Details of Planning Application - CB/23/03092/FULL

Click on the Consultation link below for neighbour and statutory consultee information and to comment on this application. Ensure your opinions are received before the consultation closing date.


Application Details View Documents (opens in new window) Consultation
Application registeredConsultation periodAwaiting decisionDecidedAppealAppeal decided
Application Type:Full Application
Date Received:19 / 09 / 2023
Registration (Validation) Date:25 / 09 / 2023
Consultation Start Date:25 / 09 / 2023
Earliest Decision Date (Consultation Period Expires):21 / 07 / 2025
Target Date for Decision:20 / 11 / 2023
Location:Tilsworth Stud Farm, Stanbridge Road, Tilsworth, Leighton Buzzard
Parish Name:Tilsworth
Conservation Area:Not available
Listed Building Grade:Not available
Environmental Assessment:Not available
Expected Decision Level:Not available
Description:Conversion of stable barn to create three dwellings and associated works.
Case Officer:Andrew Mead
Case Officer Tel:0300 300 4663
Case Officer Email:andrew.mead@centralbedfordshire.gov.uk
Status:Decided
Agent:Mr L Wilbraham
PO Box 6518
Rugby
CV21 9QE
Press Date:No date
Site Notice Date:20 / 10 / 2023
NeighboursResponses Received: 0
and Representatives:In Favour: 0
Representation DetailsAgainst: 0
Comments: 0
Petitions Against: 0
Petitions For: 0
Officer Site Visit Date:20/10/2023
Committee Site Visit Date:No date
Committee Meeting Date:No date
Decision Level:Officer Delegated
Date Decision Made:04 / 06 / 2025
Date Decision Despatched:04 / 06 / 2025
Decision:Full Application - Granted
Conditions or Reasons:View Conditions or Reasons
Informative Notes:
1 )This permission relates only to that required under the Town & Country Planning Acts and does not include any consent or approval under any other enactment or under the Building Regulations. Any other consent or approval which is necessary must be obtained from the appropriate authority.This permission relates only to that required under the Town & Country Planning Acts and does not include any consent or approval under any other enactment or under the Building Regulations. Any other consent or approval which is necessary must be obtained from the appropriate authority.
2 )GDP Policy Informative Central Beds Local Plan In accordance with Article 35 (1) of the Town and Country Planning (Development Management Procedure) (England) Order 2015, the reason for any condition above relates to the Policies as referred to in the Central Bedfordshire Local Plan and the National Planning Policy Framework (NPPF).GDP Policy Informative Central Beds Local Plan In accordance with Article 35 (1) of the Town and Country Planning (Development Management Procedure) (England) Order 2015, the reason for any condition above relates to the Policies as referred to in the Central Bedfordshire Local Plan and the National Planning Policy Framework (NPPF).
3 )i. The applicant is advised that no works associated with the construction of the vehicular access should be carried out within the confines of the public highway without prior consent, in writing, of the Central Bedfordshire Council. Upon receipt of this Notice of Planning Approval, the applicant is advised to follow this link on the Council website http://www.centralbedfordshire.gov.uk/transport/request/dropped-kerb.aspx or contact Central Bedfordshire Council's Highway Help Desk, Tel: 0300 300 8301 quoting the Planning Application number. This will enable the necessary consent and procedures under Section 184 of the Highways Act to be implemented. The applicant is also advised that if any of the works associated with the construction of the vehicular access affects or requires the removal and/or the relocation of any equipment, apparatus or structures (e.g. street name plates, bus stop signs or shelters, statutory authority equipment etc.) then the applicant will be required to bear the cost of such removal or alteration. To fully discharge condition 4 the applicant should provide evidence to the Local Planning Authority that the Highway Authority have undertaken the construction in accordance with the approved plan, before the development is brought into use. ii. The applicant is advised that the requirements of the New Roads and Street Works Act 1991 will apply to any works undertaken within the limits of the existing public highway. Further details can be obtained from The Street Works Co-ordinator, Bedfordshire Highways, by contacting the Highways Helpdesk 0300 300 8301. iii. The applicant is advised that the storage of materials associated with this development should take place within the site and not extend into within the public highway without authorisation from the highway authority. If necessary further details can be obtained from The Street Works Co-ordinator, Central Bedfordshire Highways, by contacting the Highways Helpdesk 0300 300 8301.i. The applicant is advised that no works associated with the construction of the vehicular access should be carried out within the confines of the public highway without prior consent, in writing, of the Central Bedfordshire Council. Upon receipt of this Notice of Planning Approval, the applicant is advised to follow this link on the Council website http://www.centralbedfordshire.gov.uk/transport/request/dropped-kerb.aspx or contact Central Bedfordshire Council's Highway Help Desk, Tel: 0300 300 8301 quoting the Planning Application number. This will enable the necessary consent and procedures under Section 184 of the Highways Act to be implemented. The applicant is also advised that if any of the works associated with the construction of the vehicular access affects or requires the removal and/or the relocation of any equipment, apparatus or structures (e.g. street name plates, bus stop signs or shelters, statutory authority equipment etc.) then the applicant will be required to bear the cost of such removal or alteration. To fully discharge condition 4 the applicant should provide evidence to the Local Planning Authority that the Highway Authority have undertaken the construction in accordance with the approved plan, before the development is brought into use. ii. The applicant is advised that the requirements of the New Roads and Street Works Act 1991 will apply to any works undertaken within the limits of the existing public highway. Further details can be obtained from The Street Works Co-ordinator, Bedfordshire Highways, by contacting the Highways Helpdesk 0300 300 8301. iii. The applicant is advised that the storage of materials associated with this development should take place within the site and not extend into within the public highway without authorisation from the highway authority. If necessary further details can be obtained from The Street Works Co-ordinator, Central Bedfordshire Highways, by contacting the Highways Helpdesk 0300 300 8301.
4 )The applicant is advised where roofing work or timber treatment is to be undertaken it is the legal responsibility of the contractor to check for bats. If bats are found during the course of any work to buildings or trees where not previously anticipated, then works should immediately stop and Natural England notified for appropriate advice.The applicant is advised where roofing work or timber treatment is to be undertaken it is the legal responsibility of the contractor to check for bats. If bats are found during the course of any work to buildings or trees where not previously anticipated, then works should immediately stop and Natural England notified for appropriate advice.
5 )Additional information relating to Condition 3: 1. A full set of calculations will be required for each phase and in total, providing evidence of all surface water retained on site for the 1 in 100 (+40%CC+10% Urban Creep). Any exceedance should be shown with pathways, depths and velocity. 2. Full drainage drawings will be required showing all connections, control features, storage, inverts etc. and how it communicates with the development wide scheme. 3. BRE365 infiltration test results are required 4. Culverting of existing watercourses will not be permitted. 5. There should be a minimum 1m between the base of a soakage unit and the seasonal water table. 6. Any watercourses within or adjacent to the site should be included in the maintenance and management plan, even if there is no discharge to them. This would be a riparian ownership issue but leaving it as such is no longer acceptable. 7. Under Central Bedfordshire Council and IDB bylaws, any watercourse within or adjoining the site boundary will maintain a 9m development free easement (on the development side), unless otherwise agreed with the relevant drainage authority. This applies to all watercourses, where water is present for all or some of the year, including those not clearly stated on mapping, topography or planning documents. 8. The connection of private surface water drainage systems to a highway system is not permitted. 9. Permeable block paving should be laid to CIRIA C768 'Guidance on the construction of SuDS' guidelines. This guidance also stipulates following Interlay guidance. 10. The Council does not, and is not required to, adopt any SuDS feature. It is the responsibility of the applicant to ensure that the surface water drainage system, in its entirety, will be effectively maintained in the long-term. We therefore expect confirmation of the proposed arrangements for maintenance to be provided with the final detailed design, including the future maintenance and operational needs and the responsible bodies for undertaking maintenance (for all public and private drainage components). 11. The final detailed design including proposed standards of operation, construction, structural integrity and ongoing maintenance must be compliant with the 'Non-statutory technical standards for sustainable drainage systems' (March 2015, Ref: PB14308), 'Central Bedfordshire Sustainable Drainage Guidance' (Adopted April 2014, Updated May 2015), and recognised best practise including the Ciria SuDS Manual (2016, C753).Additional information relating to Condition 3: 1. A full set of calculations will be required for each phase and in total, providing evidence of all surface water retained on site for the 1 in 100 (+40%CC+10% Urban Creep). Any exceedance should be shown with pathways, depths and velocity. 2. Full drainage drawings will be required showing all connections, control features, storage, inverts etc. and how it communicates with the development wide scheme. 3. BRE365 infiltration test results are required 4. Culverting of existing watercourses will not be permitted. 5. There should be a minimum 1m between the base of a soakage unit and the seasonal water table. 6. Any watercourses within or adjacent to the site should be included in the maintenance and management plan, even if there is no discharge to them. This would be a riparian ownership issue but leaving it as such is no longer acceptable. 7. Under Central Bedfordshire Council and IDB bylaws, any watercourse within or adjoining the site boundary will maintain a 9m development free easement (on the development side), unless otherwise agreed with the relevant drainage authority. This applies to all watercourses, where water is present for all or some of the year, including those not clearly stated on mapping, topography or planning documents. 8. The connection of private surface water drainage systems to a highway system is not permitted. 9. Permeable block paving should be laid to CIRIA C768 'Guidance on the construction of SuDS' guidelines. This guidance also stipulates following Interlay guidance. 10. The Council does not, and is not required to, adopt any SuDS feature. It is the responsibility of the applicant to ensure that the surface water drainage system, in its entirety, will be effectively maintained in the long-term. We therefore expect confirmation of the proposed arrangements for maintenance to be provided with the final detailed design, including the future maintenance and operational needs and the responsible bodies for undertaking maintenance (for all public and private drainage components). 11. The final detailed design including proposed standards of operation, construction, structural integrity and ongoing maintenance must be compliant with the 'Non-statutory technical standards for sustainable drainage systems' (March 2015, Ref: PB14308), 'Central Bedfordshire Sustainable Drainage Guidance' (Adopted April 2014, Updated May 2015), and recognised best practise including the Ciria SuDS Manual (2016, C753).
6 )The applicant and developer are advised that this permission is subject to a legal obligation under Section 106 of the Town and Country Planning Act 1990.The applicant and developer are advised that this permission is subject to a legal obligation under Section 106 of the Town and Country Planning Act 1990.
Appeal Received Date:This case has no appeals against it
Planning Obligation Status:Not available