1. Return to Search Page >>2. Search Results >>3. Planning Application Detail
Details of Planning Application - CB/22/00588/OUT

Click on the Consultation link below for neighbour and statutory consultee information and to comment on this application. Ensure your opinions are received before the consultation closing date.


Application Details View Documents (opens in new window) Consultation
Application registeredConsultation periodAwaiting decisionDecidedAppealAppeal decided
Application Type:Outline Application
Date Received:14 / 02 / 2022
Registration (Validation) Date:22 / 02 / 2022
Consultation Start Date:22 / 02 / 2022
Earliest Decision Date (Consultation Period Expires):17 / 01 / 2023
Target Date for Decision:24 / 05 / 2022
Location:Land to the rear of 29-33 Clophill Road, Maulden
Parish Name:Maulden
Conservation Area:Not available
Listed Building Grade:Not available
Environmental Assessment:Not available
Expected Decision Level:Not available
Description:Outline Application: Development comprising demolition of existing commercial building and erection of up to 30 dwellings, together with all ancillary works. All matters reserved except access.
Case Officer:Janine Richardson
Case Officer Tel:0300 300 6983
Case Officer Email:janine.richardson@centralbedfordshire.gov.uk
Status:Decided
Agent:Miss V Gordon
Fort Dunlop
Fort Parkway
Birmingham
B24 9FD
Press Date:11 / 03 / 2022
Site Notice Date:09 / 03 / 2022
NeighboursResponses Received: 30
and Representatives:In Favour: 0
Representation DetailsAgainst: 30
Comments: 0
Petitions Against: 0
Petitions For: 0
Officer Site Visit Date:09/03/2022
Committee Site Visit Date:No date
Committee Meeting Date:25 / 01 / 2023
Decision Level:Development Management Committee
Date Decision Made:25 / 01 / 2023
Date Decision Despatched:11 / 12 / 2023
Decision:Outline Application - Granted
Conditions or Reasons:View Conditions or Reasons
Informative Notes:
1 )The applicant is advised that in order to comply with Conditions 9 and 10 of this permission it will be necessary for the developer of the site to enter into an agreement with Central Bedfordshire Council as Highway Authority under Section 278 of the Highways Act 1980 to ensure the satisfactory completion of the access and associated road improvements. Further details can be obtained from the Highways Agreements Officer, Highways Contract Team, Community Services, Central Bedfordshire Council, Priory House, Monks Walk, Chicksands, Shefford SG17 5TQThe applicant is advised that in order to comply with Conditions 9 and 10 of this permission it will be necessary for the developer of the site to enter into an agreement with Central Bedfordshire Council as Highway Authority under Section 278 of the Highways Act 1980 to ensure the satisfactory completion of the access and associated road improvements. Further details can be obtained from the Highways Agreements Officer, Highways Contract Team, Community Services, Central Bedfordshire Council, Priory House, Monks Walk, Chicksands, Shefford SG17 5TQ
2 )The applicant is advised of the following from Anglian Water: Anglian Water has assets close to or crossing this site or there are assets subject to an adoption agreement. Therefore the site layout should take this into account and accommodate those assets within either prospectively adoptable highways or public open space. If this is not practicable then the sewers will need to be diverted at the developers cost under Section 185 of the Water Industry Act 1991. or, in the case of apparatus under an adoption agreement, liaise with the owners of the apparatus. It should be noted that the diversion works should normally be completed before development can commence. Notification of intention to connect to the public sewer under S106 of the Water Industry Act Approval and consent will be required by Anglian Water, under the Water Industry Act 1991. Contact Development Services Team 0345 606 6087. (2) INFORMATIVE - Notification of intention to connect to the public sewer under S106 of the Water Industry Act Approval and consent will be required by Anglian Water, under the Water Industry Act 1991. Contact Development Services Team 0345 606 6087. Protection of existing assets - A public sewer is shown on record plans within the land identified for the proposed development. It appears that development proposals will affect existing public sewers. It is recommended that the applicant contacts Anglian Water Development Services Team for further advice on this matter. Building over existing public sewers will not be permitted (without agreement) from Anglian Water. Building near to a public sewer - No building will be permitted within the statutory easement width of 3 metres from the pipeline without agreement from Anglian Water. Please contact Development Services Team on 0345 606 6087. The developer should note that the site drainage details submitted have not been approved for the purposes of adoption. If the developer wishes to have the sewers included in a sewer adoption agreement with Anglian Water (under Sections 104 of the Water Industry Act 1991), they should contact our Development Services Team on 0345 606 6087 at the earliest opportunity. Sewers intended for adoption should be designed and constructed in accordance with Sewers for Adoption guide for developers, as supplemented by Anglian requirements.The applicant is advised of the following from Anglian Water: Anglian Water has assets close to or crossing this site or there are assets subject to an adoption agreement. Therefore the site layout should take this into account and accommodate those assets within either prospectively adoptable highways or public open space. If this is not practicable then the sewers will need to be diverted at the developers cost under Section 185 of the Water Industry Act 1991. or, in the case of apparatus under an adoption agreement, liaise with the owners of the apparatus. It should be noted that the diversion works should normally be completed before development can commence. Notification of intention to connect to the public sewer under S106 of the Water Industry Act Approval and consent will be required by Anglian Water, under the Water Industry Act 1991. Contact Development Services Team 0345 606 6087. (2) INFORMATIVE - Notification of intention to connect to the public sewer under S106 of the Water Industry Act Approval and consent will be required by Anglian Water, under the Water Industry Act 1991. Contact Development Services Team 0345 606 6087. Protection of existing assets - A public sewer is shown on record plans within the land identified for the proposed development. It appears that development proposals will affect existing public sewers. It is recommended that the applicant contacts Anglian Water Development Services Team for further advice on this matter. Building over existing public sewers will not be permitted (without agreement) from Anglian Water. Building near to a public sewer - No building will be permitted within the statutory easement width of 3 metres from the pipeline without agreement from Anglian Water. Please contact Development Services Team on 0345 606 6087. The developer should note that the site drainage details submitted have not been approved for the purposes of adoption. If the developer wishes to have the sewers included in a sewer adoption agreement with Anglian Water (under Sections 104 of the Water Industry Act 1991), they should contact our Development Services Team on 0345 606 6087 at the earliest opportunity. Sewers intended for adoption should be designed and constructed in accordance with Sewers for Adoption guide for developers, as supplemented by Anglian requirements.
3 )The applicant should address the following points when submitting details to discharge conditions 4 and 8: Culverting of existing watercourses will not be permitted. There should be a minimum 1m between the base of a soakage unit and the seasonal water table. We will require a full set of calculations, providing evidence of all surface water retained on site for the 1 in 100 (+40%CC). Any exceedance should be shown with pathways with maximum depths and velocity. Any watercourses within or adjacent to the site should be included in the maintenance and management plan, even if there is no discharge to them. This would be a riparian ownership issue but leaving it as such is no longer acceptable. We will require full drainage drawings showing all connections, control features, storage, inverts etc. and how it communicates with the development wide scheme. Under Central Bedfordshire Council and IDB bylaws, any watercourse within or adjoining the site boundary will maintain a 9m development free easement (on the development side), unless otherwise agreed with the relevant drainage authority. This applies to all watercourses, where water is present for all or some of the year, including those not clearly stated on mapping, topography or planning documents. The connection of private surface water drainage systems to a highway system is not permitted. Permeable block paving should be laid to CIRIA C768 'Guidance on the construction of SuDS' guidelines. This guidance also stipulates following Interlay guidance. We expect the use of the SuDS management train, single point SuDS will be challenged. Where the use of permeable surfacing is proposed, this should be designed in accordance with the 'CIRIA RP992 The SuDS Manual Update: Paper RP992/28: Design Assessment Checklists for Permeable/Porous Pavement. The Council does not, and is not required to, adopt any SuDS feature. It is the responsibility of the applicant to ensure that the surface water drainage system, in its entirety, will be effectively maintained in the long-term. We therefore expect confirmation of the proposed arrangements for maintenance to be provided with the final detailed design, including the future maintenance and operational needs and the responsible bodies for undertaking maintenance (for all public and private drainage components). The final detailed design including proposed standards of operation, construction, structural integrity and ongoing maintenance must be compliant with the 'Non-statutory technical standards for sustainable drainage systems' (March 2015, Ref: PB14308), 'Central Bedfordshire Sustainable Drainage Guidance' (Adopted April 2014, Updated May 2015), and recognised best practise including the Ciria SuDS Manual (2016, C753).The applicant should address the following points when submitting details to discharge conditions 4 and 8: Culverting of existing watercourses will not be permitted. There should be a minimum 1m between the base of a soakage unit and the seasonal water table. We will require a full set of calculations, providing evidence of all surface water retained on site for the 1 in 100 (+40%CC). Any exceedance should be shown with pathways with maximum depths and velocity. Any watercourses within or adjacent to the site should be included in the maintenance and management plan, even if there is no discharge to them. This would be a riparian ownership issue but leaving it as such is no longer acceptable. We will require full drainage drawings showing all connections, control features, storage, inverts etc. and how it communicates with the development wide scheme. Under Central Bedfordshire Council and IDB bylaws, any watercourse within or adjoining the site boundary will maintain a 9m development free easement (on the development side), unless otherwise agreed with the relevant drainage authority. This applies to all watercourses, where water is present for all or some of the year, including those not clearly stated on mapping, topography or planning documents. The connection of private surface water drainage systems to a highway system is not permitted. Permeable block paving should be laid to CIRIA C768 'Guidance on the construction of SuDS' guidelines. This guidance also stipulates following Interlay guidance. We expect the use of the SuDS management train, single point SuDS will be challenged. Where the use of permeable surfacing is proposed, this should be designed in accordance with the 'CIRIA RP992 The SuDS Manual Update: Paper RP992/28: Design Assessment Checklists for Permeable/Porous Pavement. The Council does not, and is not required to, adopt any SuDS feature. It is the responsibility of the applicant to ensure that the surface water drainage system, in its entirety, will be effectively maintained in the long-term. We therefore expect confirmation of the proposed arrangements for maintenance to be provided with the final detailed design, including the future maintenance and operational needs and the responsible bodies for undertaking maintenance (for all public and private drainage components). The final detailed design including proposed standards of operation, construction, structural integrity and ongoing maintenance must be compliant with the 'Non-statutory technical standards for sustainable drainage systems' (March 2015, Ref: PB14308), 'Central Bedfordshire Sustainable Drainage Guidance' (Adopted April 2014, Updated May 2015), and recognised best practise including the Ciria SuDS Manual (2016, C753).
4 )The applicant is advised that the reserved matters for landscaping should include the hedgerow along the northern boundary to be retained at least a minimum of 3m in height.The applicant is advised that the reserved matters for landscaping should include the hedgerow along the northern boundary to be retained at least a minimum of 3m in height.
Appeal Received Date:This case has no appeals against it
Planning Obligation Status:Not available

Return to Search PageTop of Page