| Details of Planning Application -
CB/23/03567/FULL |
| Application registered | Consultation period | Awaiting decision | Decided | Appeal | Appeal decided |
|
|---|
| Application Type: | Full Application |
|---|
| Date Received: | 03
/
11
/
2023 |
|---|
| Registration (Validation) Date: | 15
/
11
/
2023 |
|---|
| Consultation Start Date: | 15
/
11
/
2023 |
|---|
| Earliest Decision Date (Consultation Period Expires): | 10
/
03
/
2025 |
|---|
| Target Date for Decision: | 10
/
01
/
2024 |
|---|
| Location: | 39 Shefford Road, Clifton, Shefford, SG17 5RQ |
|---|
| Parish Name: | Clifton |
|---|
| Conservation Area: | Not available |
|---|
| Listed Building Grade: | Not available |
|---|
| Environmental Assessment: | Not available |
|---|
| Expected Decision Level: | Not available |
|---|
| Description: | Erection of a new 2 bed bungalow |
|---|
| Case Officer: | Eilis Edmonds |
|---|
| Case Officer Tel: | 0300 300 4736 |
|---|
| Case Officer Email: | eilis.edmonds@centralbedfordshire.gov.uk |
|---|
| Status: | Decided |
|---|
| Agent: | Mr S Everitt |
|---|
| 88 Holland Road |
|---|
| Ampthill |
|---|
| Beds |
|---|
| MK45 2RS |
|---|
| Press Date: | No date |
|---|
| Site Notice Date: | No date |
|---|
| Neighbours | Responses Received:
0 |
|---|
| and Representatives: | In Favour:
0 |
|---|
| Representation Details | Against:
0 |
|---|
| Comments:
0 |
|---|
| Petitions Against:
0 |
|---|
| Petitions For:
0 |
|---|
| Officer Site Visit Date: | No date |
|---|
| Committee Site Visit Date: | No date |
|---|
| Committee Meeting Date: | No date |
|---|
| Decision Level: | Officer Delegated |
|---|
| Date Decision Made: | 29
/
05
/
2025 |
|---|
| Date Decision Despatched: | 29
/
05
/
2025 |
|---|
| Decision: | Full Application - Granted |
|---|
| Conditions or Reasons: | View Conditions or Reasons |
|---|
| Informative Notes: | | 1
)Condition 5 of this permission requires works to be carried out in accordance with plan ref SE3409/3H, including with respect to the widening of the access shown as 'Harbrook Lane', with geogrid shown either side of the existing tarmac surfacing for the length of the access in the red-line site. However, this is not required the full length of the lane, whereby the access needs to be widened to 4.8m for the first 8m from the highway boundary. Accordingly, the wording of this condition sets out that there is not a requirement for a widened access after 8m, and that it can remain as existing.Condition 5 of this permission requires works to be carried out in accordance with plan ref SE3409/3H, including with respect to the widening of the access shown as 'Harbrook Lane', with geogrid shown either side of the existing tarmac surfacing for the length of the access in the red-line site. However, this is not required the full length of the lane, whereby the access needs to be widened to 4.8m for the first 8m from the highway boundary. Accordingly, the wording of this condition sets out that there is not a requirement for a widened access after 8m, and that it can remain as existing. |
|
|---|
| Appeal Received Date: | This case has no appeals against it |
|---|
| Planning Obligation Status: | Not available |
|---|