1. Return to Search Page >>2. Search Results >>3. Planning Application Detail
Details of Planning Application - CB/26/00324/FULL

Click on the Consultation link below for neighbour and statutory consultee information and to comment on this application. Ensure your opinions are received before the consultation closing date.


Application Details View Documents (opens in new window) Consultation
Application registeredConsultation periodAwaiting decisionDecidedAppealAppeal decided
Application Type:Full Application
Date Received:03 / 02 / 2026
Registration (Validation) Date:25 / 02 / 2026
Consultation Start Date:25 / 02 / 2026
Earliest Decision Date (Consultation Period Expires):06 / 05 / 2026
Target Date for Decision:22 / 04 / 2026
Location:7 Broad Rush Green, Linslade, Leighton Buzzard, LU7 2XA
Parish Name:Leighton-Linslade
Conservation Area:Not available
Listed Building Grade:Not available
Environmental Assessment:Not available
Expected Decision Level:Not available
Description:Erection of a two-storey side extension and single storey rear extension with roof light, extension to basement and creation of undercroft
Case Officer:Grace Howard
Case Officer Tel:0300 300 6692
Case Officer Email:Grace.Howard@centralbedfordshire.gov.uk
Status:Decided
Agent:Not available
Press Date:No date
Site Notice Date:13 / 03 / 2026
NeighboursResponses Received: 3
and Representatives:In Favour: 0
Representation DetailsAgainst: 2
Comments: 1
Petitions Against: 0
Petitions For: 0
Officer Site Visit Date:13/03/2026
Committee Site Visit Date:No date
Committee Meeting Date:No date
Decision Level:Officer Delegated
Date Decision Made:21 / 05 / 2026
Date Decision Despatched:21 / 05 / 2026
Decision:Full Application - Granted
Conditions or Reasons:View Conditions or Reasons
Informative Notes:
1 )GDP Policy Informative Central Beds Local Plan In accordance with Article 35 (1) of the Town and Country Planning (Development Management Procedure) (England) Order 2015, the reason for any condition above relates to the Policies as referred to in the Central Bedfordshire Local Plan and the National Planning Policy Framework (NPPF).GDP Policy Informative Central Beds Local Plan In accordance with Article 35 (1) of the Town and Country Planning (Development Management Procedure) (England) Order 2015, the reason for any condition above relates to the Policies as referred to in the Central Bedfordshire Local Plan and the National Planning Policy Framework (NPPF).
2 )This permission relates only to that required under the Town & Country Planning Acts and does not include any consent or approval under any other enactment or under the Building Regulations. Any other consent or approval which is necessary must be obtained from the appropriate authority.This permission relates only to that required under the Town & Country Planning Acts and does not include any consent or approval under any other enactment or under the Building Regulations. Any other consent or approval which is necessary must be obtained from the appropriate authority.
3 )Please note that the unnumbered drawings submitted in connection with this application have been given unique numbers by the Local Planning Authority. The numbers can be sourced by examining the plans on the View a Planning Application pages of the Councils website www.centralbedfordshire.gov.uk.Please note that the unnumbered drawings submitted in connection with this application have been given unique numbers by the Local Planning Authority. The numbers can be sourced by examining the plans on the View a Planning Application pages of the Councils website www.centralbedfordshire.gov.uk.
4 )Will a new extension affect your Council Tax Charge? The rate of Council Tax you pay depends on which valuation band your home is placed in. This is determined by the market value of your home as at 1 April 1991. Your property's Council Tax band may change if the property is extended.  The Council Tax band will only change when a relevant transaction takes place. For example, if you sell your property after extending it, the new owner may have to pay a higher band of Council Tax. If however you add an annexe to your property, the Valuation Office Agency may decide that the annexe should be banded separately for Council Tax.  If this happens, you will have to start paying Council Tax for the annexe as soon as it is completed. If the annexe is occupied by a relative of the residents of the main dwelling, it may qualify for a Council Tax discount or exemption.  Contact the Council for advice on 0300 300 8306. The website link is: https://www.centralbedfordshire.gov.uk/council-tax-bandsWill a new extension affect your Council Tax Charge? The rate of Council Tax you pay depends on which valuation band your home is placed in. This is determined by the market value of your home as at 1 April 1991. Your property's Council Tax band may change if the property is extended.  The Council Tax band will only change when a relevant transaction takes place. For example, if you sell your property after extending it, the new owner may have to pay a higher band of Council Tax. If however you add an annexe to your property, the Valuation Office Agency may decide that the annexe should be banded separately for Council Tax.  If this happens, you will have to start paying Council Tax for the annexe as soon as it is completed. If the annexe is occupied by a relative of the residents of the main dwelling, it may qualify for a Council Tax discount or exemption.  Contact the Council for advice on 0300 300 8306. The website link is: https://www.centralbedfordshire.gov.uk/council-tax-bands
5 )Measurements to railway tracks and railway boundary When designing proposals, the developer and council are advised, that any measurements must be taken from the operational railway / Network Rail boundary and not from the railway tracks themselves. From the existing railway tracks to the Network Rail boundary, the land will include critical infrastructure (e.g. cables, signals, overhead lines, communication equipment etc) and boundary treatments (including support zones, vegetation) which might be adversely impacted by outside party proposals unless the necessary asset protection measures are undertaken. No proposal should increase Network Rail's liability. To ensure the safe operation and integrity of the railway, Network Rail issues advice on planning applications and requests conditions to protect the railway and its boundary. Obligations Properties adjoining or in the vicinity of the railway are frequently the subject of obligations, rights, exceptions and reservations for the benefit of Network Rail's land and railway. The applicant must review the title to their property to see whether any such obligations etc exist and ensure that there is no non-compliance or breaches of them or any interference with or obstruction of Network Rail's rights and reservations. If the proposed development would not comply with or would breach any of the terms of the conveyance, the developer must revise his proposals. RAMS The developer is to submit directly to Network Rail asset protection, a Risk Assessment and Method Statement (RAMS) for all works to be undertaken within 10m of the operational railway under Construction (Design and Management) Regulations, and this is in addition to any planning consent. Network Rail would need to be re-assured the works on site follow safe methods of working and have also taken into consideration any potential impact on Network Rail land and the existing operational railway infrastructure. Builder to ensure that no dust or debris is allowed to contaminate Network Rail land as the outside party would be liable for any clean-up costs. Review and agreement of the RAMS will be undertaken between Network Rail and the applicant/developer. Encroachment The developer/applicant must ensure that their proposal, both during construction, and after completion of works on site, does not affect the safety, operation or integrity of the operational railway, Network Rail land and its infrastructure or undermine or damage or adversely affect any railway land and structures. - There must be no physical encroachment of the proposal onto Network Rail land, no over-sailing into Network Rail air-space and no encroachment of foundations onto Network Rail land or under the Network Rail boundary. - All buildings and structures on site including all foundations / fencing foundations must be constructed wholly within the applicant's land ownership footprint. - Buildings, windows and structures must not over-sail Network Rail air-space/boundary. - Any future maintenance must be conducted solely within the applicant's land ownership. - Rainwater goods must not discharge towards or over the railway boundary - Should the applicant require access to Network Rail land to facilitate their proposal they would need to approach the Network Rail Asset Protection Team at least 20 weeks before any works are due to commence on site. The applicant would be liable for all costs incurred in facilitating the proposal and 3 an asset protection agreement may be necessary to undertake works. Network Rail reserves the right to refuse any works by an outside party that may adversely impact its land and infrastructure. - Any unauthorised access to Network Rail air-space or land will be deemed an act of trespass. Scaffolding Scaffolding which is to be constructed within 10 metres of the Network Rail / railway boundary must be erected in such a manner that at no time will any poles over-sail the railway and protective netting around such scaffolding must be installed. The applicant / applicant's contractor must consider if they can undertake the works and associated scaffolding / access for working at height within the footprint of their land ownership boundary. The applicant is reminded that when pole(s) are erected for construction or maintenance works, they must have a minimum 3m failsafe zone between the maximum height of the pole(s) and the railway boundary. This is to ensure that the safety of the railway is preserved, and that scaffolding does not: - Fall into the path of on-coming trains - Fall onto and damage critical and safety related lineside equipment and infrastructure - Fall onto overhead lines bringing them down, resulting in serious safety issues (this is applicable if the proposal is above the railway and where the line is electrified). Network Rail would request a condition is applied as follows within the planning consent: Drainage proposals and Network Rail land The applicant must ensure that the proposal drainage does not increase Network Rail's liability, or cause flooding pollution or soil slippage, vegetation or boundary issues on railway land. Therefore, the proposed drainage on site will include the following: - All surface waters and foul waters must drain away from the direction of the railway boundary. - Soakaways for the proposal must be placed at least 30m from the railway boundary. - Any drainage proposals for less than 30m from the railway boundary must ensure that surface and foul waters are carried from site in closed sealed pipe systems. Excavation and Earthworks and Network Rail land: The applicant will agree all excavation and earthworks within 10m of the railway boundary with Network Rail. Network Rail will need to review and agree the works to determine if they impact upon the support zone of our land and infrastructure as well as determining relative levels in relation to the railway. Network Rail would need to agree the following: - Alterations to ground levels - De-watering works - Ground stabilisation works - Works to retaining walls - Construction and temporary works - Maintenance of retaining walls - Ground investigation works must not be undertaken unless agreed with Network Rail. - Confirmation of retaining wall works (either Network Rail and/or the applicant). Prior to the commencement of works on site the applicant must confirm with Network Rail if there are any retaining walls/structures and the applicant must interface with Network Rail to ensure that no retaining structures are impacted on a permanent basis by their proposal. - Alterations in loading within 15m of the railway boundary must be agreed with Network Rail. - For works next to a cutng or at the toe of an embankment the developer / applicant would be required to undertake a slope stability review. Network Rail would need to re view and agree the methods of construction works on site to ensure that there is no impact upon critical railway infrastructure. No excavation works are to commence without agreement from Network Rail. The council are advised that the impact of outside party excavation and earthworks can be different depending on the geography and soil in the area. The council and developer are also advised that support zones for railway infrastructure may extend 4beyond the railway boundary and into the proposal area. Therefore, consultation with Network Rail is requested. Any right of support must be maintained by the developer. Demolition Any demolition works on site must be carried out so that they do not endanger the safe operation of the railway, or the stability of the adjoining Network Rail structures and land. The demolition of the existing building(s), due to its close proximity to the Network Rail boundary, must be carried out in accordance with an agreed method statement. Review of the method statement will be undertaken by the Network Rail Asset Protection Engineer before the development and any demolition works on site can commence. Network Rail would like to add that the applicant is strongly recommended to employ companies to demolish buildings / structures belonging to the National Federation of Demolition Contractors. This will ensure that all demolition works are carried out to professional standards and the company itself will also include liability insurance as part of its service. Basement / Deep Excavation Works Where basement or deep excavations are proposed adjacent to the railway Network Rail review and agreement of documents as well as supervision & an interface with Asset Protection are required. - Excavations ASPRO would require to review (including but not limited to); - Earthworks RAMS - Scale section drawing and plan showing dimensions of basement, proximity dimensions from basement to the operational rail boundary fence and depth - And if earth works battered back as above dimensions from rail boundary fence - Advise if the basement excavation will be inside the track support zone envelope - Temporary works earthworks support including RAMS and temporary works design - Design to include:- demonstration that the temporary works and permanent construction will not import increased risk to the operational railway both during construction and in the long term - Calculations, G.I. strata and design check certs, CEM and CRE design CVs and appointment forms - Lifting plans (lifting e.g. temporary works support structure components in to place) - Designed working platforms - De-watering method - Dust control Lighting To ensure the ongoing safety of the operational railway the applicant's lighting design must demonstrate no overspill of light onto Network Rail land. Lighting close to or adjacent to the railway boundary must not impact train driver's ability to perceive signals and therefore all column lighting is recommended to be: - White LED - Flat bottom luminaires - Downlit throw lighting - Lighting to be directed away from the railway boundary - Avoid the use of flashing lights or screens as part of developments - Avoid lighting of Green, Yellow and Red. Access to Railway All roads, paths, boundaries or ways providing access to any part of the railway undertaker's land both temporary and permanent, must remain open and unblocked (24/7, 365 around the clock) both during construction works and as a permanent arrangement. 5 - The proposal must not encroach onto any Network Rail access road, paths or ways of access to any part of Network Rail land. This also includes emergency vehicles ability to access and exit Network Rail land. - The proposal construction works must not prevent Network Rail from accessing its land. Boundary treatments Any structures on the applicant's land which runs seamlessly into a section of Network Rail infrastructure will require Network Rail agreement/comments and interface/supervision to ensure that there is no impact to or increase in risk to Network Rail assets. 3m Gap Network Rail REQUIRES that the developer includes a minimum 3 metres gap between the buildings and structures on site and the railway boundary. Less than 3m from the railway boundary to the edge of structures could result in construction and future maintenance works being undertaken on Network Rail land, and close to the railway boundary potentially impacting support zones or lineside cabling. All the works undertaken to facilitate the design and layout of the proposal should be undertaken wholly within the applicant's land ownership footprint including all foundation works. Network Rail requires a minimum 3m easement between structures on site and the railway boundary to ensure that we can maintain and renew our boundary treatments. No part of the structure should over-sail the railway boundary or discharge rainwater goods onto or toward the railway boundary. Trees Proposals for the site should take into account the recommendations of, 'BS 5837:2012 Trees in Relation to Design, Demolition and Construction', which needs to be applied to prevent long term damage to the health of trees on Network Rail land so that they do not become a risk to members of the public in the future. This document will be provided via the formal interface with Network Rail Asset Protection. BAPA (Basic Asset Protection Agreement) As the proposal includes works which could impact the existing operational railway and in order to facilitate the above, a BAPA (Basic Asset Protection Agreement) will need to be agreed between the developer and Network Rail. The developer will be liable for all costs incurred by Network Rail in facilitating this proposal, including any railway site safety costs, possession costs, asset protection costs / presence, site visits, review and agreement of proposal documents and any buried services searches. The BAPA will be in addition to any planning consent. Going forward in order for Network Rail to spend any time reviewing any submissions, provision of any asset information, attending any further meetings, assisting with discharging any planning conditions set etc, Network Rail will require the return of a signed BAPA (Basic Asset Protection Agreement) and relevant payment/ PO as noted in the estimate sent. Network Rail is a publicly funded entity and all outside party works, which these are, are cost recoverable as dictated to us by the ORR. The local planning authority (LPA) are not responsible for the safe operaOon of the railway or our assets and the issues raised by the developer/applicant will ulOmately need to be agreed by Network Rail engineering to ensure the proposed development does not interfere with the safety of the railway.Measurements to railway tracks and railway boundary When designing proposals, the developer and council are advised, that any measurements must be taken from the operational railway / Network Rail boundary and not from the railway tracks themselves. From the existing railway tracks to the Network Rail boundary, the land will include critical infrastructure (e.g. cables, signals, overhead lines, communication equipment etc) and boundary treatments (including support zones, vegetation) which might be adversely impacted by outside party proposals unless the necessary asset protection measures are undertaken. No proposal should increase Network Rail's liability. To ensure the safe operation and integrity of the railway, Network Rail issues advice on planning applications and requests conditions to protect the railway and its boundary. Obligations Properties adjoining or in the vicinity of the railway are frequently the subject of obligations, rights, exceptions and reservations for the benefit of Network Rail's land and railway. The applicant must review the title to their property to see whether any such obligations etc exist and ensure that there is no non-compliance or breaches of them or any interference with or obstruction of Network Rail's rights and reservations. If the proposed development would not comply with or would breach any of the terms of the conveyance, the developer must revise his proposals. RAMS The developer is to submit directly to Network Rail asset protection, a Risk Assessment and Method Statement (RAMS) for all works to be undertaken within 10m of the operational railway under Construction (Design and Management) Regulations, and this is in addition to any planning consent. Network Rail would need to be re-assured the works on site follow safe methods of working and have also taken into consideration any potential impact on Network Rail land and the existing operational railway infrastructure. Builder to ensure that no dust or debris is allowed to contaminate Network Rail land as the outside party would be liable for any clean-up costs. Review and agreement of the RAMS will be undertaken between Network Rail and the applicant/developer. Encroachment The developer/applicant must ensure that their proposal, both during construction, and after completion of works on site, does not affect the safety, operation or integrity of the operational railway, Network Rail land and its infrastructure or undermine or damage or adversely affect any railway land and structures. - There must be no physical encroachment of the proposal onto Network Rail land, no over-sailing into Network Rail air-space and no encroachment of foundations onto Network Rail land or under the Network Rail boundary. - All buildings and structures on site including all foundations / fencing foundations must be constructed wholly within the applicant's land ownership footprint. - Buildings, windows and structures must not over-sail Network Rail air-space/boundary. - Any future maintenance must be conducted solely within the applicant's land ownership. - Rainwater goods must not discharge towards or over the railway boundary - Should the applicant require access to Network Rail land to facilitate their proposal they would need to approach the Network Rail Asset Protection Team at least 20 weeks before any works are due to commence on site. The applicant would be liable for all costs incurred in facilitating the proposal and 3 an asset protection agreement may be necessary to undertake works. Network Rail reserves the right to refuse any works by an outside party that may adversely impact its land and infrastructure. - Any unauthorised access to Network Rail air-space or land will be deemed an act of trespass. Scaffolding Scaffolding which is to be constructed within 10 metres of the Network Rail / railway boundary must be erected in such a manner that at no time will any poles over-sail the railway and protective netting around such scaffolding must be installed. The applicant / applicant's contractor must consider if they can undertake the works and associated scaffolding / access for working at height within the footprint of their land ownership boundary. The applicant is reminded that when pole(s) are erected for construction or maintenance works, they must have a minimum 3m failsafe zone between the maximum height of the pole(s) and the railway boundary. This is to ensure that the safety of the railway is preserved, and that scaffolding does not: - Fall into the path of on-coming trains - Fall onto and damage critical and safety related lineside equipment and infrastructure - Fall onto overhead lines bringing them down, resulting in serious safety issues (this is applicable if the proposal is above the railway and where the line is electrified). Network Rail would request a condition is applied as follows within the planning consent: Drainage proposals and Network Rail land The applicant must ensure that the proposal drainage does not increase Network Rail's liability, or cause flooding pollution or soil slippage, vegetation or boundary issues on railway land. Therefore, the proposed drainage on site will include the following: - All surface waters and foul waters must drain away from the direction of the railway boundary. - Soakaways for the proposal must be placed at least 30m from the railway boundary. - Any drainage proposals for less than 30m from the railway boundary must ensure that surface and foul waters are carried from site in closed sealed pipe systems. Excavation and Earthworks and Network Rail land: The applicant will agree all excavation and earthworks within 10m of the railway boundary with Network Rail. Network Rail will need to review and agree the works to determine if they impact upon the support zone of our land and infrastructure as well as determining relative levels in relation to the railway. Network Rail would need to agree the following: - Alterations to ground levels - De-watering works - Ground stabilisation works - Works to retaining walls - Construction and temporary works - Maintenance of retaining walls - Ground investigation works must not be undertaken unless agreed with Network Rail. - Confirmation of retaining wall works (either Network Rail and/or the applicant). Prior to the commencement of works on site the applicant must confirm with Network Rail if there are any retaining walls/structures and the applicant must interface with Network Rail to ensure that no retaining structures are impacted on a permanent basis by their proposal. - Alterations in loading within 15m of the railway boundary must be agreed with Network Rail. - For works next to a cutng or at the toe of an embankment the developer / applicant would be required to undertake a slope stability review. Network Rail would need to re view and agree the methods of construction works on site to ensure that there is no impact upon critical railway infrastructure. No excavation works are to commence without agreement from Network Rail. The council are advised that the impact of outside party excavation and earthworks can be different depending on the geography and soil in the area. The council and developer are also advised that support zones for railway infrastructure may extend 4beyond the railway boundary and into the proposal area. Therefore, consultation with Network Rail is requested. Any right of support must be maintained by the developer. Demolition Any demolition works on site must be carried out so that they do not endanger the safe operation of the railway, or the stability of the adjoining Network Rail structures and land. The demolition of the existing building(s), due to its close proximity to the Network Rail boundary, must be carried out in accordance with an agreed method statement. Review of the method statement will be undertaken by the Network Rail Asset Protection Engineer before the development and any demolition works on site can commence. Network Rail would like to add that the applicant is strongly recommended to employ companies to demolish buildings / structures belonging to the National Federation of Demolition Contractors. This will ensure that all demolition works are carried out to professional standards and the company itself will also include liability insurance as part of its service. Basement / Deep Excavation Works Where basement or deep excavations are proposed adjacent to the railway Network Rail review and agreement of documents as well as supervision & an interface with Asset Protection are required. - Excavations ASPRO would require to review (including but not limited to); - Earthworks RAMS - Scale section drawing and plan showing dimensions of basement, proximity dimensions from basement to the operational rail boundary fence and depth - And if earth works battered back as above dimensions from rail boundary fence - Advise if the basement excavation will be inside the track support zone envelope - Temporary works earthworks support including RAMS and temporary works design - Design to include:- demonstration that the temporary works and permanent construction will not import increased risk to the operational railway both during construction and in the long term - Calculations, G.I. strata and design check certs, CEM and CRE design CVs and appointment forms - Lifting plans (lifting e.g. temporary works support structure components in to place) - Designed working platforms - De-watering method - Dust control Lighting To ensure the ongoing safety of the operational railway the applicant's lighting design must demonstrate no overspill of light onto Network Rail land. Lighting close to or adjacent to the railway boundary must not impact train driver's ability to perceive signals and therefore all column lighting is recommended to be: - White LED - Flat bottom luminaires - Downlit throw lighting - Lighting to be directed away from the railway boundary - Avoid the use of flashing lights or screens as part of developments - Avoid lighting of Green, Yellow and Red. Access to Railway All roads, paths, boundaries or ways providing access to any part of the railway undertaker's land both temporary and permanent, must remain open and unblocked (24/7, 365 around the clock) both during construction works and as a permanent arrangement. 5 - The proposal must not encroach onto any Network Rail access road, paths or ways of access to any part of Network Rail land. This also includes emergency vehicles ability to access and exit Network Rail land. - The proposal construction works must not prevent Network Rail from accessing its land. Boundary treatments Any structures on the applicant's land which runs seamlessly into a section of Network Rail infrastructure will require Network Rail agreement/comments and interface/supervision to ensure that there is no impact to or increase in risk to Network Rail assets. 3m Gap Network Rail REQUIRES that the developer includes a minimum 3 metres gap between the buildings and structures on site and the railway boundary. Less than 3m from the railway boundary to the edge of structures could result in construction and future maintenance works being undertaken on Network Rail land, and close to the railway boundary potentially impacting support zones or lineside cabling. All the works undertaken to facilitate the design and layout of the proposal should be undertaken wholly within the applicant's land ownership footprint including all foundation works. Network Rail requires a minimum 3m easement between structures on site and the railway boundary to ensure that we can maintain and renew our boundary treatments. No part of the structure should over-sail the railway boundary or discharge rainwater goods onto or toward the railway boundary. Trees Proposals for the site should take into account the recommendations of, 'BS 5837:2012 Trees in Relation to Design, Demolition and Construction', which needs to be applied to prevent long term damage to the health of trees on Network Rail land so that they do not become a risk to members of the public in the future. This document will be provided via the formal interface with Network Rail Asset Protection. BAPA (Basic Asset Protection Agreement) As the proposal includes works which could impact the existing operational railway and in order to facilitate the above, a BAPA (Basic Asset Protection Agreement) will need to be agreed between the developer and Network Rail. The developer will be liable for all costs incurred by Network Rail in facilitating this proposal, including any railway site safety costs, possession costs, asset protection costs / presence, site visits, review and agreement of proposal documents and any buried services searches. The BAPA will be in addition to any planning consent. Going forward in order for Network Rail to spend any time reviewing any submissions, provision of any asset information, attending any further meetings, assisting with discharging any planning conditions set etc, Network Rail will require the return of a signed BAPA (Basic Asset Protection Agreement) and relevant payment/ PO as noted in the estimate sent. Network Rail is a publicly funded entity and all outside party works, which these are, are cost recoverable as dictated to us by the ORR. The local planning authority (LPA) are not responsible for the safe operaOon of the railway or our assets and the issues raised by the developer/applicant will ulOmately need to be agreed by Network Rail engineering to ensure the proposed development does not interfere with the safety of the railway.
Appeal Received Date:This case has no appeals against it
Planning Obligation Status:Not available

Return to Search PageTop of Page