<< Back to case
Conditions or Reasons for Planning Application - CB/11/02917/FULL
Conditions or Reasons:
1) The development hereby approved shall be commenced within three years of the date of this permission.

Reason: To comply with Section 91 of the Town and Country Planning Act 1990 which is designed to ensure that a planning permission does not continue in existence indefinitely if the development to which it relates is not carried out.
2) Prior to the commencement of development, details and samples of materials to be used for the external finishes of the development hereby approved shall be submitted to and approved in writing by the Local Planning Authority and the development shall be carried out in accordance therewith.

Reason: To safeguard the appearance of the completed development by ensuring that the development hereby permitted is finished externally with materials to match/complement the existing building(s) and the visual amenities of the locality.
3) Prior to the development hereby approved commencing, on site details of the final ground and slab levels of the dwellings hereby approved shall be submitted to and approved in writing by the Local Planning Authority. Such details shall include sections through both the site and the adjoining properties, the location of which shall first be agreed in writing with the Local Planning Authority. Thereafter the site shall be developed in full accordance with the approved details.

Reason: To ensure that a satisfactory relationship results between the new development and adjacent buildings and public areas.
4) Before the accesses are brought into use an area of land across the whole of the site frontage measuring at least 2.4m from and parallel to
the nearside edge of the adjacent road carriageway shall be provided and thereafter be kept free of all obstruction to visibility.

Reason: To provide adequate visibility between the existing highway and the proposed accesses and to make the accesses safe and convenient for the traffic that is likely to use them.
5) The proposed vehicular accesses shall be constructed and surfaced in accordance with details to be approved in writing by the Local
Planning Authority for a distance of 5m into the site, measured from the highway boundary, before the premises are occupied.
Arrangement shall be made for surface water drainage from the site to be intercepted and disposed of separately so that it does not
discharge into the highway.

Reason: To avoid the carriage of mud or other extraneous material or surface water from the site into the highway so as to safeguard the interest of the highway.
6) Any gates provided shall open away from the highway and be set back a distance of at least 7.0 metres from the nearside edge of the
carriageway of the adjoining highway.

Reason: To enable vehicles to draw off and stand clear of the highway before the gates are opened.
7) Before the premises are occupied all on site vehicular areas shall be surfaced in a manner to the Local Planning Authority's approval so as
to ensure satisfactory parking of vehicles outside highway limits. Arrangements shall be made for surface water from the site to be
intercepted and disposed of separately so that it does not discharge into the highway.

Reason: In order to minimise danger, obstruction, and inconvenience to users of the highway and of the premises.
8) Development shall not commence until a scheme detailing access provision to and from the site for construction traffic, which
details shall show what arrangements will be made for restricting such vehicles to approved points of access and egress, and an
area for construction workers parking for the duration of the construction period, has been submitted to and approved in writing
by the Local Planning Authority. The scheme shall be operated throughout the period of construction work.

Reason: To ensure the safe operation of the surrounding road network in the interests of road safety.
9) Full details of both hard and soft landscaping shall be submitted to and approved in writing by the Local Planning Authority. These details shall include:-

materials to be used for any hard surfacing;
planting plans, including schedule of size, species, positions, density and times of planting;
cultivation details including operations required to establish new planting;
details of existing trees and hedgerows on the site, indicating those to be retained and the method of their protection during development works.

The development shall be carried out in accordance with the approved details.

Reason: In order to ensure that the landscaping is carried out within a reasonable period in the interest of the visual amenities of the area.
10) Prior to the first occupation of the building, the first floor, ensuite window in the west, rear elevation of Plot 2 hereby approved, shall be fitted with obscured glass of a type to substantially restrict vision through it at all times.

Reason: To safeguard the amenities of occupiers of adjoining properties.
11) Notwithstanding any provision of the Town and Country Planning (General Permitted Development Order) 1995 (or any Order revoking or re-enacting that Order with or without modification) no works shall be commenced for extensions or alterations, including new windows, and structures within the residential curtilage of the approved new dwelling until detailed plans and elevations which form a valid planning application have been submitted to and approved in writing by the Local Planning Authority.

Reason: To protect the amenities of occupiers of neighbouring properties.
12) Prior to the commencement of any phase of development approved by this planning permission the developer shall submit to the Planning Authority, in both paper and electronic form where possible :
a) A Phase 1 Desk Study incorporating a site walkover, site history, maps and all further features of industry best practice relating to potential contamination.
b) Where shown to be necessary by the Phase 1 Desk Study, a Phase 2 Site Investigation report further documenting the ground conditions of the site with regard to potential contamination, incorporating appropriate soils and gas sampling.
c) Where shown necessary by the Phase 2 investigation, a Phase 3 detailed scheme for remedial works and measures to be taken to mitigate any risks to human health, groundwater and the wider environment.
d) On completion of the development, the developer shall provide written confirmation that any and all works have been completed in accordance with the agreed remediation scheme in the form of a Phase 4 validation report to incorporate photographs, material transport tickets and sampling.
Any remediation scheme shall be agreed in writing by the local planning authority prior to the commencement of works.
Any remediation scheme and any variations shall be agreed in writing by the local planning authority prior to the commencement of works. This should include responses to any unexpected contamination discovered during works. The British Standard for Topsoil, BS 3882:2007, specifies requirements for topsoils that are moved or traded and should be adhered to.
Applicants are reminded that, should groundwater or surface water courses be at risk of contamination during or after development, the Environment Agency at Brampton should be approached for approval of measures to protect water resources separately, unless an Agency condition already forms part of this permission.
Reason: To protect human health and the environment.
12) Prior to the commencement of any phase of development approved by this planning permission the developer shall submit to the Planning Authority, in both paper and electronic form where possible :
a) A Phase 1 Desk Study incorporating a site walkover, site history, maps and all further features of industry best practice relating to potential contamination.
b) Where shown to be necessary by the Phase 1 Desk Study, a Phase 2 Site Investigation report further documenting the ground conditions of the site with regard to potential contamination, incorporating appropriate soils and gas sampling.
c) Where shown necessary by the Phase 2 investigation, a Phase 3 detailed scheme for remedial works and measures to be taken to mitigate any risks to human health, groundwater and the wider environment.
d) On completion of the development, the developer shall provide written confirmation that any and all works have been completed in accordance with the agreed remediation scheme in the form of a Phase 4 validation report to incorporate photographs, material transport tickets and sampling.
Any remediation scheme shall be agreed in writing by the local planning authority prior to the commencement of works.
Any remediation scheme and any variations shall be agreed in writing by the local planning authority prior to the commencement of works. This should include responses to any unexpected contamination discovered during works. The British Standard for Topsoil, BS 3882:2007, specifies requirements for topsoils that are moved or traded and should be adhered to.
Applicants are reminded that, should groundwater or surface water courses be at risk of contamination during or after development, the Environment Agency at Brampton should be approached for approval of measures to protect water resources separately, unless an Agency condition already forms part of this permission.
Reason: To protect human health and the environment.
12) Prior to the commencement of any phase of development approved by this planning permission the developer shall submit to the Planning Authority, in both paper and electronic form where possible :
a) A Phase 1 Desk Study incorporating a site walkover, site history, maps and all further features of industry best practice relating to potential contamination.
b) Where shown to be necessary by the Phase 1 Desk Study, a Phase 2 Site Investigation report further documenting the ground conditions of the site with regard to potential contamination, incorporating appropriate soils and gas sampling.
c) Where shown necessary by the Phase 2 investigation, a Phase 3 detailed scheme for remedial works and measures to be taken to mitigate any risks to human health, groundwater and the wider environment.
d) On completion of the development, the developer shall provide written confirmation that any and all works have been completed in accordance with the agreed remediation scheme in the form of a Phase 4 validation report to incorporate photographs, material transport tickets and sampling.
Any remediation scheme shall be agreed in writing by the local planning authority prior to the commencement of works.
Any remediation scheme and any variations shall be agreed in writing by the local planning authority prior to the commencement of works. This should include responses to any unexpected contamination discovered during works. The British Standard for Topsoil, BS 3882:2007, specifies requirements for topsoils that are moved or traded and should be adhered to.
Applicants are reminded that, should groundwater or surface water courses be at risk of contamination during or after development, the Environment Agency at Brampton should be approached for approval of measures to protect water resources separately, unless an Agency condition already forms part of this permission.
Reason: To protect human health and the environment.
13) The development hereby permitted shall not be carried out except in complete accordance with the details shown on the submitted plans, numbers: 101 A; 102 A; 103 A; 104 A; Construction Waste & Recycling Statement, Sherwood Architects, September 2011.

Reason: For the avoidance of doubt.


Return to Search | Close WindowTop of Page