 3 wheelie bins and a food caddy. Bins must not encroach on or cause a hazard or obstruction to the public highway. |
|
|---|
| Appeal Received Date: | This case has no appeals against it |
|---|
| Planning Obligation Status: | Not available |
|---|