Details of Planning Application - CB/22/03874/FULL

Click on the Consultation link below for neighbour and statutory consultee information and to comment on this application. Ensure your opinions are received before the consultation closing date.


Application Details View Documents (opens in new window) Consultation
Application registeredConsultation periodAwaiting decisionDecidedAppealAppeal decided
Application Type:Full Application
Date Received:03 / 10 / 2022
Registration (Validation) Date:04 / 10 / 2022
Consultation Start Date:04 / 10 / 2022
Earliest Decision Date (Consultation Period Expires):23 / 02 / 2023
Target Date for Decision:29 / 11 / 2022
Location:Water End Farm, 15 Water End Road, Maulden, Bedford, MK45 2BD
Parish Name:Maulden
Conservation Area:Not available
Listed Building Grade:Not available
Environmental Assessment:Not available
Expected Decision Level:Not available
Description:Conversion of barns to form residential dwelling including partial demolition and single storey extensions.
Case Officer:Julia Ward
Case Officer Tel:0300 300 4770
Case Officer Email:julia.ward@centralbedfordshire.gov.uk
Status:Decided
Agent:Mr J Shephard
1A King Edward Road
Bedford
MK41 9SF
Press Date:No date
Site Notice Date:12 / 10 / 2022
NeighboursResponses Received: 0
and Representatives:In Favour: 0
Representation DetailsAgainst: 0
Comments: 0
Petitions Against: 0
Petitions For: 0
Officer Site Visit Date:12/10/2022
Committee Site Visit Date:No date
Committee Meeting Date:22 / 02 / 2023
Decision Level:Development Management Committee
Date Decision Made:23 / 02 / 2023
Date Decision Despatched:23 / 02 / 2023
Decision:Full Application - Granted
Conditions or Reasons:View Conditions or Reasons
Informative Notes:
1 )GDP Policy Informative Central Beds Local Plan In accordance with Article 35 (1) of the Town and Country Planning (Development Management Procedure) (England) Order 2015, the reason for any condition above relates to the Policies as referred to in the Central Bedfordshire Local Plan and the National Planning Policy Framework (NPPF).GDP Policy Informative Central Beds Local Plan In accordance with Article 35 (1) of the Town and Country Planning (Development Management Procedure) (England) Order 2015, the reason for any condition above relates to the Policies as referred to in the Central Bedfordshire Local Plan and the National Planning Policy Framework (NPPF).
2 )This permission relates only to that required under the Town & Country Planning Acts and does not include any consent or approval under any other enactment or under the Building Regulations. Any other consent or approval which is necessary must be obtained from the appropriate authority.This permission relates only to that required under the Town & Country Planning Acts and does not include any consent or approval under any other enactment or under the Building Regulations. Any other consent or approval which is necessary must be obtained from the appropriate authority.
3 )The applicant is advised that, under the provisions of the Highways Act 1980, no part of the structure, including foundations and surface water hardware shall be erected or installed in, under or overhanging the public highway and no window shall be fixed so as to open outwards into the highway. The Highway Authority has the power under Section 143 of the Highways Act 1980, to remove any structure erected on a highway· The applicant is advised that no private surface water drainage system designed as part of a new development, will be allowed to enter any existing highway surface water drainage system.· The applicant is advised that the requirements of the New Roads and StreetWorks Act 1991 will apply to any works undertaken within the limits of the existing public highway. Further details can be obtained by this link on theCouncil websitehttp://www.centralbedfordshire.gov.uk/transport/request/dropped-kerb.aspx or contact Central Bedfordshire Council Tel: 0300 300 8301· The applicant is advised that parking for contractor's vehicles and the storage of materials and deliveries associated with this development should take place within the site and not extend into within the public highway without authorisation from the highway authority. If necessary the applicant is advised to contact TheStreet Works Co-ordinator, Central Bedfordshire Highways, by contacting the Highways Helpdesk 0300 300 8301. Under the provisions of the Highways Act1980 the developer may be liable for any damage caused to the public highway as a result of demolition/construction of the development hereby approved· The contractor and / or client are to ensure that any mud or building material debris such as sand, cement or concrete that is left on the public highway, or any mud arising from construction/demolition vehicular movement, shall be removed immediately and in the case of concrete, cement, mud or mortar not allowed to dry on the highway· The applicant is advised that all cycle parking to be provided within the site shall be designed in accordance with the Central Bedfordshire Council's 'Cycle Parking Annexes July 2010'.Comments and advice in this memo are based on the information supplied in the planning application and accompanying documents/plans and no liability is accepted for any inaccuracyThe applicant is advised that, under the provisions of the Highways Act 1980, no part of the structure, including foundations and surface water hardware shall be erected or installed in, under or overhanging the public highway and no window shall be fixed so as to open outwards into the highway. The Highway Authority has the power under Section 143 of the Highways Act 1980, to remove any structure erected on a highway· The applicant is advised that no private surface water drainage system designed as part of a new development, will be allowed to enter any existing highway surface water drainage system.· The applicant is advised that the requirements of the New Roads and StreetWorks Act 1991 will apply to any works undertaken within the limits of the existing public highway. Further details can be obtained by this link on theCouncil websitehttp://www.centralbedfordshire.gov.uk/transport/request/dropped-kerb.aspx or contact Central Bedfordshire Council Tel: 0300 300 8301· The applicant is advised that parking for contractor's vehicles and the storage of materials and deliveries associated with this development should take place within the site and not extend into within the public highway without authorisation from the highway authority. If necessary the applicant is advised to contact TheStreet Works Co-ordinator, Central Bedfordshire Highways, by contacting the Highways Helpdesk 0300 300 8301. Under the provisions of the Highways Act1980 the developer may be liable for any damage caused to the public highway as a result of demolition/construction of the development hereby approved· The contractor and / or client are to ensure that any mud or building material debris such as sand, cement or concrete that is left on the public highway, or any mud arising from construction/demolition vehicular movement, shall be removed immediately and in the case of concrete, cement, mud or mortar not allowed to dry on the highway· The applicant is advised that all cycle parking to be provided within the site shall be designed in accordance with the Central Bedfordshire Council's 'Cycle Parking Annexes July 2010'.Comments and advice in this memo are based on the information supplied in the planning application and accompanying documents/plans and no liability is accepted for any inaccuracy
4 )You are advised to note the comments of the Bedfordshire Fire and Rescue Service as set out below: The nearest existing fire hydrant is on Water End Road, approximately 150 metres from the furthest proposed dwelling. The developer must provide a fire hydrant in line with section B above otherwise we would object to this development. A hydrant fitted to the existing 3" main at the entrance to the site would be sufficient in this case.You are advised to note the comments of the Bedfordshire Fire and Rescue Service as set out below: The nearest existing fire hydrant is on Water End Road, approximately 150 metres from the furthest proposed dwelling. The developer must provide a fire hydrant in line with section B above otherwise we would object to this development. A hydrant fitted to the existing 3" main at the entrance to the site would be sufficient in this case.
5 )You are advised to note the comments of the CBC Flood Risk Officer as set out below: Culverting of existing watercourses will not be permitted. Any watercourses within or adjacent to the site should be included in the maintenance and management plan, even if there is no discharge to them. This would be a riparian ownership issue but leaving it as such is no longer acceptable. Under Central Bedfordshire Council and IDB bylaws, any watercourse within or adjoining the site boundary will maintain a 9m development free easement (on the development side), unless otherwise agreed with the relevant drainage authority. This applies to all watercourses, where water is present for all or some of the year, including those not clearly stated on mapping, topography or planning documents. The connection of private surface water drainage systems to a highway system is not permitted. Permeable block paving should be laid to CIRIA C768 'Guidance on the construction of SuDS' guidelines. This guidance also stipulates following Interlay guidance. The Council does not, and is not required to, adopt any SuDS feature. It is the responsibility of the applicant to ensure that the surface water drainage system, in its entirety, will be effectively maintained in the long-term. We therefore expect confirmation of the proposed arrangements for maintenance to be provided with the final detailed design, including the future maintenance and operational needs and the responsible bodies for undertaking maintenance (for all public and private drainage components). The final detailed design including proposed standards of operation, construction, structural integrity and ongoing maintenance must be compliant with the 'Non-statutory technical standards for sustainable drainage systems' (March 2015, Ref: PB14308), 'Central Bedfordshire Sustainable Drainage Guidance' (Adopted April 2014, Updated May 2015), and recognised best practise including the Ciria SuDS Manual (2016, C753). Land drainage Consent under the Land Drainage Act 1991 must be secured to discharge surface water to an existing watercourse/ditch, and details of this provided with the full detailed design. An easement should be provided on the developable side of the watercourse to allow for access for maintenance, this should be 9m but may depend on the maintenance requirements considered appropriate.You are advised to note the comments of the CBC Flood Risk Officer as set out below: Culverting of existing watercourses will not be permitted. Any watercourses within or adjacent to the site should be included in the maintenance and management plan, even if there is no discharge to them. This would be a riparian ownership issue but leaving it as such is no longer acceptable. Under Central Bedfordshire Council and IDB bylaws, any watercourse within or adjoining the site boundary will maintain a 9m development free easement (on the development side), unless otherwise agreed with the relevant drainage authority. This applies to all watercourses, where water is present for all or some of the year, including those not clearly stated on mapping, topography or planning documents. The connection of private surface water drainage systems to a highway system is not permitted. Permeable block paving should be laid to CIRIA C768 'Guidance on the construction of SuDS' guidelines. This guidance also stipulates following Interlay guidance. The Council does not, and is not required to, adopt any SuDS feature. It is the responsibility of the applicant to ensure that the surface water drainage system, in its entirety, will be effectively maintained in the long-term. We therefore expect confirmation of the proposed arrangements for maintenance to be provided with the final detailed design, including the future maintenance and operational needs and the responsible bodies for undertaking maintenance (for all public and private drainage components). The final detailed design including proposed standards of operation, construction, structural integrity and ongoing maintenance must be compliant with the 'Non-statutory technical standards for sustainable drainage systems' (March 2015, Ref: PB14308), 'Central Bedfordshire Sustainable Drainage Guidance' (Adopted April 2014, Updated May 2015), and recognised best practise including the Ciria SuDS Manual (2016, C753). Land drainage Consent under the Land Drainage Act 1991 must be secured to discharge surface water to an existing watercourse/ditch, and details of this provided with the full detailed design. An easement should be provided on the developable side of the watercourse to allow for access for maintenance, this should be 9m but may depend on the maintenance requirements considered appropriate.