Conditions or Reasons for Planning Application - CB/24/00850/DOC
Conditions or Reasons:
2) The development hereby permitted shall not begin until a scheme to deal with contamination of land/ground gas/controlled waters has been submitted to and approved in writing by the local planning authority. The scheme shall include all of the following measures, unless the local planning authority dispenses with any such requirement specifically in writing:
1. A Phase II intrusive investigation report detailing all investigative works and sampling on site, together with the results of the analysis, undertaken in accordance with LCRM. The report shall include a detailed quantitative human health and environmental risk assessment.
2. A remediation scheme detailing how the remediation will be undertaken, what methods will be used and what is to be achieved. A clear end point of the remediation shall be stated, and how this will be validated. Any ongoing monitoring shall also be determined.
3. If during the works contamination is encountered which has not previously been identified, then the additional contamination shall be fully assessed in an appropriate remediation scheme which shall be submitted to and approved in writing by the local planning authority.
4. A validation report detailing the proposed remediation works and quality assurance certificates to show that the works have been carried out in full accordance with the approved methodology shall be submitted prior to first occupation of the development. Details of any post-remedial sampling and analysis to demonstrate that the site has achieved the required clean-up criteria shall be included, together with the necessary documentation detailing what waste materials have been removed from the site.

Reason: These matters are required prior to commencement in order to minimise and prevent pollution of the land and the water environment and in order to protect human health and the environment, in accordance with Policy CC8 of the Central Bedfordshire Local Plan (2021)
3) No development above ground floor slab level shall take place until a scheme for protecting the proposed dwelling from any noise arising from the adjacent school/nursery has been submitted to and approved in writing by the local planning authority. The scheme shall be supported and informed by an appropriate noise impact assessment carried out in accordance with relevant technical standards. The dwelling shall not be occupied until such a scheme has been implemented in accordance with the approved details and it shall be retained in accordance with those details thereafter.

Reason:To ensure suitable living conditions and amenity levels for future occupiers of the proposed development, in accordance with Policy CC8 of the Central Bedfordshire Local Plan (2021).