Details of Planning Application - CB/21/00178/FULL

Click on the Consultation link below for neighbour and statutory consultee information and to comment on this application. Ensure your opinions are received before the consultation closing date.


Application Details View Documents (opens in new window) Consultation
Application registeredConsultation periodAwaiting decisionDecidedAppealAppeal decided
Application Type:Full Application
Date Received:18 / 01 / 2021
Registration (Validation) Date:19 / 01 / 2021
Consultation Start Date:19 / 01 / 2021
Earliest Decision Date (Consultation Period Expires):18 / 05 / 2021
Target Date for Decision:20 / 04 / 2021
Location:Land at Billington Road, Leighton Buzzard, LU7 9HH
Parish Name:Leighton-Linslade
Conservation Area:Not available
Listed Building Grade:Not available
Environmental Assessment:Not available
Expected Decision Level:Not available
Description:Re-Submission of planning permission CB/20/01358/Full (Construction of 27 No. 2-bed flats and all ancillary works)
Case Officer:Peter Vosper
Case Officer Tel:0300 300 4157
Case Officer Email:peter.vosper@centralbedfordshire.gov.uk
Status:Decided
Agent:Mr R C Harrington
12 Church Square
Leighton Buzzard
Beds
LU7 1AE
Press Date:26 / 01 / 2021
Site Notice Date:29 / 01 / 2021
NeighboursResponses Received: 2
and Representatives:In Favour: 0
Representation DetailsAgainst: 1
Comments: 1
Petitions Against: 0
Petitions For: 0
Officer Site Visit Date:29/01/2021
Committee Site Visit Date:No date
Committee Meeting Date:02 / 06 / 2021
Decision Level:Development Management Committee
Date Decision Made:10 / 01 / 2022
Date Decision Despatched:10 / 01 / 2022
Decision:Full Application - Granted
Conditions or Reasons:View Conditions or Reasons
Informative Notes:
1 )In accordance with Article 35 (1) of the Town and Country Planning (Development Management Procedure) (England) Order 2015, the reason for any condition above relates to the Policies as referred to in the South Bedfordshire Local Plan Review (SBLPR) and the National Planning Policy Framework (NPPF).In accordance with Article 35 (1) of the Town and Country Planning (Development Management Procedure) (England) Order 2015, the reason for any condition above relates to the Policies as referred to in the South Bedfordshire Local Plan Review (SBLPR) and the National Planning Policy Framework (NPPF).
2 )This permission relates only to that required under the Town & Country Planning Acts and does not include any consent or approval under any other enactment or under the Building Regulations. Any other consent or approval which is necessary must be obtained from the appropriate authority.This permission relates only to that required under the Town & Country Planning Acts and does not include any consent or approval under any other enactment or under the Building Regulations. Any other consent or approval which is necessary must be obtained from the appropriate authority.
3 )The applicant is advised that the requirements of the New Roads and Street Works Act 1991 will apply to any works undertaken within the limits of the existing public highway. Further details can be obtained from the Central Bedfordshire Council's Highway Help Desk, P.O.Box 1395, Bedford, MK42 5AN.The applicant is advised that the requirements of the New Roads and Street Works Act 1991 will apply to any works undertaken within the limits of the existing public highway. Further details can be obtained from the Central Bedfordshire Council's Highway Help Desk, P.O.Box 1395, Bedford, MK42 5AN.
4 )The applicant is advised that if it is the intention to request the Central Bedfordshire County Council as Local Highway Authority, to adopt the proposed highways as maintainable at the public expense then details of the specification, layout and alignment, width and levels of the said highways together with all the necessary highway and drainage arrangements, including run off calculations shall be submitted to the Development Planning and Control Group, Central Bedfordshire Council's Highway Help Desk, P.O.Box 1395, Bedford, MK42 5AN. No development shall commence until the details have been approved in writing and an Agreement made under Section 38 of the Highways Act 1980 is in place.The applicant is advised that if it is the intention to request the Central Bedfordshire County Council as Local Highway Authority, to adopt the proposed highways as maintainable at the public expense then details of the specification, layout and alignment, width and levels of the said highways together with all the necessary highway and drainage arrangements, including run off calculations shall be submitted to the Development Planning and Control Group, Central Bedfordshire Council's Highway Help Desk, P.O.Box 1395, Bedford, MK42 5AN. No development shall commence until the details have been approved in writing and an Agreement made under Section 38 of the Highways Act 1980 is in place.
5 )The applicant is advised that in order to comply with Condition 7 of this permission it will be necessary for the developer of the site to enter into an agreement with Central Bedfordshire Council as Highway Authority under Section 278 of the Highways Act 1980 to ensure the satisfactory completion of the access and associated road improvements. You are advised to contact the Highways Agreements Officer, Community Services, Central Bedfordshire Council, Priory House, Monks Walk, Chicksands, Shefford SG17 5TQ. E-mail highwaysagreements@centralbedfordshire.gov.ukThe applicant is advised that in order to comply with Condition 7 of this permission it will be necessary for the developer of the site to enter into an agreement with Central Bedfordshire Council as Highway Authority under Section 278 of the Highways Act 1980 to ensure the satisfactory completion of the access and associated road improvements. You are advised to contact the Highways Agreements Officer, Community Services, Central Bedfordshire Council, Priory House, Monks Walk, Chicksands, Shefford SG17 5TQ. E-mail highwaysagreements@centralbedfordshire.gov.uk
6 )All roads to be constructed within the site shall be designed in accordance with Central Bedfordshire Council's publication 'Highway Construction Standards & Specifications Guidance, Central Bedfordshire Council' and the Department of the Environment/Department of Transport's 'Manual for Streets'.All roads to be constructed within the site shall be designed in accordance with Central Bedfordshire Council's publication 'Highway Construction Standards & Specifications Guidance, Central Bedfordshire Council' and the Department of the Environment/Department of Transport's 'Manual for Streets'.
7 )When submitting details to discharge condition 16, the following points 1, 2, 3 and 6 shall be addressed: 1. Culverting of existing watercourses will not be permitted. A foot bridge noted on plans, this should be clear span and design agreed with IDB. 2. No raising of levels, due to landscaping, within flood zones is allowed. There is a small area of surface water flood risk associated with the existing watercourse. 3. Any watercourses within or adjacent to the site should be included in the maintenance and management plan, even if there is no discharge to them. This would be a riparian ownership issue but leaving it as such is no longer acceptable. 4. The Council does not, and is not required to, adopt any SuDS feature. It is the responsibility of the applicant to ensure that the surface water drainage system, in its entirety, will be effectively maintained in the long-term. We therefore expect confirmation of the proposed arrangements for maintenance to be provided with the final detailed design, including the future maintenance and operational needs and the responsible bodies for undertaking maintenance (for all public and private drainage components). 5. The final detailed design including proposed standards of operation, construction, structural integrity and ongoing maintenance must be compliant with the 'Non-statutory technical standards for sustainable drainage systems' (March 2015, Ref: PB14308), 'Central Bedfordshire Sustainable Drainage Guidance' (Adopted April 2014, Updated May 2015), and recognised best practise including the Ciria SuDS Manual (2016, C753). 6. Land Drainage Consent under the Land Drainage Act 1991 must be secured to discharge surface water to an existing watercourse/ditch, and details of this provided with the full detailed design. An easement should be provided on the developable side of the watercourse to allow for access for maintenance, this should be 9m but may depend on the maintenance requirements considered appropriate.When submitting details to discharge condition 16, the following points 1, 2, 3 and 6 shall be addressed: 1. Culverting of existing watercourses will not be permitted. A foot bridge noted on plans, this should be clear span and design agreed with IDB. 2. No raising of levels, due to landscaping, within flood zones is allowed. There is a small area of surface water flood risk associated with the existing watercourse. 3. Any watercourses within or adjacent to the site should be included in the maintenance and management plan, even if there is no discharge to them. This would be a riparian ownership issue but leaving it as such is no longer acceptable. 4. The Council does not, and is not required to, adopt any SuDS feature. It is the responsibility of the applicant to ensure that the surface water drainage system, in its entirety, will be effectively maintained in the long-term. We therefore expect confirmation of the proposed arrangements for maintenance to be provided with the final detailed design, including the future maintenance and operational needs and the responsible bodies for undertaking maintenance (for all public and private drainage components). 5. The final detailed design including proposed standards of operation, construction, structural integrity and ongoing maintenance must be compliant with the 'Non-statutory technical standards for sustainable drainage systems' (March 2015, Ref: PB14308), 'Central Bedfordshire Sustainable Drainage Guidance' (Adopted April 2014, Updated May 2015), and recognised best practise including the Ciria SuDS Manual (2016, C753). 6. Land Drainage Consent under the Land Drainage Act 1991 must be secured to discharge surface water to an existing watercourse/ditch, and details of this provided with the full detailed design. An easement should be provided on the developable side of the watercourse to allow for access for maintenance, this should be 9m but may depend on the maintenance requirements considered appropriate.
8 )The applicant is advised to note the comments of Anglian Water in their Report of 26 January 2021.The applicant is advised to note the comments of Anglian Water in their Report of 26 January 2021.
Appeal Received Date:This case has no appeals against it
Planning Obligation Status:Not available