1. Return to Search Page >>2. Search Results >>3. Planning Application Detail
Details of Planning Application - CB/22/01915/FULL

Click on the Consultation link below for neighbour and statutory consultee information and to comment on this application. Ensure your opinions are received before the consultation closing date.


Application Details View Documents (opens in new window) Consultation
Application registeredConsultation periodAwaiting decisionDecidedAppealAppeal decided
Application Type:Full Application
Date Received:11 / 05 / 2022
Registration (Validation) Date:12 / 05 / 2022
Consultation Start Date:12 / 05 / 2022
Earliest Decision Date (Consultation Period Expires):23 / 06 / 2022
Target Date for Decision:07 / 07 / 2022
Location:Land to the rear of 22 Station Road, Lower Stondon, SG16 6JP
Parish Name:Stondon
Conservation Area:Not available
Listed Building Grade:Not available
Environmental Assessment:Not available
Expected Decision Level:Not available
Description:Erection of two detached dwellings
Case Officer:William Comber
Case Officer Tel:0300 300 6246
Case Officer Email:william.comber@centralbedfordshire.gov.uk
Status:Decided
Agent:Mr F Hickling
Kingsbrook House
7 Kingsway
Bedford
Beds
MK42 9BA
Press Date:No date
Site Notice Date:01 / 06 / 2022
NeighboursResponses Received: 11
and Representatives:In Favour: 0
Representation DetailsAgainst: 11
Comments: 0
Petitions Against: 0
Petitions For: 0
Officer Site Visit Date:No date
Committee Site Visit Date:No date
Committee Meeting Date:31 / 08 / 2022
Decision Level:Development Management Committee
Date Decision Made:31 / 08 / 2022
Date Decision Despatched:14 / 09 / 2022
Decision:Full Application - Granted
Conditions or Reasons:View Conditions or Reasons
Informative Notes:
1 )This permission relates only to that required under the Town & Country Planning Acts and does not include any consent or approval under any other enactment or under the Building Regulations. Any other consent or approval which is necessary must be obtained from the appropriate authority.This permission relates only to that required under the Town & Country Planning Acts and does not include any consent or approval under any other enactment or under the Building Regulations. Any other consent or approval which is necessary must be obtained from the appropriate authority.
2 )GDP Policy Informative Central Beds Local Plan In accordance with Article 35 (1) of the Town and Country Planning (Development Management Procedure) (England) Order 2015, the reason for any condition above relates to the Policies as referred to in the Central Bedfordshire Local Plan and the National Planning Policy Framework (NPPF).GDP Policy Informative Central Beds Local Plan In accordance with Article 35 (1) of the Town and Country Planning (Development Management Procedure) (England) Order 2015, the reason for any condition above relates to the Policies as referred to in the Central Bedfordshire Local Plan and the National Planning Policy Framework (NPPF).
3 )SuDS Condition requirements: We will require calculations, informed by BRE365 soakage testing, providing evidence of all surface water retained on site for the 1 in 100 (+40%CC). Any exceedance should be shown with pathways with maximum depths and velocity. This is then used to size soakaways. We will require confirmation of drainage drawing showing all connections, control features, storage, inverts etc. depending upon method utilised for disposal. Under Central Bedfordshire Council and IDB bylaws, any watercourse within or adjoining the site boundary will maintain a 9m development free easement (on the development side), unless otherwise agreed with the relevant drainage authority. This applies to all watercourses, where water is present for all or some of the year, including those not clearly stated on mapping, topography or planning documents. The connection of private surface water drainage systems to a highway system is not permitted. The Council does not, and is not required to, adopt any SuDS feature. It is the responsibility of the applicant to ensure that the surface water drainage system, in its entirety, will be effectively maintained in the long-term. We therefore expect confirmation of the proposed arrangements for maintenance to be provided with the final detailed design, including the future maintenance and operational needs and the responsible bodies for undertaking maintenance (for all public and private drainage components). The final detailed design including proposed standards of operation, construction, structural integrity and ongoing maintenance must be compliant with the 'Non-statutory technical standards for sustainable drainage systems' (March 2015, Ref: PB14308), 'Central Bedfordshire Sustainable Drainage Guidance' (Adopted April 2014, Updated May 2015), and recognised best practise including the Ciria SuDS Manual (2016, C753). Consent from a water authority must be secured to discharge surface water to an existing system.SuDS Condition requirements: We will require calculations, informed by BRE365 soakage testing, providing evidence of all surface water retained on site for the 1 in 100 (+40%CC). Any exceedance should be shown with pathways with maximum depths and velocity. This is then used to size soakaways. We will require confirmation of drainage drawing showing all connections, control features, storage, inverts etc. depending upon method utilised for disposal. Under Central Bedfordshire Council and IDB bylaws, any watercourse within or adjoining the site boundary will maintain a 9m development free easement (on the development side), unless otherwise agreed with the relevant drainage authority. This applies to all watercourses, where water is present for all or some of the year, including those not clearly stated on mapping, topography or planning documents. The connection of private surface water drainage systems to a highway system is not permitted. The Council does not, and is not required to, adopt any SuDS feature. It is the responsibility of the applicant to ensure that the surface water drainage system, in its entirety, will be effectively maintained in the long-term. We therefore expect confirmation of the proposed arrangements for maintenance to be provided with the final detailed design, including the future maintenance and operational needs and the responsible bodies for undertaking maintenance (for all public and private drainage components). The final detailed design including proposed standards of operation, construction, structural integrity and ongoing maintenance must be compliant with the 'Non-statutory technical standards for sustainable drainage systems' (March 2015, Ref: PB14308), 'Central Bedfordshire Sustainable Drainage Guidance' (Adopted April 2014, Updated May 2015), and recognised best practise including the Ciria SuDS Manual (2016, C753). Consent from a water authority must be secured to discharge surface water to an existing system.
4 )Highways Informative: 1/ The applicant is advised that no private surface water drainage system designed as part of a new development, will be allowed to enter any existing highway surface water drainage system. 2/ The contractor and / or client are to ensure that any mud or building material debris such as sand, cement or concrete that is left on the public highway, or any mud arising from construction/demolition vehicular movement, shall be removed immediately and in the case of concrete, cement, mud or mortar not allowed to dry on the highway. 3/ The applicant is advised that Central Bedfordshire Council as highway authority will not consider the proposed on-site vehicular areas for adoption as highway maintainable at public expense.Highways Informative: 1/ The applicant is advised that no private surface water drainage system designed as part of a new development, will be allowed to enter any existing highway surface water drainage system. 2/ The contractor and / or client are to ensure that any mud or building material debris such as sand, cement or concrete that is left on the public highway, or any mud arising from construction/demolition vehicular movement, shall be removed immediately and in the case of concrete, cement, mud or mortar not allowed to dry on the highway. 3/ The applicant is advised that Central Bedfordshire Council as highway authority will not consider the proposed on-site vehicular areas for adoption as highway maintainable at public expense.
5 )Contaminated Land Informative: The applicant is advised that it is their responsibility to ensure that final ground conditions are fit for the end use of the site. If during any site investigation, excavation, engineering or construction works evidence of land contamination is identified, the applicant shall notify the Local Planning Authority without delay. Any land contamination identified shall be remediated to the satisfaction of the Local Planning Authority to ensure that the site is made suitable for its end use.Contaminated Land Informative: The applicant is advised that it is their responsibility to ensure that final ground conditions are fit for the end use of the site. If during any site investigation, excavation, engineering or construction works evidence of land contamination is identified, the applicant shall notify the Local Planning Authority without delay. Any land contamination identified shall be remediated to the satisfaction of the Local Planning Authority to ensure that the site is made suitable for its end use.
Appeal Received Date:This case has no appeals against it
Planning Obligation Status:Not available

Return to Search PageTop of Page