1. Return to Search Page >>2. Search Results >>3. Planning Application Detail
Details of Planning Application - CB/25/02063/FULL

Click on the Consultation link below for neighbour and statutory consultee information and to comment on this application. Ensure your opinions are received before the consultation closing date.


Application Details View Documents (opens in new window) Consultation
Application registeredConsultation periodAwaiting decisionDecidedAppealAppeal decided
Application Type:Full Application
Date Received:26 / 06 / 2025
Registration (Validation) Date:16 / 07 / 2025
Consultation Start Date:16 / 07 / 2025
Earliest Decision Date (Consultation Period Expires):22 / 09 / 2025
Target Date for Decision:10 / 09 / 2025
Location:Shelton Farm, Lower Shelton Road, Marston Moreteyne, MK43 0LP
Parish Name:Marston Moreteyne
Conservation Area:Not available
Listed Building Grade:Not available
Environmental Assessment:Not available
Expected Decision Level:Not available
Description:Erection of a pair of semi-detached houses.
Case Officer:Benjamin Keen
Case Officer Tel:0300 300 5642
Case Officer Email:benjamin.keen@centralbedfordshire.gov.uk
Status:Decided
Agent:Mr K Janes
21 Hurst Road
Twyford
Reading
Berkshire
RG10 0AG
Press Date:01 / 08 / 2025
Site Notice Date:22 / 07 / 2025
NeighboursResponses Received: 1
and Representatives:In Favour: 0
Representation DetailsAgainst: 0
Comments: 1
Petitions Against: 0
Petitions For: 0
Officer Site Visit Date:22/07/2025
Committee Site Visit Date:No date
Committee Meeting Date:No date
Decision Level:Officer Delegated
Date Decision Made:19 / 09 / 2025
Date Decision Despatched:19 / 09 / 2025
Decision:Full Application - Granted
Conditions or Reasons:View Conditions or Reasons
Informative Notes:
1 )GDP Policy Informative Central Beds Local Plan In accordance with Article 35 (1) of the Town and Country Planning (Development Management Procedure) (England) Order 2015, the reason for any condition above relates to the Policies as referred to in the Central Bedfordshire Local Plan and the National Planning Policy Framework (NPPF).GDP Policy Informative Central Beds Local Plan In accordance with Article 35 (1) of the Town and Country Planning (Development Management Procedure) (England) Order 2015, the reason for any condition above relates to the Policies as referred to in the Central Bedfordshire Local Plan and the National Planning Policy Framework (NPPF).
2 )This permission relates only to that required under the Town & Country Planning Acts and does not include any consent or approval under any other enactment or under the Building Regulations. Any other consent or approval which is necessary must be obtained from the appropriate authority.This permission relates only to that required under the Town & Country Planning Acts and does not include any consent or approval under any other enactment or under the Building Regulations. Any other consent or approval which is necessary must be obtained from the appropriate authority.
3 )You are advised to note the comments of the CBC SuDS Officer in relation to condition 6 as set out below: Under Central Bedfordshire Council and IDB bylaws, any watercourse within or adjoining the site boundary will maintain a 9m development free easement (on the development side), unless otherwise agreed with the relevant drainage authority. This applies to all watercourses, where water is present for all or some of the year, including those not clearly stated on mapping, topography or planning documents. Permeable block paving should be laid to CIRIA C768 'Guidance on the construction of SuDS' guidelines. This guidance also stipulates following Interlay guidance. The Council does not, and is not required to, adopt any SuDS feature. It is the responsibility of the applicant to ensure that the surface water drainage system, in its entirety, will be effectively maintained in the long-term. We therefore expect confirmation of the proposed arrangements for maintenance to be provided with the final detailed design, including the future maintenance and operational needs and the responsible bodies for undertaking maintenance (for all public and private drainage components). The final detailed design including proposed standards of operation, construction, structural integrity and ongoing maintenance must be compliant with the 'Non-statutory technical standards for sustainable drainage systems' (March 2015, Ref: PB14308), 'Central Bedfordshire Sustainable Drainage Guidance' (Adopted April 2014, Updated May 2015), and recognised best practise including the Ciria SuDS Manual (2016, C753). Land drainage Consent under the Land Drainage Act 1991 must be secured to discharge surface water to an existing watercourse/ditch, and details of this provided with the full detailed design. An easement should be provided on the developable side of the watercourse to allow for access for maintenance, this should be 9m but may depend on the maintenance requirements considered appropriate.You are advised to note the comments of the CBC SuDS Officer in relation to condition 6 as set out below: Under Central Bedfordshire Council and IDB bylaws, any watercourse within or adjoining the site boundary will maintain a 9m development free easement (on the development side), unless otherwise agreed with the relevant drainage authority. This applies to all watercourses, where water is present for all or some of the year, including those not clearly stated on mapping, topography or planning documents. Permeable block paving should be laid to CIRIA C768 'Guidance on the construction of SuDS' guidelines. This guidance also stipulates following Interlay guidance. The Council does not, and is not required to, adopt any SuDS feature. It is the responsibility of the applicant to ensure that the surface water drainage system, in its entirety, will be effectively maintained in the long-term. We therefore expect confirmation of the proposed arrangements for maintenance to be provided with the final detailed design, including the future maintenance and operational needs and the responsible bodies for undertaking maintenance (for all public and private drainage components). The final detailed design including proposed standards of operation, construction, structural integrity and ongoing maintenance must be compliant with the 'Non-statutory technical standards for sustainable drainage systems' (March 2015, Ref: PB14308), 'Central Bedfordshire Sustainable Drainage Guidance' (Adopted April 2014, Updated May 2015), and recognised best practise including the Ciria SuDS Manual (2016, C753). Land drainage Consent under the Land Drainage Act 1991 must be secured to discharge surface water to an existing watercourse/ditch, and details of this provided with the full detailed design. An easement should be provided on the developable side of the watercourse to allow for access for maintenance, this should be 9m but may depend on the maintenance requirements considered appropriate.
4 )You are reminded that the land is covered by a S106 legal agreement attached to planning permission CB/16/05797/OUT which requires the provision of affordable housing through a commuted sum and review mechanism.You are reminded that the land is covered by a S106 legal agreement attached to planning permission CB/16/05797/OUT which requires the provision of affordable housing through a commuted sum and review mechanism.
5 )It is noted that than an existing footpath within the Council's mapping system runs through this site. The applicant is reminded that in order to resolve this a public path diversion order would need to be applied for and to contact the Definitive Map team: Definitivemap@centralbedfordshire.gov.uk . This would prevent the footpath from showing on future searches.It is noted that than an existing footpath within the Council's mapping system runs through this site. The applicant is reminded that in order to resolve this a public path diversion order would need to be applied for and to contact the Definitive Map team: Definitivemap@centralbedfordshire.gov.uk . This would prevent the footpath from showing on future searches.
Appeal Received Date:This case has no appeals against it
Planning Obligation Status:Not available

Return to Search PageTop of Page