Details of Planning Application - CB/24/02173/FULL

Click on the Consultation link below for neighbour and statutory consultee information and to comment on this application. Ensure your opinions are received before the consultation closing date.


Application Details View Documents (opens in new window) Consultation
Application registeredConsultation periodAwaiting decisionDecidedAppealAppeal decided
Application Type:Full Application
Date Received:23 / 07 / 2024
Registration (Validation) Date:06 / 08 / 2024
Consultation Start Date:06 / 08 / 2024
Earliest Decision Date (Consultation Period Expires):01 / 11 / 2024
Target Date for Decision:01 / 10 / 2024
Location:Land adjacent to 4 Laburnham Cottages, Chiltern Green, Hyde, Luton, LU2 9PW
Parish Name:Hyde
Conservation Area:Not available
Listed Building Grade:Not available
Environmental Assessment:Not available
Expected Decision Level:Not available
Description:Demolition of stables and erection of single storey, self-build dwelling
Case Officer:Sophie Wharton
Case Officer Tel:0300 300 4453
Case Officer Email:sophie.wharton@centralbedfordshire.gov.uk
Status:Decided
Agent:Mr M Ricketts
64 Tallents Crescent
Harpenden
Hertfordshire
AL5 5BS
Press Date:04 / 09 / 2024
Site Notice Date:22 / 08 / 2024
NeighboursResponses Received: 1
and Representatives:In Favour: 0
Representation DetailsAgainst: 0
Comments: 1
Petitions Against: 0
Petitions For: 0
Officer Site Visit Date:22/08/2024
Committee Site Visit Date:No date
Committee Meeting Date:No date
Decision Level:Officer Delegated
Date Decision Made:07 / 11 / 2024
Date Decision Despatched:07 / 11 / 2024
Decision:Full Application - Granted
Conditions or Reasons:View Conditions or Reasons
Informative Notes:
1 )GDP Policy Informative Central Beds Local Plan In accordance with Article 35 (1) of the Town and Country Planning (Development Management Procedure) (England) Order 2015, the reason for any condition above relates to the Policies as referred to in the Central Bedfordshire Local Plan and the National Planning Policy Framework (NPPF).GDP Policy Informative Central Beds Local Plan In accordance with Article 35 (1) of the Town and Country Planning (Development Management Procedure) (England) Order 2015, the reason for any condition above relates to the Policies as referred to in the Central Bedfordshire Local Plan and the National Planning Policy Framework (NPPF).
2 )This permission relates only to that required under the Town & Country Planning Acts and does not include any consent or approval under any other enactment or under the Building Regulations. Any other consent or approval which is necessary must be obtained from the appropriate authority.This permission relates only to that required under the Town & Country Planning Acts and does not include any consent or approval under any other enactment or under the Building Regulations. Any other consent or approval which is necessary must be obtained from the appropriate authority.
3 )The Sustainable Statement submitted as part of this application states that a septic tank will be implemented, located in the front garden. However, this has not been indicated on the proposed plans and as such, cannot be considered as part of this application. The applicant is advised that planning permission could be required for the installation of a septic tank.The Sustainable Statement submitted as part of this application states that a septic tank will be implemented, located in the front garden. However, this has not been indicated on the proposed plans and as such, cannot be considered as part of this application. The applicant is advised that planning permission could be required for the installation of a septic tank.
4 )The applicant is reminded that Hyde Public Bridleway No.6 is not to be obstructed with contruction vehicles, or materials, at any time during the development phase.The applicant is reminded that Hyde Public Bridleway No.6 is not to be obstructed with contruction vehicles, or materials, at any time during the development phase.
5 )The applicant is advised where roofing work or timber treatment is to be undertaken it is the legal responsibility of the contractor to check for bats. If bats are found during the course of any work to buildings or trees where not previously anticipated, then works should immediately stop and Natural England notified for appropriate advice.The applicant is advised where roofing work or timber treatment is to be undertaken it is the legal responsibility of the contractor to check for bats. If bats are found during the course of any work to buildings or trees where not previously anticipated, then works should immediately stop and Natural England notified for appropriate advice.
6 )In respect of Policy CC8 of the Local Plan, the applicant is advised that they must satisfy themselves that the land is suitable for development.In respect of Policy CC8 of the Local Plan, the applicant is advised that they must satisfy themselves that the land is suitable for development.
7 )The applicant is advised that parking for contractor's vehicles and the storage of materials associated with this development should take place within the site and not extend into within the public highway without authorisation from the highway authority. If necessary the applicant is advised to contact The Street Works Co-ordinator, Central Bedfordshire Highways, by contacting the Highways Helpdesk 0300 300 8301. Under the provisions of the Highways Act 1980 the developer may be liable for any damage caused to the public highway as a result of demolition/construction of the development hereby approvedThe applicant is advised that parking for contractor's vehicles and the storage of materials associated with this development should take place within the site and not extend into within the public highway without authorisation from the highway authority. If necessary the applicant is advised to contact The Street Works Co-ordinator, Central Bedfordshire Highways, by contacting the Highways Helpdesk 0300 300 8301. Under the provisions of the Highways Act 1980 the developer may be liable for any damage caused to the public highway as a result of demolition/construction of the development hereby approved
8 )The contractor and / or client are to ensure that any mud or building material debris such as sand, cement or concrete that is left on the public highway, or any mud arising from construction/demolition vehicular movement, shall be removed immediately and in the case of concrete, cement, mud or mortar not allowed to dry on the highway.The contractor and / or client are to ensure that any mud or building material debris such as sand, cement or concrete that is left on the public highway, or any mud arising from construction/demolition vehicular movement, shall be removed immediately and in the case of concrete, cement, mud or mortar not allowed to dry on the highway.
Appeal Received Date:This case has no appeals against it
Planning Obligation Status:Not available