Informative Notes: | 1
)GDP Policy Informative Central Beds Local Plan
In accordance with Article 35 (1) of the Town and Country Planning (Development Management Procedure) (England) Order 2015, the reason for any condition above relates to the Policies as referred to in the Central Bedfordshire Local Plan and the National Planning Policy Framework (NPPF).GDP Policy Informative Central Beds Local Plan
In accordance with Article 35 (1) of the Town and Country Planning (Development Management Procedure) (England) Order 2015, the reason for any condition above relates to the Policies as referred to in the Central Bedfordshire Local Plan and the National Planning Policy Framework (NPPF). |
2
)This permission relates only to that required under the Town & Country Planning Acts and does not include any consent or approval under any other enactment or under the Building Regulations. Any other consent or approval which is necessary must be obtained from the appropriate authority.This permission relates only to that required under the Town & Country Planning Acts and does not include any consent or approval under any other enactment or under the Building Regulations. Any other consent or approval which is necessary must be obtained from the appropriate authority. |
3
)The applicant is advised that no private surface water drainage system designed as part of a new development will be allowed to enter any existing highway surface water drainage system.The applicant is advised that no private surface water drainage system designed as part of a new development will be allowed to enter any existing highway surface water drainage system. |
4
)The applicant is advised that the requirements of the New Roads and Street Works Act 1991 will apply to any works undertaken within the limits of the existing public highway. Further details can be obtained by this link on the Council website http://www.centralbedfordshire.gov.uk/transport/request/dropped-kerb.aspx or contact Central Bedfordshire Council Tel: 0300 300 8301The applicant is advised that the requirements of the New Roads and Street Works Act 1991 will apply to any works undertaken within the limits of the existing public highway. Further details can be obtained by this link on the Council website http://www.centralbedfordshire.gov.uk/transport/request/dropped-kerb.aspx or contact Central Bedfordshire Council Tel: 0300 300 8301 |
5
)The applicant is advised that parking for contractor's vehicles and the storage of materials associated with this development should take place within the site and not extend into within the public highway without authorisation from the highway authority. If necessary the applicant is advised to follow this link on the Council website http://www.centralbedfordshire.gov.uk/transport/request/dropped-kerb.aspx or contact Central Bedfordshire Council Tel: 0300 300 8301. Under the provisions of the Highways Act 1980 the developer may be liable for any damage caused to the public highway as a result of demolition/construction of the development hereby approvedThe applicant is advised that parking for contractor's vehicles and the storage of materials associated with this development should take place within the site and not extend into within the public highway without authorisation from the highway authority. If necessary the applicant is advised to follow this link on the Council website http://www.centralbedfordshire.gov.uk/transport/request/dropped-kerb.aspx or contact Central Bedfordshire Council Tel: 0300 300 8301. Under the provisions of the Highways Act 1980 the developer may be liable for any damage caused to the public highway as a result of demolition/construction of the development hereby approved |
6
)The contractor and / or client are to ensure that any mud or building material debris such as sand, cement or concrete that is left on the public highway, or any mud arising from construction/demolition vehicular movement, shall be removed immediately and in the case of concrete, cement, mud or mortar not allowed to dry on the highwayThe contractor and / or client are to ensure that any mud or building material debris such as sand, cement or concrete that is left on the public highway, or any mud arising from construction/demolition vehicular movement, shall be removed immediately and in the case of concrete, cement, mud or mortar not allowed to dry on the highway |
7
)The British Standard for Topsoil, BS 3882:2007, specifies requirements for topsoils that are moved or traded and should be adhered to. The British Standard for Subsoil, BS 8601 Specification for subsoil and requirements for use, should also be adhered to.
There is a duty to assess for Asbestos Containing Materials (ACM) during development and measures undertaken during removal and disposal should protect site workers and future users, while meeting the requirements of the HSE.
Applicants are reminded that, should groundwater or surface water courses be at risk of contamination before, during or after development, the Environment Agency should be approached for approval of measures to protect water resources separately, unless an Agency condition already forms part of this permission.The British Standard for Topsoil, BS 3882:2007, specifies requirements for topsoils that are moved or traded and should be adhered to. The British Standard for Subsoil, BS 8601 Specification for subsoil and requirements for use, should also be adhered to.
There is a duty to assess for Asbestos Containing Materials (ACM) during development and measures undertaken during removal and disposal should protect site workers and future users, while meeting the requirements of the HSE.
Applicants are reminded that, should groundwater or surface water courses be at risk of contamination before, during or after development, the Environment Agency should be approached for approval of measures to protect water resources separately, unless an Agency condition already forms part of this permission. |
8
)The developer should address risks to controlled waters from contamination at the site, following the requirements of the National Planning Policy Framework and the EnvironmentAgency Guiding Principles for Land Contamination, which can be found here:
https://www.gov.uk/government/publications/managing-and-reducing-land-contaminationThe developer should address risks to controlled waters from contamination at the site, following the requirements of the National Planning Policy Framework and the EnvironmentAgency Guiding Principles for Land Contamination, which can be found here:
https://www.gov.uk/government/publications/managing-and-reducing-land-contamination |
9
)The water environment is potentially vulnerable and there is an increased potential for pollution from inappropriately located and/or designed infiltration (SuDS). The Environment Agency considers any infiltration (SuDS) greater than 2.0 m below ground level to be a deep system and are generally not acceptable. If the use of deep bore soakaways is proposed, we would wish to be re-consulted. All infiltration SuDS require a minimum of 1.2 m clearance between the base of infiltration SuDS and peak seasonal groundwater levels. All need to meet the criteria in our Groundwater Protection: Principles and Practice (GP3) position statements G1 to G13 which can be found here:
https://www.gov.uk/government/collections/groundwater-protection. In addition, they must not be constructed in ground affected by contamination.The water environment is potentially vulnerable and there is an increased potential for pollution from inappropriately located and/or designed infiltration (SuDS). The Environment Agency considers any infiltration (SuDS) greater than 2.0 m below ground level to be a deep system and are generally not acceptable. If the use of deep bore soakaways is proposed, we would wish to be re-consulted. All infiltration SuDS require a minimum of 1.2 m clearance between the base of infiltration SuDS and peak seasonal groundwater levels. All need to meet the criteria in our Groundwater Protection: Principles and Practice (GP3) position statements G1 to G13 which can be found here:
https://www.gov.uk/government/collections/groundwater-protection. In addition, they must not be constructed in ground affected by contamination. |
10
)The applicant is advised that no works should be carried out within the confines of the public highway without prior consent, in writing, of the Central Bedfordshire Council. Upon receipt of this Notice of Planning Approval, the applicant is advised to contact this link on the Council website http://www.centralbedfordshire.gov.uk/transport/request/dropped-kerb.aspx or contact Central Bedfordshire Council Tel: 0300 300 8301 quoting the Planning Application number. This will enable the necessary consent and procedures under the Highways Act to be implemented.The applicant is advised that no works should be carried out within the confines of the public highway without prior consent, in writing, of the Central Bedfordshire Council. Upon receipt of this Notice of Planning Approval, the applicant is advised to contact this link on the Council website http://www.centralbedfordshire.gov.uk/transport/request/dropped-kerb.aspx or contact Central Bedfordshire Council Tel: 0300 300 8301 quoting the Planning Application number. This will enable the necessary consent and procedures under the Highways Act to be implemented. |
|
---|