| Informative Notes: | | 1
)Please note that there is a contribution to pay for the supply/delivery of the bins. This must be paid prior to discharging the relevant condition. A purchase order must be raised for the quantity of bins required and sent to Environmental Services quoting the relevant planning reference numberPlease note that there is a contribution to pay for the supply/delivery of the bins. This must be paid prior to discharging the relevant condition. A purchase order must be raised for the quantity of bins required and sent to Environmental Services quoting the relevant planning reference number |
| 2
)The applicant is advised that no works associated with the construction of the vehicular access should be carried out within the confines of the public highway without prior consent, in writing, of the Central Bedfordshire Council Highways Department. Upon receipt of this Notice of Planning Approval, the applicant is advised to seek approval from the Local Planning Authority for details of the proposed vehicular access junction in accordance with condition 1**. Upon formal approval of details, the applicant is advised to follow this link on the Council website Dropped kerb - applications, conditions and limitations | Central Bedfordshire Council or contact Central Bedfordshire Council Tel: 0300 300 8301 quoting the Planning Application number. This will enable the necessary consent and procedures under Section 184 of the Highways Act to be implemented. The
applicant is also advised that if any of the works associated with the construction of the vehicular access affects or requires the removal and/or the relocation of any equipment, apparatus or structures (e.g. street name plates, bus stop signs or shelters, statutory authority equipment etc.) then the applicant will be required to bear the cost of such removal or alteration.
· The applicant is advised that no private surface water drainage system designed as part of a new development, will be allowed to enter any existing highway surface water drainage system.
· The applicant is advised that the requirements of the New Roads and Street Works Act 1991 will apply to any works undertaken within the limits of the existing public highway. Further details can be obtained by contacting The Street Works Co-ordinator, Central Bedfordshire Highways, by contacting the Highways Helpdesk 0300 300 8301 or e-mail:
streetworks@centralbedfordshire.gov.uk
· The applicant is advised that parking for contractor's vehicles and the storage of materials and deliveries associated with this development should take place within the site and not extend into within the public highway without authorisation from the highway authority. If necessary the applicant is advised to contact The Street Works Co-ordinator, Central Bedfordshire Highways, by contacting the Highways Helpdesk 0300 300 8301. Under the provisions of the Highways Act 1980 the developer may be liable for any damage caused to the public highway as a result of demolition/construction of the development hereby approved
The contractor and / or client are to ensure that any mud or building material debris such as sand, cement or concrete that is left on the public highway, or any mud arising from construction/demolition vehicular movement, shall be removed immediately and in the case of concrete, cement, mud or mortar not allowed to dry on the highway
· The applicant is advised that all cycle parking to be provided within the site shall be designed in accordance with the Central Bedfordshire Council's : Parking standards for new developments Supplementary Planning Document (SPD) |Central Bedfordshire CouncilThe applicant is advised that no works associated with the construction of the vehicular access should be carried out within the confines of the public highway without prior consent, in writing, of the Central Bedfordshire Council Highways Department. Upon receipt of this Notice of Planning Approval, the applicant is advised to seek approval from the Local Planning Authority for details of the proposed vehicular access junction in accordance with condition 1**. Upon formal approval of details, the applicant is advised to follow this link on the Council website Dropped kerb - applications, conditions and limitations | Central Bedfordshire Council or contact Central Bedfordshire Council Tel: 0300 300 8301 quoting the Planning Application number. This will enable the necessary consent and procedures under Section 184 of the Highways Act to be implemented. The
applicant is also advised that if any of the works associated with the construction of the vehicular access affects or requires the removal and/or the relocation of any equipment, apparatus or structures (e.g. street name plates, bus stop signs or shelters, statutory authority equipment etc.) then the applicant will be required to bear the cost of such removal or alteration.
· The applicant is advised that no private surface water drainage system designed as part of a new development, will be allowed to enter any existing highway surface water drainage system.
· The applicant is advised that the requirements of the New Roads and Street Works Act 1991 will apply to any works undertaken within the limits of the existing public highway. Further details can be obtained by contacting The Street Works Co-ordinator, Central Bedfordshire Highways, by contacting the Highways Helpdesk 0300 300 8301 or e-mail:
streetworks@centralbedfordshire.gov.uk
· The applicant is advised that parking for contractor's vehicles and the storage of materials and deliveries associated with this development should take place within the site and not extend into within the public highway without authorisation from the highway authority. If necessary the applicant is advised to contact The Street Works Co-ordinator, Central Bedfordshire Highways, by contacting the Highways Helpdesk 0300 300 8301. Under the provisions of the Highways Act 1980 the developer may be liable for any damage caused to the public highway as a result of demolition/construction of the development hereby approved
The contractor and / or client are to ensure that any mud or building material debris such as sand, cement or concrete that is left on the public highway, or any mud arising from construction/demolition vehicular movement, shall be removed immediately and in the case of concrete, cement, mud or mortar not allowed to dry on the highway
· The applicant is advised that all cycle parking to be provided within the site shall be designed in accordance with the Central Bedfordshire Council's : Parking standards for new developments Supplementary Planning Document (SPD) |Central Bedfordshire Council |
|
|---|