1. Return to Search Page >>2. Search Results >>3. Planning Application Detail
Details of Planning Application - CB/22/03095/FULL

Click on the Consultation link below for neighbour and statutory consultee information and to comment on this application. Ensure your opinions are received before the consultation closing date.


Application Details View Documents (opens in new window) Consultation
Application registeredConsultation periodAwaiting decisionDecidedAppealAppeal decided
Application Type:Full Application
Date Received:29 / 07 / 2022
Registration (Validation) Date:13 / 09 / 2022
Consultation Start Date:13 / 09 / 2022
Earliest Decision Date (Consultation Period Expires):02 / 01 / 2023
Target Date for Decision:08 / 11 / 2022
Location:Land at Russell Farm, New Road, Maulden, Bedford, MK45 2BG
Parish Name:Maulden
Conservation Area:Not available
Listed Building Grade:Not available
Environmental Assessment:Not available
Expected Decision Level:Not available
Description:Construction of a secure storage unit and change of use of land to provide external open storage.
Case Officer:Janine Richardson
Case Officer Tel:0300 300 6983
Case Officer Email:janine.richardson@centralbedfordshire.gov.uk
Status:Decided
Agent:Mr R Harrington
First Floor
12 Church Square
Leighton Buzzard
LU7 1AE
Press Date:No date
Site Notice Date:27 / 09 / 2022
NeighboursResponses Received: 1
and Representatives:In Favour: 0
Representation DetailsAgainst: 0
Comments: 1
Petitions Against: 0
Petitions For: 0
Officer Site Visit Date:27/09/2022
Committee Site Visit Date:No date
Committee Meeting Date:No date
Decision Level:Officer Delegated
Date Decision Made:07 / 02 / 2023
Date Decision Despatched:07 / 02 / 2023
Decision:Full Application - Granted
Conditions or Reasons:View Conditions or Reasons
Informative Notes:
1 )The applicant should address the following points when submitting details to discharge conditions 3 and 4: Culverting of existing watercourses will not be permitted. There should be a minimum 1m between the base of a soakage unit and the seasonal water table. Any watercourses within or adjacent to the site should be included in the maintenance and management plan, even if there is no discharge to them. This would be a riparian ownership issue but leaving it as such is no longer acceptable. Under Central Bedfordshire Council and IDB bylaws, any watercourse within or adjoining the site boundary will maintain a 9m development free easement (on the development side), unless otherwise agreed with the relevant drainage authority. This applies to all watercourses, where water is present for all or some of the year, including those not clearly stated on mapping, topography or planning documents. The connection of private surface water drainage systems to a highway system is not permitted. The Council does not, and is not required to, adopt any SuDS feature. It is the responsibility of the applicant to ensure that the surface water drainage system, in its entirety, will be effectively maintained in the long-term. We therefore expect confirmation of the proposed arrangements for maintenance to be provided with the final detailed design, including the future maintenance and operational needs and the responsible bodies for undertaking maintenance (for all public and private drainage components). The final detailed design including proposed standards of operation, construction, structural integrity and ongoing maintenance must be compliant with the 'Non-statutory technical standards for sustainable drainage systems' (March 2015, Ref: PB14308), 'Central Bedfordshire Sustainable Drainage Guidance' (Adopted April 2014, Updated May 2015), and recognised best practise including the Ciria SuDS Manual (2016, C753).The applicant should address the following points when submitting details to discharge conditions 3 and 4: Culverting of existing watercourses will not be permitted. There should be a minimum 1m between the base of a soakage unit and the seasonal water table. Any watercourses within or adjacent to the site should be included in the maintenance and management plan, even if there is no discharge to them. This would be a riparian ownership issue but leaving it as such is no longer acceptable. Under Central Bedfordshire Council and IDB bylaws, any watercourse within or adjoining the site boundary will maintain a 9m development free easement (on the development side), unless otherwise agreed with the relevant drainage authority. This applies to all watercourses, where water is present for all or some of the year, including those not clearly stated on mapping, topography or planning documents. The connection of private surface water drainage systems to a highway system is not permitted. The Council does not, and is not required to, adopt any SuDS feature. It is the responsibility of the applicant to ensure that the surface water drainage system, in its entirety, will be effectively maintained in the long-term. We therefore expect confirmation of the proposed arrangements for maintenance to be provided with the final detailed design, including the future maintenance and operational needs and the responsible bodies for undertaking maintenance (for all public and private drainage components). The final detailed design including proposed standards of operation, construction, structural integrity and ongoing maintenance must be compliant with the 'Non-statutory technical standards for sustainable drainage systems' (March 2015, Ref: PB14308), 'Central Bedfordshire Sustainable Drainage Guidance' (Adopted April 2014, Updated May 2015), and recognised best practise including the Ciria SuDS Manual (2016, C753).
2 )The applicant is advised that in order to comply with Conditions 8 and 9 of this permission it will be necessary for the developer of the site to enter into an agreement with Central Bedfordshire Council as Highway Authority under Section 278 of the Highways Act 1980 to ensure the satisfactory completion of the access and associated road improvements. Further details can be obtained from the Highways Agreements Officer, Highways Contract Team, Community Services, Central Bedfordshire Council, Priory House, Monks Walk, Chicksands, Shefford SG17 5TQThe applicant is advised that in order to comply with Conditions 8 and 9 of this permission it will be necessary for the developer of the site to enter into an agreement with Central Bedfordshire Council as Highway Authority under Section 278 of the Highways Act 1980 to ensure the satisfactory completion of the access and associated road improvements. Further details can be obtained from the Highways Agreements Officer, Highways Contract Team, Community Services, Central Bedfordshire Council, Priory House, Monks Walk, Chicksands, Shefford SG17 5TQ
Appeal Received Date:This case has no appeals against it
Planning Obligation Status:Not available

Return to Search PageTop of Page