1. Return to Search Page >>2. Search Results >>3. Planning Application Detail
Details of Planning Application - CB/25/02801/VOC

Click on the Consultation link below for neighbour and statutory consultee information and to comment on this application. Ensure your opinions are received before the consultation closing date.


Application Details View Documents (opens in new window) Consultation
Application registeredConsultation periodAwaiting decisionDecidedAppealAppeal decided
Application Type:Variation of Condition
Date Received:03 / 09 / 2025
Registration (Validation) Date:22 / 09 / 2025
Consultation Start Date:22 / 09 / 2025
Earliest Decision Date (Consultation Period Expires):31 / 10 / 2025
Target Date for Decision:17 / 11 / 2025
Location:32 High Street, Shefford, SG17 5DG
Parish Name:Shefford
Conservation Area:Shefford
Listed Building Grade:Ecclesiastical Two
Environmental Assessment:Not available
Expected Decision Level:Not available
Description:Variation of condition number 11 of planning permission CB/24/02783/FULL (Part conversion and extension to ground floor to create one dwelling to the rear with a bin and cycle store to the front. Erection of a detached second dwelling to the rear with solar panels to the roof) Variation to remove approved drawings 104B, 107B and 108C replace with references 2501-PL-01, 2501-PL-02, 2501-PL-03, 2501-PL-04 and 2501-DE-02B Flat 2
Case Officer:Charlie Keen
Case Officer Tel:0300 300 4086
Case Officer Email:charlie.keen@centralbedfordshire.gov.uk
Status:Decided
Agent:Mr M Knight
Maple House
18 Dartmouth Road
Olney
MK46 4BH
Press Date:10 / 10 / 2025
Site Notice Date:09 / 10 / 2025
NeighboursResponses Received: 0
and Representatives:In Favour: 0
Representation DetailsAgainst: 0
Comments: 0
Petitions Against: 0
Petitions For: 0
Officer Site Visit Date:09/10/2025
Committee Site Visit Date:No date
Committee Meeting Date:No date
Decision Level:Officer Delegated
Date Decision Made:12 / 11 / 2025
Date Decision Despatched:12 / 11 / 2025
Decision:Variation of Condition - Granted
Conditions or Reasons:View Conditions or Reasons
Informative Notes:
1 )GDP Policy Informative Central Beds Local Plan In accordance with Article 35 (1) of the Town and Country Planning (Development Management Procedure) (England) Order 2015, the reason for any condition above relates to the Policies as referred to in the Central Bedfordshire Local Plan and the National Planning Policy Framework (NPPF).GDP Policy Informative Central Beds Local Plan In accordance with Article 35 (1) of the Town and Country Planning (Development Management Procedure) (England) Order 2015, the reason for any condition above relates to the Policies as referred to in the Central Bedfordshire Local Plan and the National Planning Policy Framework (NPPF).
2 )The applicant is advised that parking for contractor's vehicles and the storage of materials associated with this development should take place within the site and not extend into within the public highway without authorisation from the highway authority. If necessary, the applicant is advised to contact Central Bedfordshire Council's Highway Help Desk on 03003008049. Under the provisions of the Highways Act 1980 the developer may be liable for any damage caused to the public highway as a result of construction of the development hereby approvedThe applicant is advised that parking for contractor's vehicles and the storage of materials associated with this development should take place within the site and not extend into within the public highway without authorisation from the highway authority. If necessary, the applicant is advised to contact Central Bedfordshire Council's Highway Help Desk on 03003008049. Under the provisions of the Highways Act 1980 the developer may be liable for any damage caused to the public highway as a result of construction of the development hereby approved
3 )This permission relates only to that required under the Town & Country Planning Acts and does not include any consent or approval under any other enactment or under the Building Regulations. Any other consent or approval which is necessary must be obtained from the appropriate authority.This permission relates only to that required under the Town & Country Planning Acts and does not include any consent or approval under any other enactment or under the Building Regulations. Any other consent or approval which is necessary must be obtained from the appropriate authority.
4 )A European Protected Species Licence (EPSL) is required prior to commencement of works as the proposed works would block an entrance to the existing day roost. This will need to be obtained from Natural England once planning permission has been granted.A European Protected Species Licence (EPSL) is required prior to commencement of works as the proposed works would block an entrance to the existing day roost. This will need to be obtained from Natural England once planning permission has been granted.
Appeal Received Date:This case has no appeals against it
Planning Obligation Status:Not available

Return to Search PageTop of Page