| Informative Notes: | | 1
)Trees
Although not required to facilitate development, it is advised that the restorative pruning of the Crack Willow trees occupying the southern boundary of the site are entered into a regime of pollarding managment, undertaken in accordance with Section 2.3 'Pruning Works' (Table 2) of the supporting document 'Arboricultural Method Statement' dated August 2025 (Document Ref. 12237_AMS.001 Rev A), as prepared by Aspect Arboriculture. This is to improve the compatibility of these trees with their proposed setting, and to mitigate for their poor structural conditionTrees
Although not required to facilitate development, it is advised that the restorative pruning of the Crack Willow trees occupying the southern boundary of the site are entered into a regime of pollarding managment, undertaken in accordance with Section 2.3 'Pruning Works' (Table 2) of the supporting document 'Arboricultural Method Statement' dated August 2025 (Document Ref. 12237_AMS.001 Rev A), as prepared by Aspect Arboriculture. This is to improve the compatibility of these trees with their proposed setting, and to mitigate for their poor structural condition |
| 2
)Highways
The applicant is advised that if it is the intention to request Central Bedfordshire Council as Local Highway Authority to adopt the proposed highways within the site as maintainable at the public expense then details of the specification, layout and alignment, width and levels of the said highways together with all the necessary highway and drainage arrangements, including run off calculations shall be submitted to the Highways Agreements Officer, Highways Contract Team, Community Services, Central Bedfordshire Council, Priory House, Monks Walk, Chicksands, Shefford SG17 5TQ.
The applicant is advised that the requirements of the New Roads and Street Works Act 1991 will apply to any works undertaken within the limits of the existing public highway. Further details can be obtained by contacting The Street Works Co-ordinator, Central Bedfordshire Highways, by contacting the Highways Helpdesk 0300 300 8301
The applicant is advised that parking for contractor's vehicles and the storage of materials and deliveries associated with this development should take place within the site and not extend into within the public highway without authorisation from the highway authority. If necessary, the applicant is advised to contact The Street Works Co-ordinator, Central Bedfordshire Highways, by contacting the Highways Helpdesk 0300 300 8301. Under the provisions of the Highways Act 1980 the developer may be liable for any damage caused to the public highway as a result of demolition/construction of the development hereby
approved.
The applicant is advised that no private surface water drainage system designed as part of a new development will be allowed to enter any existing highway surface water drainage system.Highways
The applicant is advised that if it is the intention to request Central Bedfordshire Council as Local Highway Authority to adopt the proposed highways within the site as maintainable at the public expense then details of the specification, layout and alignment, width and levels of the said highways together with all the necessary highway and drainage arrangements, including run off calculations shall be submitted to the Highways Agreements Officer, Highways Contract Team, Community Services, Central Bedfordshire Council, Priory House, Monks Walk, Chicksands, Shefford SG17 5TQ.
The applicant is advised that the requirements of the New Roads and Street Works Act 1991 will apply to any works undertaken within the limits of the existing public highway. Further details can be obtained by contacting The Street Works Co-ordinator, Central Bedfordshire Highways, by contacting the Highways Helpdesk 0300 300 8301
The applicant is advised that parking for contractor's vehicles and the storage of materials and deliveries associated with this development should take place within the site and not extend into within the public highway without authorisation from the highway authority. If necessary, the applicant is advised to contact The Street Works Co-ordinator, Central Bedfordshire Highways, by contacting the Highways Helpdesk 0300 300 8301. Under the provisions of the Highways Act 1980 the developer may be liable for any damage caused to the public highway as a result of demolition/construction of the development hereby
approved.
The applicant is advised that no private surface water drainage system designed as part of a new development will be allowed to enter any existing highway surface water drainage system. |
|
|---|