1. Return to Search Page >>2. Search Results >>3. Planning Application Detail
Details of Planning Application - CB/25/03843/FULL

Click on the Consultation link below for neighbour and statutory consultee information and to comment on this application. Ensure your opinions are received before the consultation closing date.


Application Details View Documents (opens in new window) Consultation
Application registeredConsultation periodAwaiting decisionDecidedAppealAppeal decided
Application Type:Full Application
Date Received:03 / 12 / 2025
Registration (Validation) Date:02 / 01 / 2026
Consultation Start Date:02 / 01 / 2026
Earliest Decision Date (Consultation Period Expires):07 / 05 / 2026
Target Date for Decision:27 / 02 / 2026
Location:Memorial Hall, Church Street, Tempsford, Sandy, SG19 2AW
Parish Name:Tempsford
Conservation Area:Not available
Listed Building Grade:Not available
Environmental Assessment:Not available
Expected Decision Level:Not available
Description:Erection of a side extension with roof lights and additional parking
Case Officer:Nicola Stevens
Case Officer Tel:0300 300 4454
Case Officer Email:nicola.stevens@centralbedfordshire.gov.uk
Status:Decided
Agent:Mr Stephen Connell
Stannard Way
Bedford
MK44 3RZ
Press Date:No date
Site Notice Date:21 / 01 / 2026
NeighboursResponses Received: 43
and Representatives:In Favour: 42
Representation DetailsAgainst: 1
Comments: 0
Petitions Against: 0
Petitions For: 0
Officer Site Visit Date:21/01/2026
Committee Site Visit Date:No date
Committee Meeting Date:No date
Decision Level:Officer Delegated
Date Decision Made:02 / 06 / 2026
Date Decision Despatched:03 / 06 / 2026
Decision:Full Application - Granted
Conditions or Reasons:View Conditions or Reasons
Informative Notes:
1 )GDP Policy Informative Central Beds Local Plan In accordance with Article 35 (1) of the Town and Country Planning (Development Management Procedure) (England) Order 2015, the reason for any condition above relates to the Policies as referred to in the Central Bedfordshire Local Plan and the National Planning Policy Framework (NPPF).GDP Policy Informative Central Beds Local Plan In accordance with Article 35 (1) of the Town and Country Planning (Development Management Procedure) (England) Order 2015, the reason for any condition above relates to the Policies as referred to in the Central Bedfordshire Local Plan and the National Planning Policy Framework (NPPF).
2 )This permission relates only to that required under the Town & Country Planning Acts and does not include any consent or approval under any other enactment or under the Building Regulations. Any other consent or approval which is necessary must be obtained from the appropriate authority.This permission relates only to that required under the Town & Country Planning Acts and does not include any consent or approval under any other enactment or under the Building Regulations. Any other consent or approval which is necessary must be obtained from the appropriate authority.
3 )You are advised to note the comments of the SuDs team regarding condition 8 as set out below. Surface water drainage must follow the SuDS National Standards; National standards for sustainable drainage systems (SuDS) - GOV.UK We will require a full set of calculations for each phase and in total, providing evidence of all surface water retained on site for the 1 in 100 (+40%CC). Any exceedance should be shown with pathways, depths and velocity. We will require full drainage drawings showing all connections, control features, storage, inverts etc. and how it communicates with the development wide scheme. We will require BRE365 infiltration test results There should be a minimum 1m between the base of a soakage unit and the seasonal water table. Any watercourses (this includes culverted) within or adjacent to the site should be included in the maintenance and management plan, even if there is no discharge to them. This would be a riparian ownership issue but leaving it as such is no longer acceptable. The connection of private surface water drainage systems to a highway system is not permitted. Permeable block paving should be laid to CIRIA C768 'Guidance on the construction of SuDS' guidelines. This guidance also stipulates following Interlay guidance. The Council is not required to adopt any SuDS feature, this subject to agreements. It is the responsibility of the applicant to ensure that the surface water drainage system, in its entirety, will be effectively maintained in the long-term. We therefore expect confirmation of the proposed arrangements for maintenance to be provided with the final detailed design, including the future maintenance and operational needs and the responsible bodies for undertaking maintenance (for all public and private drainage components). The final detailed design including proposed standards of operation, construction, structural integrity and ongoing maintenance must be compliant with the 'Non-statutory technical standards for sustainable drainage (March 2015, Ref: PB14308), 'Central Bedfordshire Sustainable Drainage Guidance' (Adopted April 2014, Updated May 2015), and recognised best practise including the Ciria SuDS Manual (2016, C753). Land drainage Consent under the Land Drainage Act 1991 must be secured to discharge surface water to an existing watercourse/ditch, and details of this provided with the full detailed design. An easement should be provided on the developable side of the watercourse to allow for access for maintenance, this should be 9m but may depend on the maintenance requirements considered appropriate.You are advised to note the comments of the SuDs team regarding condition 8 as set out below. Surface water drainage must follow the SuDS National Standards; National standards for sustainable drainage systems (SuDS) - GOV.UK We will require a full set of calculations for each phase and in total, providing evidence of all surface water retained on site for the 1 in 100 (+40%CC). Any exceedance should be shown with pathways, depths and velocity. We will require full drainage drawings showing all connections, control features, storage, inverts etc. and how it communicates with the development wide scheme. We will require BRE365 infiltration test results There should be a minimum 1m between the base of a soakage unit and the seasonal water table. Any watercourses (this includes culverted) within or adjacent to the site should be included in the maintenance and management plan, even if there is no discharge to them. This would be a riparian ownership issue but leaving it as such is no longer acceptable. The connection of private surface water drainage systems to a highway system is not permitted. Permeable block paving should be laid to CIRIA C768 'Guidance on the construction of SuDS' guidelines. This guidance also stipulates following Interlay guidance. The Council is not required to adopt any SuDS feature, this subject to agreements. It is the responsibility of the applicant to ensure that the surface water drainage system, in its entirety, will be effectively maintained in the long-term. We therefore expect confirmation of the proposed arrangements for maintenance to be provided with the final detailed design, including the future maintenance and operational needs and the responsible bodies for undertaking maintenance (for all public and private drainage components). The final detailed design including proposed standards of operation, construction, structural integrity and ongoing maintenance must be compliant with the 'Non-statutory technical standards for sustainable drainage (March 2015, Ref: PB14308), 'Central Bedfordshire Sustainable Drainage Guidance' (Adopted April 2014, Updated May 2015), and recognised best practise including the Ciria SuDS Manual (2016, C753). Land drainage Consent under the Land Drainage Act 1991 must be secured to discharge surface water to an existing watercourse/ditch, and details of this provided with the full detailed design. An easement should be provided on the developable side of the watercourse to allow for access for maintenance, this should be 9m but may depend on the maintenance requirements considered appropriate.
4 ) NOTES TO APPLICANT The applicant is advised that no private surface water drainage system designed as part of a new development, will be allowed to enter any existing highway surface water drainage system. The applicant is advised that the requirements of the New Roads and Street Works Act 1991 will apply to any works undertaken within the limits of the existing public highway. Further details can be obtained by contacting The Street Works Co-ordinator, Central Bedfordshire Highways, by contacting the Highways Helpdesk 0300 300 8301 or e-mail: streetworks@centralbedfordshire.gov.uk The applicant is advised that parking for contractor's vehicles and the storage of materials and deliveries associated with this development should take place within the site and not extend into within the public highway without authorisation from the highway authority. If necessary the applicant is advised to contact The Street Works Co-ordinator, Central Bedfordshire Highways, by contacting the Highways Helpdesk 0300 300 8301. Under the provisions of the Highways Act 1980 the developer may be liable for any damage caused to the public highway as a result of demolition/construction of the development hereby approved The contractor and / or client are to ensure that any mud or building material debris such as sand, cement or concrete that is left on the public highway, or any mud arising from construction/demolition vehicular movement, shall be removed immediately and in the case of concrete, cement, mud or mortar not allowed to dry on the highway The applicant is advised that all cycle parking to be provided within the site shall be designed in accordance with the Central Bedfordshire Council's : Parking standards for new developments Supplementary Planning Document (SPD) | Central Bedfordshire Council NOTES TO APPLICANT The applicant is advised that no private surface water drainage system designed as part of a new development, will be allowed to enter any existing highway surface water drainage system. The applicant is advised that the requirements of the New Roads and Street Works Act 1991 will apply to any works undertaken within the limits of the existing public highway. Further details can be obtained by contacting The Street Works Co-ordinator, Central Bedfordshire Highways, by contacting the Highways Helpdesk 0300 300 8301 or e-mail: streetworks@centralbedfordshire.gov.uk The applicant is advised that parking for contractor's vehicles and the storage of materials and deliveries associated with this development should take place within the site and not extend into within the public highway without authorisation from the highway authority. If necessary the applicant is advised to contact The Street Works Co-ordinator, Central Bedfordshire Highways, by contacting the Highways Helpdesk 0300 300 8301. Under the provisions of the Highways Act 1980 the developer may be liable for any damage caused to the public highway as a result of demolition/construction of the development hereby approved The contractor and / or client are to ensure that any mud or building material debris such as sand, cement or concrete that is left on the public highway, or any mud arising from construction/demolition vehicular movement, shall be removed immediately and in the case of concrete, cement, mud or mortar not allowed to dry on the highway The applicant is advised that all cycle parking to be provided within the site shall be designed in accordance with the Central Bedfordshire Council's : Parking standards for new developments Supplementary Planning Document (SPD) | Central Bedfordshire Council
5 )The applicants attention is drawn to their responsibility under The Equality Act 2010 and with particular regard to access arrangements for the disabled. The Equality Act 2010 requires that service providers must think ahead and make reasonable adjustments to address barriers that impede disabled people. These requirements are as follows: Where a provision, criterion or practice puts disabled people at a substantial disadvantage to take reasonable steps to avoid that disadvantage; Where a physical feature puts disabled people at a substantial disadvantage to avoid that disadvantage or adopt a reasonable alternative method of providing the service or exercising the function; Where not providing an auxiliary aid puts disabled people at a substantial disadvantage to provide that auxiliary aid. In doing this, it is a good idea to consider the range of disabilities that your actual or potential service users might have. You should not wait until a disabled person experiences difficulties using a service, as this may make it too late to make the necessary adjustment. For further information on disability access contact: The Centre for Accessible Environments (www.cae.org.uk) AdviceCentral@drcbeds.org.ukThe applicants attention is drawn to their responsibility under The Equality Act 2010 and with particular regard to access arrangements for the disabled. The Equality Act 2010 requires that service providers must think ahead and make reasonable adjustments to address barriers that impede disabled people. These requirements are as follows: Where a provision, criterion or practice puts disabled people at a substantial disadvantage to take reasonable steps to avoid that disadvantage; Where a physical feature puts disabled people at a substantial disadvantage to avoid that disadvantage or adopt a reasonable alternative method of providing the service or exercising the function; Where not providing an auxiliary aid puts disabled people at a substantial disadvantage to provide that auxiliary aid. In doing this, it is a good idea to consider the range of disabilities that your actual or potential service users might have. You should not wait until a disabled person experiences difficulties using a service, as this may make it too late to make the necessary adjustment. For further information on disability access contact: The Centre for Accessible Environments (www.cae.org.uk) AdviceCentral@drcbeds.org.uk
6 )The applicant is advised to avoid the bird nesting season (March to August). If this cannot be avoided, then the site should be checked for nesting birds by a suitably qualified ecologist prior to any site clearance (including vegetation clearance) taking place. If an occupied nest is found onsite, then an exclusion zone around the nest would be required and maintained until the nest is no longer in use.The applicant is advised to avoid the bird nesting season (March to August). If this cannot be avoided, then the site should be checked for nesting birds by a suitably qualified ecologist prior to any site clearance (including vegetation clearance) taking place. If an occupied nest is found onsite, then an exclusion zone around the nest would be required and maintained until the nest is no longer in use.
7 )Any conditions in bold must be discharged before the development commences. Failure to comply with this requirement could invalidate this permission and/or result in enforcement action.Any conditions in bold must be discharged before the development commences. Failure to comply with this requirement could invalidate this permission and/or result in enforcement action.
Appeal Received Date:This case has no appeals against it
Planning Obligation Status:Not available

Return to Search PageTop of Page