| Informative Notes: | | 1
)This permission relates only to that required under the Town & Country Planning Acts and does not include any consent or approval under any other enactment or under the Building Regulations. Any other consent or approval which is necessary must be obtained from the appropriate authority.This permission relates only to that required under the Town & Country Planning Acts and does not include any consent or approval under any other enactment or under the Building Regulations. Any other consent or approval which is necessary must be obtained from the appropriate authority. |
| 2
)GDP Policy Informative Central Beds Local Plan
In accordance with Article 35 (1) of the Town and Country Planning (Development Management Procedure) (England) Order 2015, the reason for any condition above relates to the Policies as referred to in the Central Bedfordshire Local Plan and the National Planning Policy Framework (NPPF).GDP Policy Informative Central Beds Local Plan
In accordance with Article 35 (1) of the Town and Country Planning (Development Management Procedure) (England) Order 2015, the reason for any condition above relates to the Policies as referred to in the Central Bedfordshire Local Plan and the National Planning Policy Framework (NPPF). |
| 3
)It is recommended that the NatureSpace Best Practice Principles are taken into account and implemented where possible and appropriate.
It is essential to note that any works or activities whatsoever undertaken on site (including ground investigations, site preparatory works or ground clearance) prior to receipt of the written authorisation from the planning authority (which permits the development to proceed under the District Licence WML-OR112) are not licensed under the GCN District Licence. Any such works or activities have no legal protection under the GCN District Licence and if offences against GCN are thereby committed then criminal investigation and prosecution by the police may follow.It is recommended that the NatureSpace Best Practice Principles are taken into account and implemented where possible and appropriate.
It is essential to note that any works or activities whatsoever undertaken on site (including ground investigations, site preparatory works or ground clearance) prior to receipt of the written authorisation from the planning authority (which permits the development to proceed under the District Licence WML-OR112) are not licensed under the GCN District Licence. Any such works or activities have no legal protection under the GCN District Licence and if offences against GCN are thereby committed then criminal investigation and prosecution by the police may follow. |
| 4
)The applicant is advised that, under the provisions of the Highways Act 1980, no part of the structure, including boundary treatments and their foundations, and surface water hardware shall be erected or installed in, under or overhanging the public highway and no window, door or gate shall be fixed so as to open outwards into the highway. The Highway Authority has the power under Section 143 of the Highways Act 1980, to remove any structure erected on a highway
The applicant is advised that in order to comply with Conditions of this permission it will be necessary for the developer of the site to enter into an agreement with Central Bedfordshire Council as Highway Authority under Section 278 of the Highways Act 1980 to ensure the satisfactory completion of the access and associated road improvements. You are advised to contact the Highways Agreements Officer, Community Services, Central Bedfordshire Council, Priory House, Monks Walk, Chicksands, Shefford SG17 5TQ. E-mail highwaysagreements@centralbedfordshire.gov.uk
The applicant is advised that no private surface water drainage system designed as part of a new development, will be allowed to enter any existing highway surface water drainage system.
The applicant is advised that the requirements of the New Roads and Street Works Act 1991 will apply to any works undertaken within the limits of the existing public highway. Further details can be obtained by contacting The Street Works Co-ordinator, Central Bedfordshire Highways, by contacting the Highways Helpdesk 0300 300 8301.
The applicant is advised that parking for contractor's vehicles and the storage of materials and deliveries associated with this development should take place within the site and not extend into within the public highway without authorisation from the highway authority. If necessary the applicant is advised to contact The Street Works Co-ordinator, Central Bedfordshire Highways, by contacting the Highways Helpdesk 0300 300 8301. Under the provisions of the Highways Act 1980 the developer may be liable for any damage caused to the public highway as a result of demolition/construction of the development hereby approved
The contractor and / or client are to ensure that any mud or building material debris such as sand, cement or concrete that is left on the public highway, or any mud arising from construction/demolition vehicular movement, shall be removed immediately and in the case of concrete, cement, mud or mortar not allowed to dry on the highway
The applicant is advised that all cycle parking to be provided within the site shall be designed in accordance with the Central Bedfordshire Council's 'Cycle Parking Annexes July 2010'.The applicant is advised that, under the provisions of the Highways Act 1980, no part of the structure, including boundary treatments and their foundations, and surface water hardware shall be erected or installed in, under or overhanging the public highway and no window, door or gate shall be fixed so as to open outwards into the highway. The Highway Authority has the power under Section 143 of the Highways Act 1980, to remove any structure erected on a highway
The applicant is advised that in order to comply with Conditions of this permission it will be necessary for the developer of the site to enter into an agreement with Central Bedfordshire Council as Highway Authority under Section 278 of the Highways Act 1980 to ensure the satisfactory completion of the access and associated road improvements. You are advised to contact the Highways Agreements Officer, Community Services, Central Bedfordshire Council, Priory House, Monks Walk, Chicksands, Shefford SG17 5TQ. E-mail highwaysagreements@centralbedfordshire.gov.uk
The applicant is advised that no private surface water drainage system designed as part of a new development, will be allowed to enter any existing highway surface water drainage system.
The applicant is advised that the requirements of the New Roads and Street Works Act 1991 will apply to any works undertaken within the limits of the existing public highway. Further details can be obtained by contacting The Street Works Co-ordinator, Central Bedfordshire Highways, by contacting the Highways Helpdesk 0300 300 8301.
The applicant is advised that parking for contractor's vehicles and the storage of materials and deliveries associated with this development should take place within the site and not extend into within the public highway without authorisation from the highway authority. If necessary the applicant is advised to contact The Street Works Co-ordinator, Central Bedfordshire Highways, by contacting the Highways Helpdesk 0300 300 8301. Under the provisions of the Highways Act 1980 the developer may be liable for any damage caused to the public highway as a result of demolition/construction of the development hereby approved
The contractor and / or client are to ensure that any mud or building material debris such as sand, cement or concrete that is left on the public highway, or any mud arising from construction/demolition vehicular movement, shall be removed immediately and in the case of concrete, cement, mud or mortar not allowed to dry on the highway
The applicant is advised that all cycle parking to be provided within the site shall be designed in accordance with the Central Bedfordshire Council's 'Cycle Parking Annexes July 2010'. |
|
|---|