Details of Planning Application - CB/22/04720/FULL

Click on the Consultation link below for neighbour and statutory consultee information and to comment on this application. Ensure your opinions are received before the consultation closing date.


Application Details View Documents (opens in new window) Consultation
Application registeredConsultation periodAwaiting decisionDecidedAppealAppeal decided
Application Type:Full Application
Date Received:07 / 12 / 2022
Registration (Validation) Date:06 / 01 / 2023
Consultation Start Date:06 / 01 / 2023
Earliest Decision Date (Consultation Period Expires):01 / 02 / 2024
Target Date for Decision:04 / 10 / 2024
Location:Phases 3 & 4 Land rear of 155-229, High Street, Arlesey
Parish Name:Arlesey
Conservation Area:Not available
Listed Building Grade:Not available
Environmental Assessment:Not available
Expected Decision Level:Not available
Description:Erection of 146 dwellings, access, parking, amenity space, drainage basin and other associated works, including provision of section of Arlesey Relief Road
Case Officer:Andrew Cundy
Case Officer Tel:0300 300 4532
Case Officer Email:andrew.cundy@centralbedfordshire.gov.uk
Status:Decided
Agent:DLA Town Planning Ltd
5 The Gavel Centre
Porters Wood
St Albans
Herts
AL3 6PQ
Press Date:27 / 01 / 2023
Site Notice Date:15 / 01 / 2023
NeighboursResponses Received: 18
and Representatives:In Favour: 0
Representation DetailsAgainst: 15
Comments: 3
Petitions Against: 0
Petitions For: 0
Officer Site Visit Date:16/01/2023
Committee Site Visit Date:No date
Committee Meeting Date:07 / 02 / 2024
Decision Level:Development Management Committee
Date Decision Made:04 / 10 / 2024
Date Decision Despatched:04 / 10 / 2024
Decision:Full Application - Granted
Conditions or Reasons:View Conditions or Reasons
Informative Notes:
1 )Drainage 1. We consider there is an ability to adjust the storage to allow a half drain time of 24 hours. This is to be managed as a condition instead of objection. 2. We will require an adjusted set of calculations providing evidence of all surface water retained on site for the 1 in 100 (+40%CC+10% Urban Creep) with a half drain time of 24 hours. Any exceedance should be shown with pathways, depths and velocity. 3. We will require full drainage drawings showing all connections, control features, storage, inverts etc. and how it communicates with the development wide scheme. The drawings supplied may need adjustment to accommodate the half drain time required. 4. Culverting of existing watercourses will not be permitted. 5. Any watercourses within or adjacent to the site should be included in the maintenance and management plan, even if there is no discharge to them. This would be a riparian ownership issue but leaving it as such is no longer acceptable. 6. Under Central Bedfordshire Council and IDB bylaws, any watercourse within or adjoining the site boundary will maintain a 9m development free easement (on the development side), unless otherwise agreed with the relevant drainage authority. This applies to all watercourses, where water is present for all or some of the year, including those not clearly stated on mapping, topography or planning documents. 7. The connection of private surface water drainage systems to a highway system is not permitted. 8. Permeable block paving should be laid to CIRIA C768 'Guidance on the construction of SuDS' guidelines. This guidance also stipulates following Interlay guidance. 9. The Council does not, and is not required to, adopt any SuDS feature. It is the responsibility of the applicant to ensure that the surface water drainage system, in its entirety, will be effectively maintained in the long-term. We therefore expect confirmation of the proposed arrangements for maintenance to be provided with the final detailed design, including the future maintenance and operational needs and the responsible bodies for undertaking maintenance (for all public and private drainage components). 10. The final detailed design including proposed standards of operation, construction, structural integrity and ongoing maintenance must be compliant with the 'Non-statutory technical standards for sustainable drainage systems' (March 2015, Ref: PB14308), 'Central Bedfordshire Sustainable Drainage Guidance' (Adopted April 2014, Updated May 2015), and recognised best practise including the Ciria SuDS Manual (2016, C753). 11. Land drainage Consent under the Land Drainage Act 1991 must be secured to discharge surface water to an existing watercourse/ditch, and details of this provided with the full detailed design. An easement should be provided on the developable side of the watercourse to allow for access for maintenance, this should be 9m but may depend on the maintenance requirements considered appropriate.Drainage 1. We consider there is an ability to adjust the storage to allow a half drain time of 24 hours. This is to be managed as a condition instead of objection. 2. We will require an adjusted set of calculations providing evidence of all surface water retained on site for the 1 in 100 (+40%CC+10% Urban Creep) with a half drain time of 24 hours. Any exceedance should be shown with pathways, depths and velocity. 3. We will require full drainage drawings showing all connections, control features, storage, inverts etc. and how it communicates with the development wide scheme. The drawings supplied may need adjustment to accommodate the half drain time required. 4. Culverting of existing watercourses will not be permitted. 5. Any watercourses within or adjacent to the site should be included in the maintenance and management plan, even if there is no discharge to them. This would be a riparian ownership issue but leaving it as such is no longer acceptable. 6. Under Central Bedfordshire Council and IDB bylaws, any watercourse within or adjoining the site boundary will maintain a 9m development free easement (on the development side), unless otherwise agreed with the relevant drainage authority. This applies to all watercourses, where water is present for all or some of the year, including those not clearly stated on mapping, topography or planning documents. 7. The connection of private surface water drainage systems to a highway system is not permitted. 8. Permeable block paving should be laid to CIRIA C768 'Guidance on the construction of SuDS' guidelines. This guidance also stipulates following Interlay guidance. 9. The Council does not, and is not required to, adopt any SuDS feature. It is the responsibility of the applicant to ensure that the surface water drainage system, in its entirety, will be effectively maintained in the long-term. We therefore expect confirmation of the proposed arrangements for maintenance to be provided with the final detailed design, including the future maintenance and operational needs and the responsible bodies for undertaking maintenance (for all public and private drainage components). 10. The final detailed design including proposed standards of operation, construction, structural integrity and ongoing maintenance must be compliant with the 'Non-statutory technical standards for sustainable drainage systems' (March 2015, Ref: PB14308), 'Central Bedfordshire Sustainable Drainage Guidance' (Adopted April 2014, Updated May 2015), and recognised best practise including the Ciria SuDS Manual (2016, C753). 11. Land drainage Consent under the Land Drainage Act 1991 must be secured to discharge surface water to an existing watercourse/ditch, and details of this provided with the full detailed design. An easement should be provided on the developable side of the watercourse to allow for access for maintenance, this should be 9m but may depend on the maintenance requirements considered appropriate.
2 )Network Rail Standard Drainage Requirements We ask that all surface and foul water drainage from the development area be directed away from Network Rail's retained land and structures into suitable drainage systems, the details of which are to be approved by Network Rail before construction starts on site. Water must not be caused to pond on or near railway land either during or after any construction-related activity. The construction of soakaways for storm or surface water drainage should not take place within 20m of the Network Rail boundary. Any new drains are to be constructed and maintained so as not to have any adverse effect upon the stability of any Network Rail equipment, structure, cutting or embankment. The construction of soakaways within any lease area is not permitted. The construction of surface water retention ponds/tanks, SuDS or flow control systems should not take place within 20m of the Network Rail boundary where these systems are proposed to be below existing track level. Full overland flow conditions should be submitted to Network Rail for approval prior to any works on site commencing. The construction of surface water retention ponds/tanks, SuDS or flow control systems should not take place within 30m of the Network Rail boundary where these systems are proposed to be above existing track level. Full overland flow conditions should be submitted to Network Rail for approval prior to any works on site commencing. If a Network Rail-owned underline structure (such as a culvert, pipe or drain) is intended to act as a means of conveying surface water within or away from the development, then all parties must work together to ensure that the structure is fit for purpose and able to take the proposed flows without risk to the safety of the railway or the surrounding land. Wayleaves and or easements for underline drainage assets The position of any underline drainage asset shall not be within 5m of drainage assets, sensitive operational equipment such as switches and crossings, track joints, welds, overhead line stanchions and line side equipment, and not within 15m of bridges, culverts, retaining walls and other structures supporting railway live loading. Protection of existing railway drainage assets within a clearance area There are likely to be existing railway drainage assets in the vicinity of the proposed works. Please proceed with caution. No connection of drainage shall be made to these assets without Network Rail's prior consent to detailed proposals. Any works within 5m of the assets will require prior consent. There must be no interfering with existing drainage assets/systems without Network Rail's written permission. The developer is asked to ascertain with Network Rail the existence of any existing railway drainage assets or systems in the vicinity of the development area before work starts on site. Please contact Asset Protection (assetprotectioneastern@networkrail.co.uk) for further information and assistance. Informative 3 (Network Rail Standard Informatives) Fail Safe Use of Crane and Plant All operations, including the use of cranes or other mechanical plant working adjacent to Network Rail's property, must at all times be carried out in a 'fail safe' manner such that in the event of mishandling, collapse or failure, no materials or plant are capable of falling within 3.0m of the nearest rail of the adjacent railway line, or where the railway is electrified, within 3.0m of overhead electrical equipment or supports. With a development of a certain height that may/will require use of a crane, the developer must bear in mind the following. Crane usage adjacent to railway infrastructure is subject to stipulations on size, capacity etc. which needs to be agreed by the Asset Protection Project Manager prior to implementation. Excavations/Earthworks All excavations/ earthworks carried out in the vicinity of Network Rail property/ structures must be designed and executed such that no interference with the integrity of that property/ structure can occur. If temporary works compounds are to be located adjacent to the operational railway, these should be included in a method statement for approval by Network Rail. Prior to commencement of works, full details of excavations and earthworks to be carried out near the railway undertaker's boundary fence should be submitted for the approval of the Local Planning Authority acting in consultation with the railway undertaker and the works shall only be carried out in accordance with the approved details. Where development may affect the railway, consultation with the Asset Protection Project Manager should be undertaken. Network Rail will not accept any liability for any settlement, disturbance or damage caused to any development by failure of the railway infrastructure nor for any noise or vibration arising from the normal use and/or maintenance of the operational railway. No right of support is given or can be claimed from Network Rails infrastructure or railway land. Security of Mutual Boundary Security of the railway boundary will need to be maintained at all times. If the works require temporary or permanent alterations to the mutual boundary the applicant must contact Network Rail's Asset Protection Project Manager. Demolition Any demolition or refurbishment works must not be carried out on the development site that may endanger the safe operation of the railway, or the stability of the adjoining Network Rail structures. The demolition of buildings or other structures near to the operational railway infrastructure must be carried out in accordance with an agreed method statement. Approval of the method statement must be obtained from Network Rail's Asset Protection Project Manager before the development can commence. Vibro-impact Machinery Where vibro-compaction machinery is to be used in development, details of the use of such machinery and a method statement should be submitted for the approval of the Local Planning Authority acting in consultation with the railway undertaker prior to the commencement of works and the works shall only be carried out in accordance with the approved method statement. Scaffolding Any scaffold which is to be constructed within 10 metres of the railway boundary fence must be erected in such a manner that at no time will any poles over-sail the railway and protective netting around such scaffold must be installed. Bridge Strikes Applications that are likely to generate an increase in trips under railway bridges may be of concern to Network Rail where there is potential for an increase in 'Bridge strikes'. Vehicles hitting railway bridges cause significant disruption and delay to rail users. Consultation with the Asset Protection OFFICIAL Project Manager is necessary to understand if there is a problem. If required there may be a need to fit bridge protection barriers which may be at the developer's expense. Abnormal Loads From the information supplied, it is not clear if any abnormal loads will be using routes that include any Network Rail assets (e.g. bridges and level crossings). We would have serious reservations if during the construction or operation of the site, abnormal loads will use routes that include Network Rail assets. Network Rail would request that the applicant contact our Asset Protection Project Manager to confirm that any proposed route is viable and to agree a strategy to protect our asset(s) from any potential damage caused by abnormal loads. I would also like to advise that where any damage, injury or delay to the rail network is caused by an abnormal load (related to the application site), the applicant or developer will incur full liability. Two Metre Boundary Consideration should be given to ensure that the construction and subsequent maintenance can be carried out to any proposed buildings or structures without adversely affecting the safety of, or encroaching upon Network Rail's adjacent land, and therefore all/any building should be situated at least 2 metres from Network Rail's boundary. This will allow construction and future maintenance to be carried out from the applicant's land, thus reducing the probability of provision and costs of railway look-out protection, supervision and other facilities necessary when working from or on railway land. ENCROACHMENT The developer/applicant must ensure that their proposal, both during construction, and after completion of works on site, does not affect the safety, operation or integrity of the operational railway, Network Rail and its infrastructure or undermine or damage or adversely affect any railway land and structures. There must be no physical encroachment of the proposal onto Network Rail land, no over-sailing into Network Rail airspace and no encroachment of foundations onto Network Rail land and soil. There must be no physical encroachment of any foundations onto Network Rail land. Any future maintenance must be conducted solely within the applicant's land ownership. Should the applicant require access to Network Rail land then must seek approval from the Network Rail Asset Protection Team. Any unauthorised access to Network Rail land or airspace is an act of trespass and we would remind the council that this is a criminal offence (s55 British Transport Commission Act 1949). Should the applicant be granted access to Network Rail land then they will be liable for all costs incurred in facilitating the proposal. Access to the Railway All roads, paths or ways providing access to any part of the railway undertaker's land shall be kept open at all times during and after the development. Informative 4 (Rights of Way) The applicant is advised to ensure that the definitive legal line of any public right of way is mapped at the earliest opportunity and that no development should take place on or near a public right of way unless the necessary statutory legal process (where necessary) has been completed in accordance with:  i. An order made, confirmed and certified under the provisions of Section 247 of the Town and Country Planning Act 1990 ii. An order made, confirmed and certified under the provisions of the Highways Act 1980 iii. An order made under any other relevant legislation concerning the modification, creation, diversion or extinguishment of a right of wayNetwork Rail Standard Drainage Requirements We ask that all surface and foul water drainage from the development area be directed away from Network Rail's retained land and structures into suitable drainage systems, the details of which are to be approved by Network Rail before construction starts on site. Water must not be caused to pond on or near railway land either during or after any construction-related activity. The construction of soakaways for storm or surface water drainage should not take place within 20m of the Network Rail boundary. Any new drains are to be constructed and maintained so as not to have any adverse effect upon the stability of any Network Rail equipment, structure, cutting or embankment. The construction of soakaways within any lease area is not permitted. The construction of surface water retention ponds/tanks, SuDS or flow control systems should not take place within 20m of the Network Rail boundary where these systems are proposed to be below existing track level. Full overland flow conditions should be submitted to Network Rail for approval prior to any works on site commencing. The construction of surface water retention ponds/tanks, SuDS or flow control systems should not take place within 30m of the Network Rail boundary where these systems are proposed to be above existing track level. Full overland flow conditions should be submitted to Network Rail for approval prior to any works on site commencing. If a Network Rail-owned underline structure (such as a culvert, pipe or drain) is intended to act as a means of conveying surface water within or away from the development, then all parties must work together to ensure that the structure is fit for purpose and able to take the proposed flows without risk to the safety of the railway or the surrounding land. Wayleaves and or easements for underline drainage assets The position of any underline drainage asset shall not be within 5m of drainage assets, sensitive operational equipment such as switches and crossings, track joints, welds, overhead line stanchions and line side equipment, and not within 15m of bridges, culverts, retaining walls and other structures supporting railway live loading. Protection of existing railway drainage assets within a clearance area There are likely to be existing railway drainage assets in the vicinity of the proposed works. Please proceed with caution. No connection of drainage shall be made to these assets without Network Rail's prior consent to detailed proposals. Any works within 5m of the assets will require prior consent. There must be no interfering with existing drainage assets/systems without Network Rail's written permission. The developer is asked to ascertain with Network Rail the existence of any existing railway drainage assets or systems in the vicinity of the development area before work starts on site. Please contact Asset Protection (assetprotectioneastern@networkrail.co.uk) for further information and assistance. Informative 3 (Network Rail Standard Informatives) Fail Safe Use of Crane and Plant All operations, including the use of cranes or other mechanical plant working adjacent to Network Rail's property, must at all times be carried out in a 'fail safe' manner such that in the event of mishandling, collapse or failure, no materials or plant are capable of falling within 3.0m of the nearest rail of the adjacent railway line, or where the railway is electrified, within 3.0m of overhead electrical equipment or supports. With a development of a certain height that may/will require use of a crane, the developer must bear in mind the following. Crane usage adjacent to railway infrastructure is subject to stipulations on size, capacity etc. which needs to be agreed by the Asset Protection Project Manager prior to implementation. Excavations/Earthworks All excavations/ earthworks carried out in the vicinity of Network Rail property/ structures must be designed and executed such that no interference with the integrity of that property/ structure can occur. If temporary works compounds are to be located adjacent to the operational railway, these should be included in a method statement for approval by Network Rail. Prior to commencement of works, full details of excavations and earthworks to be carried out near the railway undertaker's boundary fence should be submitted for the approval of the Local Planning Authority acting in consultation with the railway undertaker and the works shall only be carried out in accordance with the approved details. Where development may affect the railway, consultation with the Asset Protection Project Manager should be undertaken. Network Rail will not accept any liability for any settlement, disturbance or damage caused to any development by failure of the railway infrastructure nor for any noise or vibration arising from the normal use and/or maintenance of the operational railway. No right of support is given or can be claimed from Network Rails infrastructure or railway land. Security of Mutual Boundary Security of the railway boundary will need to be maintained at all times. If the works require temporary or permanent alterations to the mutual boundary the applicant must contact Network Rail's Asset Protection Project Manager. Demolition Any demolition or refurbishment works must not be carried out on the development site that may endanger the safe operation of the railway, or the stability of the adjoining Network Rail structures. The demolition of buildings or other structures near to the operational railway infrastructure must be carried out in accordance with an agreed method statement. Approval of the method statement must be obtained from Network Rail's Asset Protection Project Manager before the development can commence. Vibro-impact Machinery Where vibro-compaction machinery is to be used in development, details of the use of such machinery and a method statement should be submitted for the approval of the Local Planning Authority acting in consultation with the railway undertaker prior to the commencement of works and the works shall only be carried out in accordance with the approved method statement. Scaffolding Any scaffold which is to be constructed within 10 metres of the railway boundary fence must be erected in such a manner that at no time will any poles over-sail the railway and protective netting around such scaffold must be installed. Bridge Strikes Applications that are likely to generate an increase in trips under railway bridges may be of concern to Network Rail where there is potential for an increase in 'Bridge strikes'. Vehicles hitting railway bridges cause significant disruption and delay to rail users. Consultation with the Asset Protection OFFICIAL Project Manager is necessary to understand if there is a problem. If required there may be a need to fit bridge protection barriers which may be at the developer's expense. Abnormal Loads From the information supplied, it is not clear if any abnormal loads will be using routes that include any Network Rail assets (e.g. bridges and level crossings). We would have serious reservations if during the construction or operation of the site, abnormal loads will use routes that include Network Rail assets. Network Rail would request that the applicant contact our Asset Protection Project Manager to confirm that any proposed route is viable and to agree a strategy to protect our asset(s) from any potential damage caused by abnormal loads. I would also like to advise that where any damage, injury or delay to the rail network is caused by an abnormal load (related to the application site), the applicant or developer will incur full liability. Two Metre Boundary Consideration should be given to ensure that the construction and subsequent maintenance can be carried out to any proposed buildings or structures without adversely affecting the safety of, or encroaching upon Network Rail's adjacent land, and therefore all/any building should be situated at least 2 metres from Network Rail's boundary. This will allow construction and future maintenance to be carried out from the applicant's land, thus reducing the probability of provision and costs of railway look-out protection, supervision and other facilities necessary when working from or on railway land. ENCROACHMENT The developer/applicant must ensure that their proposal, both during construction, and after completion of works on site, does not affect the safety, operation or integrity of the operational railway, Network Rail and its infrastructure or undermine or damage or adversely affect any railway land and structures. There must be no physical encroachment of the proposal onto Network Rail land, no over-sailing into Network Rail airspace and no encroachment of foundations onto Network Rail land and soil. There must be no physical encroachment of any foundations onto Network Rail land. Any future maintenance must be conducted solely within the applicant's land ownership. Should the applicant require access to Network Rail land then must seek approval from the Network Rail Asset Protection Team. Any unauthorised access to Network Rail land or airspace is an act of trespass and we would remind the council that this is a criminal offence (s55 British Transport Commission Act 1949). Should the applicant be granted access to Network Rail land then they will be liable for all costs incurred in facilitating the proposal. Access to the Railway All roads, paths or ways providing access to any part of the railway undertaker's land shall be kept open at all times during and after the development. Informative 4 (Rights of Way) The applicant is advised to ensure that the definitive legal line of any public right of way is mapped at the earliest opportunity and that no development should take place on or near a public right of way unless the necessary statutory legal process (where necessary) has been completed in accordance with:  i. An order made, confirmed and certified under the provisions of Section 247 of the Town and Country Planning Act 1990 ii. An order made, confirmed and certified under the provisions of the Highways Act 1980 iii. An order made under any other relevant legislation concerning the modification, creation, diversion or extinguishment of a right of way
3 )Highways The applicant is advised that if it is the intention to request Central Bedfordshire Council as Local Highway Authority, to adopt the proposed highways within the site as maintainable at the public expense then details of the specification, layout and alignment, width and levels of the said highways together with all the necessary highway, street lighting and drainage arrangements, including run off calculations shall be submitted to the Highways Agreements Officer, Highways Contract Team, Community Services, Central Bedfordshire Council, Priory House, Monks Walk, Chicksands, Shefford SG17 5TQHighways The applicant is advised that if it is the intention to request Central Bedfordshire Council as Local Highway Authority, to adopt the proposed highways within the site as maintainable at the public expense then details of the specification, layout and alignment, width and levels of the said highways together with all the necessary highway, street lighting and drainage arrangements, including run off calculations shall be submitted to the Highways Agreements Officer, Highways Contract Team, Community Services, Central Bedfordshire Council, Priory House, Monks Walk, Chicksands, Shefford SG17 5TQ
Appeal Received Date:This case has no appeals against it
Planning Obligation Status:Not available